Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹15.3 LAdmitted-Fee/PreQual/Technical/Finance 00 KHILANGANJ GT ROAD SASARAM ROHTAS BIHAR 821115 | ROHTAS | BIHAR | 821115 | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹15.8 L+₹53,953.38 (3.53%)Admitted-Fee/PreQual/Technical/Finance AT NIRMAL NAGAR MANJI TOLA ADITYAPUR MAIN ROAD ADITYAPUR | ADITYAPUR | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹18.0 L
EMD Value
₹36,000
Closing Date
21 Sept 2026, 5:00 pmClosed
MC Muncipal Corporation Adityapur
Kalpanapuri, Adityapur
Construction of PCC Road from Hari Mandir to Sonu Maachhua in Ward No. 14 under AMC
2026_UDD_118518_22
UDD/AMC/09/2025-26 3RD CALL
Open Tender
Civil Works
Percentage
120 days
Ward No. 14
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹36,000
Yes
25 Sept 2026
10 Sept 2026
23 Sept 2026
10 Sept 2026
21 Sept 2026
10 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Granular Sub-Base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 4.01. [RCD 4.1 a (ii)] | 58.56 | Per M3 | 1,458.8 | ₹85,427.33 |
| 2 | Providing and laying in position cement concrete of grade M-20 with nominal mix (1:1.5:3) excluding the cost of centering and shuttering - All work up to plinth level. [BCD 5.3.1.1] | 223.26 | Per M3 | 4,961.73 | ₹11,07,755.84 |
| 3 | Centering and shuttering including strutting, propping etc….do….do….E/I.
[BCD 5.3.17.1] | 123.46 | Per M2 | 194.5 | ₹24,012.97 |
| 4 | Construction of sub-grade and earthen shoulder with approved material obtained from borrow pits with all its leads,transporting to site,spreading,grading to required slope and compacting to meet requirement of Table 300-2[RCD 305] | 36.6 | Per M3 | 123 | ₹4,501.8 |
| 5 | Carriage of Materials | - | - | - | - |
| 6 | Sand 1Km(K) + 5Km(P) | 96 | Per M3 | 357.4 | ₹34,310.4 |
| 7 | Cement 5Km(P) | 91.95 | Per MT | 456.1 | ₹41,938.4 |
| 8 | Chips 1Km(K) + 40Km(P) | 249.8 | Per M3 | 744.28 | ₹1,85,921.14 |
| 9 | Stone Dust 1Km(K) + 14 KM(P) | 24.77 | Per M3 | 744.28 | ₹18,435.82 |
| 10 | Add 18% GST | 1 | Each | 2,70,415.14 | ₹2,70,415.14 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
BOQ_160273.xls
BOQ • 0.27 MB
terms_conditions.pdf
Tender Documents • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .