Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-AOC | ₹3.4 L | L1 | Accepted-AOC LOW RATE QUOTED |
| 2 | L2₹3.5 LRejected-Finance | ₹3.5 L | L2 | Rejected-Finance High Rate Quoted |
| Sl No | Description | Qty | Unit | G.Vijaya Constractor L1 | N VENKATESAN L2 |
|---|---|---|---|---|---|
| 1.00 | Earth Work Excavation and depositing on bank with initial lead of 10 mts and initial of 2.0 in hard stiff clay stiff black cotton soil, hard red earth shales, murram, gravel, sroney earth and earth mixed with 50% fair sized oulders and gravelly soil etc., complete for boxing as per IS 20B | 315 | m3 | 308 ₹97,020 | 310 ₹97,650 |
| 2.00 | Refilling Excavated earth and all labour charges, etc | 315 | m2 | 42.5 ₹13,387.50 | 43 ₹13,545 |
| 3.00 | Cost and Supply of 90 mm 6 Ksc PVC Pipe | 500 | RM | 142 ₹71,000 | 144 ₹72,000 |
| 4.00 | Towards the Labour Charges for Laying PVC Pipe | 500 | RM | 22 ₹11,000 | 23 ₹11,500 |
| 5.00 | Towards cost and supply of 7.5 HP Motor | 79,973 | No | 79,900 ₹79,900 | 80,000 ₹80,000 |
| 6.00 | Towards cost for erection of Motor | 15,000 | No | 15,000 ₹15,000 | 16,000 ₹16,000 |
| 7.00 | Towards cost and Supply of Specials | 1,000 | No | 1,000 ₹1,000 | 5,000 ₹5,000 |
| 8.00 | GST 18% | 1 | No | 51,895.35 ₹51,895.35 | 53,225.1 ₹53,225.10 |
| 9.00 | LWF 1% | 1 | No | 2,883.08 ₹2,883.08 | 2,956.95 ₹2,956.95 |
Updated dates
Tender Value
₹3.5 L
EMD Value
₹3,500
Closing Date
6 Jan 2026, 4:00 pmClosed
BLOCK DEVELOPMENT OFFICER
BLOCK DEVELOPMENT OFFICE
Providing Pipeline (500m) With 7.5 HP Motor to OHT From River to Well at Kazhiyur
2026_RDTN_638754_1
A6/565/25-KAZHIYUR PIPELINE
Open Tender
Civil Works
90 days
BLOCK DEVELOPMENT OFFICE
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,500
7 Mar 2026
3 Jan 2026
6 Jan 2026
3 Jan 2026
6 Jan 2026
3 Jan 2026
Amount
Earth Work Excavation and depositing on bank with initial lead of 10 mts and initial of 2.0 in hard stiff clay stiff black cotton soil, hard red earth shales, murram, gravel, sroney earth and earth mixed with 50% fair sized oulders and gravelly soil etc., complete for boxing as per IS 20B
Refilling Excavated earth and all labour charges, etc
Cost and Supply of 90 mm 6 Ksc PVC Pipe
Towards the Labour Charges for Laying PVC Pipe
Towards cost and supply of 7.5 HP Motor
Towards cost for erection of Motor
Towards cost and Supply of Specials
N VENKATESAN (BID ID -1555202)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
BOQ_764453.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid