| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.4 LAccepted-AOC | L1 | Accepted-AOC Being Lowest | |
| 2 | L2₹26.5 L+₹43,850 (1.68%)Rejected-Finance OFFICE NO 2 GROUND FLOOR CO OP HSG SOCIETY SBS ROAD COLABA MARKET MUMBAI 400 005 | MUMBAI | MAHARASHTRA | 400005 | L2 | Rejected-Finance Being other than Lowest | |
| 3 | L3₹27.8 L+₹1.7 L (6.68%)Rejected-Finance FLAT NO 402 4TH FLOOR BLDG NO 31 HANSGEET CO OP HSG SOCIETY PANT NAGAR GHATKOPAR E MUMBAI 400 075 | MUMBAI SUBURBAN | MAHARASHTRA | 400075 | L3 | Rejected-Finance Being other than Lowest | |
| 4 | L4₹30.3 L+₹4.3 L (16.4%)Rejected-Finance 47 HUSENI LAKDA BAZAAR 242 BELLAIS ROAD MUMBAI 08 | MUMBAI | MUMBAI | MAHARASHTRA | 400008 | L4 | Rejected-Finance Being other than Lowest | |
| 5 | L5₹43.7 L+₹17.6 L (67.5%)Rejected-Finance | L5 | Rejected-Finance Being other than Lowest |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
10 Aug 2021, 6:00 pmClosed
CWE (NW) Mumbai
Commander Works Engineer NW Dr Homi Bhabha Road Navy Nagar Colaba Mumbai 05
REPAIR TO FLOORING TILING PLUMBERING SANITARY FITTING AND JOINERY TO CERTAIN BUILDING AT NEW RS COLABA UNDER AGE B R II NEW NAVY NAGAR UNDER GE (NW) NAVY NAGAR COLABA MUMBAI
2021_MES_457502_1
8235/CWE(NW)MUMBAI/E8
Open Tender
Civil Works
Item Rate
180 days
GE Navy Nagar
Class C
7 documents required · 7 mandatory
₹1,000
Yes
GE Navy Nagar
₹1.1 L
Yes
28 Aug 2021
6 Jul 2021
12 Aug 2021
6 Jul 2021
10 Aug 2021
27 Jul 2021
6 Jul 2021 - 26 Jul 2021
Amount
Demolition of cement concrete (unreinforced) in ground floors and pavings n exc 15 cm thickness (below or above ground level) complete all as specified and directed by Enginner-in-Charge.
Material and labour for roughening surfaces of old concrete floor by picking, sweeping clean and washing down with water to remove dust, etc complete all as specified and as directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Material and labour for brushing neat cement slurry with 3.0kg of cement per sq. metre complete all as specified and directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Material and labour for Non - skid coloured Ceramic tiles 7 to 8 mm thick (square/ rectangular) area of each tile exceeding 0.11 sqm but not exceeding 0.18 sqm, in floors etc. set and jointed in neat cement slurry and pointed in white or coloured cement to match including bedding layer of mortar 20 mm thick in CM 1:4 for laying floor finishes complete all as specified and directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Material and labour for Non - skid coloured Ceramic tiles 7 to 8 mm thick (square/ rectangular) area of each tile exceeding 0.11 sqm but not exceeding 0.18 sqm as in skirting etc set and jointed in neat cement slurry and pointed in white or coloured cement to match with colour of tiles over and incliding 20 mm thick CM (1:4) as in backing coat complete all as specified and directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles and rubbish off the premises etc complete all as specified and directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Material and labour non skid coloured ceramic tiles 300 x 300 x 6 to 7mm in floors set and jonted in cement mortar and pointed in coloured / white cement to match the colour of tiles and including 20 mm thick cement mortar screedbed in CM 1:6 complete all as specified and directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Material and labour for glazed ceramic coloured tiles 300 x 200 x 7mm thick as in dado (vertical surfaces) set and jointed with neat cement slurry and pointed with white cement, including 20 mm thick rendering in CM 1:4 as backing coat complete all as specified and directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Supply and fixing powder coated anodised aluminium frame/track or shutters for windows, ventilators etc. with one or more rebates including joining cleat for fixing etc.fixed or sliding type/louvered window or ventilator without sash bar, aluminium including necessary joining cleats, glazing clips, rubber packing, anodised alumnium snap beading, screws and locking arrangement etc complete all as specified and directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Supply and fixing aluminium alloy wire mesh 0.45 mm nominal dia of wire and average width of aperture 1.4 mm fixed with aluminium wire staples alu shutters complete all as specified and directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Supply and fixing 4 mm thick figured glass pin headed type and glazing with aluminium and neoprene beads in square not exc 0.5 sqm in each pane complete all as specified and directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Supply and fixing 4mm thick plain sheet glass ordinary quality and glazing with oil putty in square n exc 0.5sq. m in each pane complete all as specified and directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Material and labour aluminium anodised powder coated grill with suitable aluminium anodised frame section manufactured by M/S Deco grill pattern DG-104 (10mm dia and aparture 75mm) complete all as specified and directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Supply and fixing factory made solid panel PVC door shutter 30 mm thick (style) consisting of frame made out of M.S. frame shall be covered with heat moulded plain colour PVC 'C' channel having a PVC sheet strip of 2omm width stuck inside with solvent cement for stiles and plain colour PVC sheets for top rail, lock rail & bottom rail on either side & as gap insert for top rail & bottom rail on either side & as gap insert for top rail & bottom rail; panelling of fplain colour PVC sheet to be fitted in the M.S. frame welded/sealed to the stiles. & rails with suitable PVC sheet beading, and joined together with sovent cement, suppling & fixing in the frame at site complete all as specified and directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Supply and fixing solid PVC door frame of size 50mm x 47mm made out of 5mm plain colour PVC sheet reinforced with M.S. Square tube, suppling & fixing in opening complete all as specified and directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Supply and fixing 75 mm size stainless steel butt hinges (ISI Marked) complete all as specified and directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Supply and fixing extruded aluminium alloy handles 150mm size, fabricated type, anodised complete all as specified and directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Supply and fixing Aluminium, anodised, barrel tower bolts 150mm size of extruded section and fixed complete all as specified and directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Taking down chowkats with shutter (without taking shutter from the frame) not exc 1.5 sqm each complete all as specified and directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Supply and fixing for machine cut kota stone slab single piece length as in jambs/cills of windows 18-20mm thick laid and jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing and mirror polishing over & including 15 mm thick screed bed in cm (1:3) complete all as specified and directed by Enginner-in-Charge. Note : kota stone single piece of Cill will be fixed in two steps.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Supply and fixing in repair vitreous china squatting pan 'Orissa pattern' long pan of size 580x 440mm with integral foot rests white with 'P' or 'S' with cement joint,front or back inlet incl connection to trap and to flushing pipe,anti-syphonage pipe and making good the floor to match the existingcomplete all as specified and directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Supply and fixing in repairs vitreous china wash down water closet semi padestal pattern (Anglo-Indian type) white (excluding fixing bolts, flushing cistren and flush pipe) with 'P' or 'S' trap complete all as specified and directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Supply and fixing Plastic water closet seat cover, closed pattern with flat bottom, and cover and mild steel chromium plated or aluminisied hinges devices complete all as specified and directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Supply and fixing in repairs for 10 ltrs capacity PVC Valveless, syphonic action type, flushing cistern, low level, white, with inlet, ball valve, float and handle including brackets flushing cistern and flushing pipe of suitable length, and PVC connection 450mm long complete all as specified and directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Taking down cement plaster of any discription including racking out joints hacking for key scrubbing down with water in patches n.exc. 4 Sqm each complete all as specified and directed.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Material and labour for rendering 10 mm thick in CM 1:6 on other than fair faces of bricks work or concrete finished even and smooth without using extra cement.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Material and labour for 15 mm thick plastering in CM 1:4 mixed with water proofing compound @ 2% by weight of cement on fair faces of brick work or concrete wall surfaces finished even and smooth without using extra cement aall as specified including scaffolding, Safety net etc all complete as directed by Engr-in-Charge. Note :- WPC and welded mesh shall be measured and paid separately.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Supply only integral water proofing compound of approved ISI make.
Material and labour for preparing newly plastered surfaces of walls and applying two coats of Acrylic based exterior paint exterior grade (100% Acrylic) over a coat of primer & bio wash on wall.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Material and labour for preparing surfaces, plastered or unplastered new surfaces, priming plastered and other surfaces with alkali-resistant priming paint and applying two coats of distemper oil emulsion over a coat of wall care putty, white or tinted on walls all as specified
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Material and labour for preparation of newly plastered surfaces of walls and applying three coats of white wash complete all as specified and as directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Demolition of lime concrete of any description and in any position not otherwise specifically provided for complete all as specified and directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Treatment of sunken floor slab comprises of the following specifications and all as specified (i) Material and labour for cleaning of the sunken /lowered portion of the RCC slab surface (including vertical total depth plus skirting height) of floors by wire brush, chiesel out any mortar sticking to the surface and brooming / washing completely. 40 mm avg thk pcc 1:2:4 type B-0 using 12.5 mm graded aggregate as in padding conc to achieve proper slope including 50 mm dia 350 mm long medium grade GI pipe spouts with wire guage on inside mouth to be fixed (ii) Rendering of uneven surfaces with 6 mm thick CM 1:4 mixed with integral WPC @3% of weight of cement consumed. fill it with water and check dampness and seepage. where dampness and seepage noticed nozzles shall be fixed and grouting carried out( WPC shall be msrd & paid separately) (iii) All junctions points of side walls where CI/GI pipes are passing through shall be sealed with epoxy putty
(iv) After drying putty wash the slab and sides of sunken portion with water and make it clean and clear (vi) Plaster the bottom and sides up to bottom of the skirting with minimum 20 mm thk cm 1:4 mixed with integral WPC 3 % of cement consumes as per manufacures specification including rounding of corners and junctions sloping towards spout ( WPC shall be msrd and paid seperately Note:Test the water proofed area (ponding test) by filling water for atleast 72 hours and tested for leakage seepage and to the entire satisfaction of GE . Test shall be done in presence of reps of PMG and record for each sunken slab shall be maintained. the treatment shall be carried out by authorised applicators of chemicals. (vii) All pipes laid in sunken portion shall be covered with 50 mm thk PCC 1:3:6 all around after painting with anticorrossive black japan paint
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Material and labour for filling with PCC 1:5:10 type E2 (1 Cement : 5 coarse sand : 10 graded aggregate 40 mm nominal size) as specified.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Material and labour for CI Floor trap dia of outlet 75mm with CP grating including jointing to waste pipe fixed in cement concrete type B-1 (1:2:4) complete all as specified and directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Supply and fixing Vitreous China Ware Wash hand basin white, flat back, size 550 x 400 mm size (flat back or angle back type) including cutting for and pinning ends of brackets or erecting stand complete all as specified and directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Supply and fixing 32 mm dia., Waste fittings, brass chromium plated for glazed ware sinks, wash basins etc., with long screwed shanks and fly nuts, flange end bedded in red lead cement and other end fixed complete all as specified and directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Supply and fixing pillar tap15mm bore, cast copper alloy fancy type chromium plated, screwed down, high pressure, screwed both ends for iron pipe or for unions and fixed complete all as specified and directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Supply and fixing 32mm dia LDPE PVC waste pipe of pressure rating 6 kgf/cm2 fixed complete to for WHB includding socket & screw complete all as specified and directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Supply and fixing PVC connection 15mm size with PTMT nuts of length 450mm complete all as specified and directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Taking up or down 15mm bore steel tubing and connections, including cleaning for refixing or removal to store complete all as specified and directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Supplying and laying of GI tubing Dia 15mm medium weight incl fittings on walls / ceilings or Laying in floors complete all as specified and directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Re-fixing old steel tubing and connection in new or old position (Wall, ceiling, floors etc) of 15mm bore complete all as specified and directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Supply and fixing in repair Brass chromium plated shower rose 125mm size with or without swivel joints, including fixing to steel pipe or union complete all as specified and directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Supply and fixing in repair for ISI marked 15mm bore, fancy type bib tap of cast copper, screwed down, screwed for iron pipe or for brass ferrule complete all as specified and directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Supply and fixing in reapir for ISI marked 15mm bore stop valves /angle valve, fancy type, cast copper alloy, chromium plated screwed both ends for iron pipe or for unions and fixed complete all as specified and directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Taking down shutter of any description n exc 1 sq. m each complete all as specified and directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Supply and fixing 25 mm thick block board, grade 1 quality, exterior grade, decorative type with decorative face veneer on one face fixed with screws to timber frame work of width n.exc. 25 cm in shelves or built-in cupbords, almirahs and similar work with lipping patti all complet as directed by Enginner-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Supply and fixing hasp and staple safety type,aluminium anodised including bolt to hinge plate and fixed with screws 125mm size
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Material and labour for Preparation of new or previously untreated surfaces of wood or wood based materials of any description not other wise described, over 10cm width or girth and applying one coat of pink primer and two coat of synthetic enamel paint, complete all as specified and as directed by EIC.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
Material and labour granite (of any type) slab 18 to 20mmthick machine cut,bedded and jointed with grey cement slurry and pointed with white cement with admixture of pigment to match the shade of granite stone including grinding polishing over & including 20 mm thick screed bed in cm (1:6) complete for kitchen plateform etc complete all as specified and as directed.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 14th floor
M/s. MAYUR ENTERPRISES
RAMESH ENTERPRISES
Unity Enterprises
DAS Offshore Engg. Pvt. Ltd.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .