| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAccepted-AOC JHANSI | JHANSI | UTTAR PRADESH | 284001 | ₹2.5 Cr | L1 | Accepted-AOC Financial bid accepted |
| 2 | L2₹2.5 CrRejected-Finance | ₹2.5 Cr | L2 | Rejected-Finance L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2.6 Cr
EMD Value
₹14.9 L
Closing Date
13 Mar 2026, 12:00 pmClosed
S.E, Jhansi Circle, P.W.D., Jhansi
Office of the S.E, Jhansi Circle, P.W.D., Jhansi
New construction work of link road from Dumrai (Tigaila) to village Kairokhar in Jhansi district
2026_CEJNS_1122610_1
1580/ 44 C- Jhansi Circle/2025 Date 28.02.2026
Open Tender
Civil Works - Roads
365 days
Jhansi
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,550
₹14.9 L
Yes
Office of the S.E, Jhansi Circle, P.W.D., Jhansi
5 May 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
9 Mar 2026
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
Construction of sub-grade by providing borrow pit material with 2% Lime , spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
Providing,laying and spreading material on a prepared sub grade,adding cement @2% by weight to the spread material manualy, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strenght and to form a layer of sub base.
Providing, laying,and spreading material on a prepared sub base cement @ 4% by weight to the spread material manualy mixing in place with rotavetor and compacting with the road roller at OMC to achieve the desired unconfirmed compresive strength and to from a layer of base.
Providing and applying tack coat with Bitumen (VG-10) using Bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen (VG-10 Gr.) to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of "Type-C" as per Technical Specification Clause 508.
Providing and laying seal coat by mannual means with VG-10 Gr. grade bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type "C" as per Technical Specification Clause 510
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.11.1 (I)
Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9 sand filling 11.2(I)
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 11.4 (I)(i) M-10
Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203. 11.6 (III)(ii)
Providing & Laying reinforced concrete pipe NP3 for culverte on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation,protection work ,back filling,concrete and masonary works in head walls and parapits colouse 1106(for 350 mm dia).
Providing & Laying reinforced concrete pipe NP3 for culverte on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation,protection work ,back filling,concrete and masonary works in head walls and parapits colouse 1106(for 1000 mm dia).
Raised pointing with cement and Fine sand 1.25 F.M. mortar on brick work in proportion of 1 :2, including supply of all material, labour and T & P etc. required for proper completion of the work SI No. 577
Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and technical specification Clauses 615, 710 and 1204.3.11
Providing & Fixing of KM Stone as specification with proper completion of work .
Providing & Fixing of HM Stone as specification with proper completion of work .
Providing & Fixing of Village Sing bord as specification with proper completion of work .
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost (0%)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost (0.75% Construction Cost)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost (1.5% Construction Cost)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost (2.25% Construction Cost)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost (3% Construction Cost)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.67 MB
BOQ_2090615.xls
BOQ • 0.30 MB
T2.pdf
Tender Documents • 1.20 MB
Download all tender documents and submit your bid