Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.5 LAccepted-AOC WARD NO 21 LIG 136 R P NAGAR KORBA CHHATTISGARH PIN 495677 | KORBA | CHHATTISGARH | 495677 | ₹30.5 L Quoted ₹25.8 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹25.9 LRejected-AOC | ₹25.9 L | L2 | Rejected-AOC L2 bidder |
| 3 | L3₹26.1 LRejected-AOC 496665 | RAIGARH | CHHATTISGARH | 496665 | ₹26.1 L | L3 | Rejected-AOC L3 Bidder |
| 4 | Rejected-Technical 31 B HOUSING BOARD COLONY RAMPUR KOSABADI KORBA KOSABADI KORBA CHHATTISGARH 495677 UDYAM CG 10 0005774 | KORBA | CHHATTISGARH | 495677 | - | - | Rejected-Technical Not Qualified in techno commercial evaluation |
| Sl No | Description | Qty | Unit | SANTOSH KUMAR SINGH L3 | UTILITY ENTERPRISES L1 | RAJ KUMAR SHARMA L2 |
|---|---|---|---|---|---|---|
| 1.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size). | 278.96 | Cubic Meter | 8,183.07 ₹22.8 L | 8,070 ₹22.5 L | 8,075 ₹22.5 L |
| 2.00 | Loading of material (Cement) into tub on surface within a lead of 50m. | 88.43 | Metric Tonne | 244.56 ₹21,626.73 | 241 ₹21,311.63 | 243 ₹21,488.49 |
| 3.00 | Loading of material (Sand) into tub on surface within a lead of 50m. | 120.27 | Cubic Meter | 422.11 ₹50,767.58 | 416 ₹50,032.32 | 418 ₹50,272.86 |
| 4.00 | Loading of material (stone aggregate below 40mm nominal size) into tub on surface within a lead of 50m. | 240.53 | Cubic Meter | 422.11 ₹1.0 L | 416 ₹1.0 L | 418 ₹1.0 L |
| 5.00 | Unloading of material (Cement) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate) | 88.43 | Metric Tonne | 222.45 ₹19,671.01 | 221 ₹19,543.03 | 225 ₹19,896.75 |
| 6.00 | Unloading of material (Sand) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate) | 120.27 | Cubic Meter | 383.95 ₹46,177.97 | 392 ₹47,145.84 | 400 ₹48,108 |
| 7.00 | Unloading of material (stone aggregate below 40mm nominal size) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate) | 240.53 | Cubic Meter | 383.95 ₹92,352.09 | 392 ₹94,287.76 | 400 ₹96,212 |
| 8.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹28.3 L
EMD Value
₹35,400
Closing Date
13 Nov 2025, 11:00 amClosed
Staff Officer Mining SECL Korba Area
Office of the General Manager Korba Area Post and District Korba Chhattisgarh
Construction of cement concrete foundation to install electrical equipment (ACB, VCB, Stater, Controller, Resistance, Thruster Stater) and flooring in travelling roadway 41D from 0L to 10L, flooring in haulage dip from pit mouth to 2L with constructi
2025_SECL_346499_1
SECL/KB/GM/SO(M)/eNIT/25-26/16
Open Tender
Civil Works - Others
180 days
Korba
As per NIT
4 documents required · 4 mandatory
₹35,400
19 Jan 2026
1 Nov 2025
14 Nov 2025
1 Nov 2025
13 Nov 2025
3 Nov 2025
1 Nov 2025 - 6 Nov 2025
Amount
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size).
Loading of material (Cement) into tub on surface within a lead of 50m.
Loading of material (Sand) into tub on surface within a lead of 50m.
Loading of material (stone aggregate below 40mm nominal size) into tub on surface within a lead of 50m.
Unloading of material (Cement) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate)
Unloading of material (Sand) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate)
Unloading of material (stone aggregate below 40mm nominal size) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate)
Total impact of GST for the purpose of CTC
RAJ KUMAR SHARMA (BID ID -1196275)
SANTOSH KUMAR SINGH (BID ID -1195949)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.36 MB
Tendernotice_2.pdf
PDF • 0.43 MB
Tendernotice_3.pdf
PDF • 0.65 MB
BOQ_359245.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid