Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.5 LAccepted-AOC 0 SHANKERPURI COLONY SAHARANPUR BEHAT ROAD NEAR DEHAT KOTWALI SAHARANPUR UTTAR PRADESH 247001 | SAHARANPUR | UTTAR PRADESH | 247001 | 1 | Accepted-AOC Eligible L-1 Bidder | |
| 2 | 2₹5.9 L+₹34,153.07 (6.19%)Rejected-Finance 100 33 1 R G S ROAD USHAGRAM ASANSOL SALANPUR PASCHIM WEST BURDWAN BARDHAMAN 713303 WEST BENGAL INDIA | ASANSOL | PASCHIM BARDHMAN | WEST BENGAL | 713303 | 2 | Rejected-Finance Quoted Rate more than L-1 Bidder | |
| 3 | 3₹6.2 L+₹68,262.63 (12.4%)Rejected-Finance SOUTH DHADKA SUKANTA PALLY ASANSOL 713302 BURDWAN WEST BENGAL | ASANSOL | BURDWAN | WEST BENGAL | 713302 | 3 | Rejected-Finance Quoted Rate more than L-1 Bidder |
Tender Value
₹5.4 L
EMD Value
₹6,800
Closing Date
30 May 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AE EnM
Sonepur Bazari Area
Complete repairing/rewinding of 290kW, 6.6kV 3 phase Induction motor make Marathon Sl. no. 3F661042/2 of S. B. Project.
2024_ECL_308216_1
GM/SBA/EnM/e-Tender/24-25/01
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Sonepur Bazari Area
Please refer tender documents
5 documents required · 5 mandatory
₹6,800
25 Jul 2024
18 May 2024
1 Jun 2024
20 May 2024
30 May 2024
20 May 2024
20 May 2024 - 23 May 2024
Amount
Item Description/ Heading
Material Cost
Supply of new electrolyte grade super enameled copper strips.
Supply of Glass Fiber wool (H-Class) for covering DFGC on bare copper conductor.
Supply of Glass Mica Polyester (GMP) tape.
Supply of Nomex paper for starter core insulation.
Supply of Kaftans tape for interlayer insulation of stator coils.
Supply of Varnish.
Supply of thinner.
Cost of single core HT XLPE 70 Sq.mm Copper Cable.
Supply of silicon base glass wedges.
Cost of Fabrication of both side bearing housing by metallization & machining as per bearing size.
Dynamic balancing of the Rotor.
Transportation charges Up & Down.
Less: Cost of Scrap copper wire.
Labour Cost:-
Labour charges for Dismantling of complete motor.
Labour charges for taking out Stator coils from the stator core slots & Cleaning & decarburizing of core slots.
Labour charges for formation of coil with the converted DFGC copper conductor inserting the stator coil in the core, insulation of overhang portion of the coil with GMP tape, inter connection of coils & other related job.
Fixing of silicon base glass wedges.
Cost of Fabrication of both side bearing housing by metallization & machining as per bearing size.
Final assembly of complete motor with all dismantled parts after proper baking & pre-delivery testing.
P. F. amount for labour cost
Total impact of GST for the purpose of CTC
ELECTRO POWER INDUSTRIES
CITY ELECTRIC
techsummary_319368.pdf
PDF • 0.75 MB
finsummary_319368.pdf
PDF • 0.75 MB
308216.pdf
PDF • 0.70 MB
finance_319368.pdf
PDF • 0.25 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .