Tender Value
₹1 L
EMD Value
₹8,000
Closing Date
26 Oct 2022, 3:00 pmClosed
Block Development Officer, Kuthalam
Block Development Office, Kuthalam
Construction of Slab Culvert and Retaining Wall in Aiyanar Koil Road at Kodavilagam Panchayat in Kuthalam Block at Mayiladuthurai District Under 15th CFC (DP) 2022-23
2022_RDTN_257545_1
114/2022/A2 Date 10.10.2022
Open Tender
Civil Works
Item Rate
120 days
Kodavilagam
Construction of Slab Culvert and Retaining Wall in Aiyanar Koil Road at Kodavilagam Panchayat in Kuthalam Block at Mayiladuthurai District Under 15th CFC (DP) 2022-23
9 documents required · 9 mandatory
₹0
₹8,000
Yes
Block Development Office, Kuthalam
27 Oct 2022
20 Oct 2022
26 Oct 2022
20 Oct 2022
26 Oct 2022
20 Oct 2022
20 Oct 2022 - 22 Oct 2022
21 Oct 2022
Amount
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.
Filling with river sand into foundation and basement including cost and conveyance of all materials to work site including all labour charges for filling, watering within 200m lead for good water etc., complete.
Cement concrete 1:4:8 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer
Cement Concrete 1:3:6 mix using 40mm ISSHBG metal from approved quarry, including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering within 200m lead for good water etc., complete.
Cement Concrete 1:2:4 mix using 20mm ISSHBG metal from approved quarry, including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering within 200m lead for good water etc., complete.ment Concrete 1:4:8 mix using 40mm ISSHBG metal from approved quarry, including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering within 200m lead for good water etc., complete.
Reinforced Cement Concrete 1:1.5:3 mix using 20mm ISSHBG metal from approved quarry, including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering within 200m lead for good water etc., complete.ment Concrete 1:4:8 mix using 40mm ISSHBG metal from approved quarry, including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering within 200m lead for good water etc., complete.
Supply and fabrication of steel including cost and conveyance of steels to worksite including labour for cutting, jointing and welding if necessary including all labour charges for dying with binding wire etc., complete.
Supplying and erecting Shuttering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete complying with standard specification.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
R RAJAVELU
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .