Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 40 SAPTHAGIRI COLONY JAFFERKHANPET CHENNAI 600 083 | CHENNAI | CHENNAI | TAMIL NADU | 600083 | Admitted-Finance |
| 2 | Admitted-Finance FLAT NO 6 D 1 BLOCK DABC ABHINAYAM PHASE 3 SRIRAM NAGAR NOLAMBUR CHENNAI 600 095 | THIRUVALLUR | TAMIL NADU | 600095 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical OLD MARKET 86 B INDHIRA NAGAR METTUR DAM 636401 | SALEM | TAMIL NADU | 636401 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹20,400
Closing Date
4 Aug 2021, 2:00 pmClosed
SE/M1/MTPS-II
Mettur Dam
Dome valve replacement reconditioning works in ESP APH duct hoppers Bottom Ash Hoppers and cleaning of bag filters replacement of damaged fluidizing pad in ESP hopper buffer hopper and clearing the ash chokes inside hoppers Strengthening wornout port
2021_EB_205637_1
57/21-22
Open Tender
Miscellaneous Works
Works
MTPS-II
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹20,400
Yes
12 Aug 2021
15 Jul 2021
5 Aug 2021
15 Jul 2021
4 Aug 2021
15 Jul 2021
Amount
Opening of manhole doors in 5.0m elevation and closing all the manhole doors after inspection and completion of other rectification works including hire charges T&Ps, all consumables and all labour charges etc., (ESP Hoppers)
Strengthening the wornout portion and arresting the punctures in SS area by welding in ESP A,B,C&D pass hoppers including hire charges for T&Ps, SS welding electrodes and all consumables etc., (SS/Strengthening)
Strengthening the wornout portion and arresting the punctures in MS area by welding in ESP A,B,C&D pass hoppers including hire charges for T&Ps, MS welding electrodes and all consumables etc., (MS/Strengthening)
Charges for strengthening the hopper center supporting structure (one hopper centre supporting structures = 05 nos of various length of pipe support) this work involves complete dismantling of supporting structure pipes and positioning and welding the ESP hopper including hire charges for T&Ps, MS welding electrodes and all consumables etc., (Centre supporting structure/Strengthening)
Clearing of ash chock in ESP Hoppers/APH & Duct Hoppers. This work involves dismantling of dome valves, spool piece for clearing the ash and then reassembling of plate valve and dome valve etc., including T&P’s, all consumables and all labour charges etc., (Ash choking)
Removing the 250 NB & 300 NB dome valves from the line, dismantling the valves, Inspection of seal & other parts, reconditioning & replacing of wornout seal & Other parts if necessary, reassembling the valve and fixing with line in Proper manner as per the direction of Engineer-in-charge. (250 NB & 300 NB dome valves)
Removing the 100 NB & 150 NB dome valves from the line, dismantling the valves, Inspection of seal & other parts, reconditioning & replacing of wornout seal & Other parts if necessary, reassembling the valve and fixing with line in Proper manner as per the direction of Engineer-in-charge. (100 NB & 150 NB dome valves)
Dismantling and removing of 400NB Dome valve from Fly ash conveying pipe line silo top side and replacement of wornout internal spares like Dome, top plate, dome seal, bush, bearing, seal plate etc., and assembling of dome valve in the conveying line in Proper manner as per the direction of Engineer-in-charge. (400NB Dome valve)
Opening the manhole of the Bag filter unit in Fly ash Buffer hopper after due isolation, and after sufficient cooling dismantling air purging line, removal of all the Bag filters one by one, bringing the Bag filter outside the housing, cleaning with compressed air, checking of bag filter/cage any damage or in the cage and refitting all the bag filters in position, and closing the man hole as per the direction of Engineer-in-charge. Including hire charges T&P required, consumables and all labour charges etc., (Bag Filters)
Removing the 200NB & 250 NB sleeve coupling from the line, dismantling the coupling, inspection of seal & other parts reconditioning/replacing of worn-out seal & other parts if necessary, reassembling the coupling and fixing with line in proper manner as per the direction of Engineerin-charge (200NB & 250 NB sleeve coupling)
Replacing the damaged fluidizing pad & arresting punctures in ESP buffer hopper fluidizing pad and reassembling with new fluidizing pad (if necessary) in proper manner as per the direction of Engineer-in-charge. (fluidizing pads)
L JAYANTHA VISHNU SIVA
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .