Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-AOC ADD SHIV SHANKARPURAM SHIVPURI DISTT SITAPUR | ₹2.1 Cr | L1 | Accepted-AOC L1 Firm |
| 2 | L2₹2.1 CrRejected-AOC | ₹2.1 Cr | L2 | Rejected-AOC L2 Firm |
| 3 | Rejected-Technical 1338 TAUFEEQ COLONY CIVIL LINES SULTANPUR U P | SULTANPUR | UTTAR PRADESH | - | - | Rejected-Technical Disqualified |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-M/S Shivsunder Construction and Consultants Pvt Ltd., vide Letter dated-06.05.2026 said that he want not pariticipated in this tender. |
Tender Value
₹2.1 Cr
EMD Value
₹4.2 L
Closing Date
6 May 2026, 2:00 pmClosed
General Manager, Zone-7, Lucknow
General Manager, Zone-7, U.P. Projects Corporation Ltd. Lucknow. Gomti Barrage, Left Bank, Gomti Nagar Lucknow.
Construction of RCC Drain form Railway Crossing to Bahuti mod on Machraheta Smapark Marg in Vikas Khand Mishrikh District-Sitapur (U.P.)
2026_UPPRC_1143415_1
27/UPPCL/GM-7/E-TENDER/2026-27 Dated-21.04.2026
Open Tender
Civil Works - Others
Percentage
180 days
District-Sitapur (U.P.)
Please refer Tender documents.
2 documents required · 2 mandatory
₹17,700
₹4.2 L
21 Aug 2026
29 Apr 2026
6 May 2026
29 Apr 2026
6 May 2026
29 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of RCC Drain form Railway Crossing to Bahuti mod on Machraheta Smapark Marg in Vikas Khand Mishrikh District-Sitapur (U.P.) | - | - | - | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All Kind of Soil | 4,080 | Cum. | 187.21 | ₹7,63,816.8 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) (Base Concrete) | 152 | Cum. | 4,899.17 | ₹7,44,673.84 |
| 4 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without | - | - | - | - |
| 5 | impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.:)Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. | - | - | - | - |
| 6 | Concrete of M25 grade with minimum cement content of 330 kg /cum (Footing) | 272 | Cum. | 6,835.79 | ₹18,59,334.88 |
| 7 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without | - | - | - | - |
| 8 | impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.:)Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. | - | - | - | - |
| 9 | Concrete of M25 grade with minimum cement content of 330 kg /cum (Wall) | 336 | Cum | 6,835.79 | ₹22,96,825.44 |
| 10 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without | - | - | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.60 MB
BIDDOC27.pdf
Tender Documents • 21.04 MB
BOQ_2135867.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].