Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
₹1 L
Closing Date
6 Jan 2022, 6:55 pmClosed
Executive Engineer REW Div. Poonch
Office of the Executive Engineer REW Div. Poonch
Please refer to BOQ
2021_RDPR_155442_4
e-NIT No. 454 of REW Poonch Dated 28-12-2021
Open Tender
Civil Works
Item Rate
20 days
Mankote
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Yes
Executive Engineer REW Div. Poonch
Exempted
19 Jan 2022
30 Dec 2021
7 Jan 2022
30 Dec 2021
6 Jan 2022
30 Dec 2021
Amount
Earthwork in excavation by manual means in trenches for foundations, drains, pipes, cables etc (not exceeding 1.5 m in width) and for shafts, valves, cess pits and the area not exceeding 10 sq m in plan, depth up to 1.5 m including disposal of the excavated earth up to 1 m from cutting edge, disposed earth to be levelled and nearly dressed in; All kinds of soil
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size).
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 20% stone
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) .
6 mm cement plaster to ceiling of mix 1 : 3 (1 cement : 3 fine sand)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Mild steel and medium tensile steel bars
Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. foundation
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
Suspended floors, roofs, landings, balconies and access platforms.
a) Sand & Bajri with average distance 26 km by MT & 500 mtr by H/L
b) Cement with average distance 12 km by MT & 500 mtr by H/L.
c) Stone with average distance 500 mtr by H/L
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .