Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC DELHI ALWAR ROAD SADDIQ NAGAR DISTRICT NUH 122107 | NUH | HARYANA | 122107 | ₹4.1 L Quoted ₹3.7 L | L1 | Accepted-AOC L-1 |
| 2 | L2₹4.0 L+₹27,729 (7.48%)Rejected-AOC | ₹4.0 L+₹27,729 (7.48%) | L2 | Rejected-AOC L-2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/s M.K. Construction Co. L1 | CHHOTU INFRATECH L2 |
|---|---|---|---|---|---|
| 1.00 | -RENTED GENERATOR | 2 | Per day | 10,782.25 ₹21,564.5 Lowest | 12,000 ₹24,000 |
| 2.00 | -Repairing of winch hoist Machine Assy with Shaft,
coupling, Plummer block rope drum and centering pully etc. | 1 | Each | 91,375 ₹91,375 Lowest | 99,000 ₹99,000 |
| 3.00 | Bottom seal (80x10 mm) | 2.1 | Metre | 419.25 ₹880.43 Lowest | 450 ₹945 |
| 4.00 | Bulb type seal ( 44x100 mm) | 4.3 | Metre | 419.25 ₹1,802.78 Lowest | 450 ₹1,935 |
| 5.00 | Complete cleaning, oiling, greasing of hoist system
of all gates. Including all cost of material, labor, scaffolding,
TandP and safety equipment etc. | 1 | Per job | 5,375 ₹5,375 Lowest | 6,000 ₹6,000 |
| 6.00 | credit of scrap of old and damaged gates | 815.5 | Kg. | 37.63 ₹-30,687.27 | 35 ₹-28,542.5 Lowest |
| 7.00 | Hire Charges of Hydra | 6 | Hours | 2,687.5 ₹16,125 | 2,500 ₹15,000 Lowest |
| 8.00 | New Gate with 8 mm sheet complete in all respect. | 4.52 | Sqm | 37,625 ₹1,70,065 Lowest | 40,000 ₹1,80,800 |
| 9.00 | Nut Bults 10x60 mm | 44 | Each | 26.88 ₹1,182.72 Lowest | 35 ₹1,540 |
| 10.00 | Nut Bults 10x70 mm | 46 | Each | 37.63 ₹1,730.98 Lowest | 40 ₹1,840 |
Tender Value
₹3.8 L
EMD Value
₹7,600
Closing Date
18 Sept 2026, 2:45 pmClosed
MANJEET SINGH
Inter State and Liasion Division Delhi
Estimate for replacement of old damaged iron gate with mechanism of Lampur
2026_HRY_547106_1
2026EB3841F8 F2F2 4A21 A7E6 B8A508004883132IRR
Open Tender
Civil Works
Works
60 days
DELHI
Estimate for replacement of old damaged iron gate with mechanism of Lampur
2 documents required · 2 mandatory
₹500
₹7,600
Yes
21 Sept 2026
12 Sept 2026
18 Sept 2026
12 Sept 2026
18 Sept 2026
12 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | -RENTED GENERATOR | 2 | Per day | 10,030 | ₹20,060 |
| 2 | -Repairing of winch hoist Machine Assy with Shaft,
coupling, Plummer block rope drum and centering pully etc. | 1 | Each | 85,000 | ₹85,000 |
| 3 | Bottom seal (80x10 mm) | 2.1 | Metre | 390 | ₹819 |
| 4 | Bulb type seal ( 44x100 mm) | 4.3 | Metre | 390 | ₹1,677 |
| 5 | Complete cleaning, oiling, greasing of hoist system
of all gates. Including all cost of material, labor, scaffolding,
TandP and safety equipment etc. | 1 | Per job | 5,000 | ₹5,000 |
| 6 | credit of scrap of old and damaged gates | 815.5 | Kg. | 35 | ₹28,542.5 |
| 7 | Hire Charges of Hydra | 6 | Hours | 2,500 | ₹15,000 |
| 8 | New Gate with 8 mm sheet complete in all respect. | 4.52 | Sqm | 35,000 | ₹1,58,200 |
| 9 | Nut Bults 10x60 mm | 44 | Each | 25 | ₹1,100 |
| 10 | Nut Bults 10x70 mm | 46 | Each | 35 | ₹1,610 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_626756.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .