| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 CrAccepted-AOC D 245 SECTOR 10 NOIDA 201301 UTTAR PRADESH | NOIDA | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | ₹3.8 Cr | L1 | Accepted-AOC Being L1 |
| 2 | L2₹6.9 Cr+₹3.0 Cr (79.1%)Rejected-Finance 137M 137 N OM SHANLI COMPLEX HOPE COLLEGE AVINASHI ROAD COIMBATORE PIN 641004 | COIMBATORE | COIMBATORE | TAMIL NADU | 641004 | ₹6.9 Cr+₹3.0 Cr (79.1%) | L2 | Rejected-Finance Not being L1 |
| 3 | L3₹7.0 Cr+₹3.1 Cr (81.8%)Rejected-Finance AT B2 509 BHOOMERANG OFF CHANDIVALI FARM ROAD CHANDIVALI ANDHERI C MUMBAI 400072 | MUMBAI SUBURBAN | MAHARASHTRA | 400072 | ₹7.0 Cr+₹3.1 Cr (81.8%) | L3 | Rejected-Finance Not being L1 |
| 4 | Not Admitted-Fee/PreQual/Technical 1506 15TH FLOOR CORPORATE PARK SECTOR 18 PLOT NO 14 15 VASHI NAVI MUMBAI 400 703 | NAVI MUMBAI | THANE | MAHARASHTRA | 400703 | - | - | Not Admitted-Fee/PreQual/Technical Others-EMD received late on 01.04.26 last date was 30.03.26. |
| Sl No | Description | Qty | Unit | pioneer foundation engineers pvt. ltd. L3 | PAVAI INFRA GEOTECH L2 | AECS ENGINEERING & GEOTECHNICAL SERVICES PVT. LTD. L1 |
|---|---|---|---|---|---|---|
| 1.00 | Conducting pull out tests as per IS 11309 code for determining in-situ parameters for design of most economical slope retention system. Cost to include all necessary equipments, platforms safety arrangements, installation of Self - Drilling anchor R32-210, having Nominal OD of 32mm and Internal average dia of 21mm and minimum nominal weight of 2.65kg/Meter of the specified length and nominal maximum force Fy>= 210KN also grouting the same with M30 grade grout etc. as specified by Engineer Incharge. | 1 | Nos | 15,000 ₹15,000 Lowest | 25,000 ₹25,000 | 1,00,000 ₹1,00,000 |
| 2.00 | Preparing numerical analysis and design of slope retention system for 2200 Chainage area using input parameters viz. pull out tests values, various physical and shear parameters from geotechnical investigation report (Geotechnical investigation report to be provided by the dept.) including preparation of construction drawings, detalied specification, construction methodology, material specification etc. as specified by Engineer Incharge. | 1 | Nos | 2,50,000 ₹2,50,000 | 5,00,000 ₹5,00,000 | 1,00,000 ₹1,00,000 Lowest |
| 3.00 | Vetting of Design report for Ch 2200 hill slope protection by IITs/VJTI | 1 | Nos | 4,00,000 ₹4,00,000 Lowest | 5,00,000 ₹5,00,000 | 5,00,000 ₹5,00,000 |
| 4.00 | Providing and laying GEOGRID in 3 layers knitted and PVC coated Polyester having minimum tensile strength of 150kN/m, indigenously manufactured from selected high tenacity polyester yarn with high molecular weight (>25000g/mol),and low carboxyl end group (<30 mm mol/Kilogram) (extruded Geogrid & Polyester strip & Geostrip,steel strips not allowed & not accepted) with granular fill as per design prepared by technical provider of reinforced earth wall and slope. The reinforced earth wall and slope should have 100% coverage of 5m width knitted and PVC coated Polyester geogrid. (Coating of Geogrid/Reinforcing geosynthetic material with LDPE, Latex, Bitumen and any other coating will not be allowed and will not be accepted) for reinforced soil wall and reinforced slope application, etc. Complete (Specification: MORTH Section-3100). with prior approval of concerned Engineer - in - Charge. | 1,050 | SqM | 750 ₹7,87,500 | 550 ₹5,77,500 Lowest | 1,500 ₹15,75,000 |
| 5.00 | Providing and laying, spreading and compacting granular sub-base (GSB) material 300 mm thick (150 mm thick in each layer) compacted layer of crushed sand, murrum, gravel crushed stone and combination there of as per specification including spreading on the prepared sub grade, maintaining the required slope and grade and cross fall (camber) etc. complete as directed by the Engineer-in-charge (Compacted thickness only will be measured and paid for relevant item) | 420 | CuM | 2,400 ₹10,08,000 | 1,900 ₹7,98,000 Lowest | 3,000 ₹12,60,000 |
| 6.00 | Earth work excavation by mechanical means (Hydraulic excavator) / manual means in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom etc. including shoring and dewatering (if necessary) and refilling with selected excavated earth in layers of not more than 500 mm thick, each layer well rammed and consolidated including disposing the surplus earth within a distance of 200 m all as per specifications including clearing Jungle, uprooting of vegetation, grass, etc. complete and as directed by the Engineer-in-charge. From 0.00 to 1.50 m depth from Average Ground Level. | 525 | CuM | 350 ₹1,83,750 | 75 ₹39,375 Lowest | 1,000 ₹5,25,000 |
| 7.00 | Earth work excavation by mechanical means (Hydraulic excavator) / manual means in foundation, in Soft Rock including shoring, dewatering if necessary, dressing the sides, ramming the bottom, refilling the sides etc. with available selected excavated earth in layers of not exceeding 500 mm in depth, each layer well rammed and consolidated disposal of surplus excavated material within a lead of 200 m complete as per specifications and as directed by the Engineer-in-charge. From 0.00 to 1.50 m depth from Average Ground Level. | 525 | CuM | 550 ₹2,88,750 | 75 ₹39,375 Lowest | 1,000 ₹5,25,000 |
| 8.00 | Scrubbing loose boulders of any size on the surface, collecting the loose boulders at the top of slope including all lifts & machinery etc. complete and disposing of material from hill slope within BARC area as directed by Engineer - in - charge. | 2,100 | SqM | 1,200 ₹25,20,000 | 50 ₹1,05,000 Lowest | 500 ₹10,50,000 |
| 9.00 | Removal of vegetation, bushes, shrubs in lower and upper section including stacking of useful material, disposing of material from hill slope within BARC area as directed by Engineer - in - charge. | 2,100 | SqM | 75 ₹1,57,500 | 50 ₹1,05,000 Lowest | 500 ₹10,50,000 |
| 10.00 | Providing and laying in position Reinforced Cement Concrete (RCC) of grade M-30 using 20mm maximum size aggregates and crushed sand of approved quality including admixtures of approved brand and quality (plasticiser or super plasticiser) if required, including weigh batching, mechanical mixing, transporting, placing, vibrating, consolidation, finishing, curing etc. complete but excluding the cost of centering, shuttering and reinforcement complete as per specifications up to Plinth Level. Note: The minimum cement content for RCC works should be as per the latest revision of the relevant IS code. | 107 | CuM | 10,000 ₹10,70,000 Lowest | 10,000 ₹10,70,000 Lowest | 10,000 ₹10,70,000 Lowest |
Tender Value
₹7.9 Cr
EMD Value
₹18.7 L
Closing Date
20 Mar 2026, 3:00 pmClosed
Chief Engineer, CED
CED, BARC, Trombay, Mumbai.
Hill Protection work to stabilise CISF Patrolling Road near Ch 2200, Lalbatti, North Site, BARC, Trombay, Mumbai.
2026_BARC_896902_1
BARC/CED/ET/81/2025-2026 Date 03/02/2026
Open Tender
Civil Works
Item Rate
425 days
Lalbatti, North Site, BARC, Trombay, Mumbai.
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹18.7 L
Civil Engineering Division, Bhabha Atomic Research
7 Aug 2026
6 Feb 2026
25 Mar 2026
6 Feb 2026
20 Mar 2026
2 Mar 2026
6 Feb 2026 - 18 Feb 2026
20 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Conducting pull out tests as per IS 11309 code for determining in-situ parameters for design of most economical slope retention system. Cost to include all necessary equipments, platforms safety arrangements, installation of Self - Drilling anchor R32-210, having Nominal OD of 32mm and Internal average dia of 21mm and minimum nominal weight of 2.65kg/Meter of the specified length and nominal maximum force Fy>= 210KN also grouting the same with M30 grade grout etc. as specified by Engineer Incharge. | 1 | Nos | - | - |
| 2 | Preparing numerical analysis and design of slope retention system for 2200 Chainage area using input parameters viz. pull out tests values, various physical and shear parameters from geotechnical investigation report (Geotechnical investigation report to be provided by the dept.) including preparation of construction drawings, detalied specification, construction methodology, material specification etc. as specified by Engineer Incharge. | 1 | Nos | - | - |
| 3 | Vetting of Design report for Ch 2200 hill slope protection by IITs/VJTI | 1 | Nos | - | - |
| 4 | Providing and laying GEOGRID in 3 layers knitted and PVC coated Polyester having minimum tensile strength of 150kN/m, indigenously manufactured from selected high tenacity polyester yarn with high molecular weight (>25000g/mol),and low carboxyl end group (<30 mm mol/Kilogram) (extruded Geogrid & Polyester strip & Geostrip,steel strips not allowed & not accepted) with granular fill as per design prepared by technical provider of reinforced earth wall and slope. The reinforced earth wall and slope should have 100% coverage of 5m width knitted and PVC coated Polyester geogrid. (Coating of Geogrid/Reinforcing geosynthetic material with LDPE, Latex, Bitumen and any other coating will not be allowed and will not be accepted) for reinforced soil wall and reinforced slope application, etc. Complete (Specification: MORTH Section-3100). with prior approval of concerned Engineer - in - Charge. | 1,050 | SqM | - | - |
| 5 | Providing and laying, spreading and compacting granular sub-base (GSB) material 300 mm thick (150 mm thick in each layer) compacted layer of crushed sand, murrum, gravel crushed stone and combination there of as per specification including spreading on the prepared sub grade, maintaining the required slope and grade and cross fall (camber) etc. complete as directed by the Engineer-in-charge (Compacted thickness only will be measured and paid for relevant item) | 420 | CuM | - | - |
| 6 | Earth work excavation by mechanical means (Hydraulic excavator) / manual means in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom etc. including shoring and dewatering (if necessary) and refilling with selected excavated earth in layers of not more than 500 mm thick, each layer well rammed and consolidated including disposing the surplus earth within a distance of 200 m all as per specifications including clearing Jungle, uprooting of vegetation, grass, etc. complete and as directed by the Engineer-in-charge. From 0.00 to 1.50 m depth from Average Ground Level. | 525 | CuM | - | - |
| 7 | Earth work excavation by mechanical means (Hydraulic excavator) / manual means in foundation, in Soft Rock including shoring, dewatering if necessary, dressing the sides, ramming the bottom, refilling the sides etc. with available selected excavated earth in layers of not exceeding 500 mm in depth, each layer well rammed and consolidated disposal of surplus excavated material within a lead of 200 m complete as per specifications and as directed by the Engineer-in-charge. From 0.00 to 1.50 m depth from Average Ground Level. | 525 | CuM | - | - |
| 8 | Scrubbing loose boulders of any size on the surface, collecting the loose boulders at the top of slope including all lifts & machinery etc. complete and disposing of material from hill slope within BARC area as directed by Engineer - in - charge. | 2,100 | SqM | - | - |
| 9 | Removal of vegetation, bushes, shrubs in lower and upper section including stacking of useful material, disposing of material from hill slope within BARC area as directed by Engineer - in - charge. | 2,100 | SqM | - | - |
| 10 | Providing and laying in position Reinforced Cement Concrete (RCC) of grade M-30 using 20mm maximum size aggregates and crushed sand of approved quality including admixtures of approved brand and quality (plasticiser or super plasticiser) if required, including weigh batching, mechanical mixing, transporting, placing, vibrating, consolidation, finishing, curing etc. complete but excluding the cost of centering, shuttering and reinforcement complete as per specifications up to Plinth Level. Note: The minimum cement content for RCC works should be as per the latest revision of the relevant IS code. | 107 | CuM | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.10 MB
Tendernotice_2.pdf
PDF • 1.51 MB
BOQ_942745.xls
BOQ • 0.34 MB
ScheduleAET81.pdf
Tender Documents • 0.64 MB
FormAtoHTechbidET81.xls
Tender Documents • 0.14 MB
ProformaofscheduleAtoFET-81.pdf
Tender Documents • 2.23 MB
LetteroftransmittalET81.pdf
Tender Documents • 0.18 MB
eCorrigendumNo02extensionofdates.pdf
PDF • 0.26 MB
eCorrigendumNo01AdditionalquerriesreplyET81.pdf
PDF • 1.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .