Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.5 LAccepted-Finance 65 SHANKAR SOCIETY GANESH NAGAR C27 SUKHWANI DAPODI PUNE 411012 MAHARASTRA | PUNE | PUNE | MAHARASHTRA | 411012 | L1 | Accepted-Finance Admitted | |
| 2 | L2₹31.3 L+₹1.8 L (6.24%)Accepted-Finance | L2 | Accepted-Finance Admitted |
Tender Value
Refer Docs
EMD Value
₹66,170
Closing Date
5 Nov 2020, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE (E) BSNL Mumbai
O/o CE (E) A Wing Gr Flr Admin Bldg BSNL Mumbai 54
SITC of 4 x 7 TR High Precision Package type AirConditioning Units at MSC Mobile 1st Floor Bhavani Peth Pune Against scrapping PART A Supply n ITC Portion n Part C AMC Portion
2020_BSNL_588175_1
NIT No. 1300/CEEM/2020-21/NIT/40
Open Tender
Electrical Works
Item Rate
1915 days
Mumbai
Please refer Tender documents.
15 documents required · 15 mandatory
₹590
Yes
AO (F and A) BSNL
₹66,170
Yes
4 Jan 2021
8 Oct 2020
6 Nov 2020
8 Oct 2020
5 Nov 2020
8 Oct 2020
90 days
Amount
Part A- Supply & ITC Portion Supply of factory tested 7 TR (sensible cooling capacity) Microprocessor based air-cooled High Precision AC package units complete with upward/downward flow with suitable mesh in the return air path having energy efficient high technology, along with scroll compressor, comprising of indoor & outdoor units with all components including providing suitable floor stand for indoor unit to match false flooring height, as per detailed specification attached and BSNL CO approval etc.complete as required. Note:- In this item Refrigerant copper pipes for hot & liquid lines, condenser cable & M.S Tray not included & shall be paid as per Part-B Items respectively.
Installation, testing and commissioning of above 7 TR air-cooled High Precision AC package units complete with all components, air cooled condenser, including charging of required quantity of refrigerant, laying of data communication cable between units etc. as required on existing framework for item at Sr. No. 1 of Part-A.
Supplying and fixing of copper refrigerant piping of minimum 18 G (1.2 mm) thickness of following sizes with all accessories including cutting, bending, jointing, brazing etc. for hot gas and liquid lines of a single circuit, on existing MS angle tray including insulating the refrigerant lines inside AC area with suitable fire retardant polythene foam complete as per specifications attached. Note:- In case of multiple circuit only single circuit will be measured. a).Hot Gas Line, 7/8"nominal dia.
b).Liquid Line, 5/8"nominal dia.
Supply and fixing of PVC insulated PVC sheathed copper conductor armoured cable with suitable lugs & glands of the following size on the existing MS angle tray (with saddles) along with 2 x 2.24 mm dia. bare copper wire for loop earthing & end termination of cable with glands etc. as required. Note:- In case of multiple circuit only single circuit will be measured. a) 3 x 2.5 sq. mm (for condensers)
Providing plumbing work for humidification circuits and drainage requirements including supply of GI pipes, pipe fittings such as bends, reducers, elbows, tees, unions, flanges etc. for water connection of various components of the system. a) 25 mm ( Medium class ) GI pipe insulated with 6-mm thick superior insulation (for condensate drain)
b) 12 mm GI pipe (Medium Class)
c) 40 mm GI pipe (Medium Class)
Providing MS structure for Outdoor Units/referigerant pipe & cables made out of solid channels/angles/flats etc i/c cutting, welding, grouting, fixing with hardware & painting etc as required.
PART-B: AMC Portion Comprehensive maintenance of the 7TR microprocessor based air-cooled Precision package AC unit (after the warrantee period) including all items covered under Part-A & Part-B as per the specifications/conditions of contract & as per the details given in relevant sections by deploying the required staff including specialised man power and by arranging required spares,refrigerant gas,tools and plant etc.,to keep the AC unit & connected equipments operational upto the required standards complete as required.Note :- 1) Operation of AC unit is not included in this item. 2) Warranty period /Defect liability – a) 12 Months for complete system a)Second Year( First Year covered under defect liability/warranty period.) 4units @ ____ /- per unit/month for 2nd year = Rs. _________________________/-
b) 4units @ ____ /- per unit/month for 3rd year = Rs. _________________________/-
c) 4units @ ____ /- per unit/month for 4th year = Rs. _________________________/-
d) 4units @ ____ /- per unit/month for 5th year = Rs. _________________________/-
Power Control, Nagpur
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .