Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹78,341.45Admitted-Finance | -20.00% | ₹78,341.45 | L1 | Admitted-Finance |
| 2 | L2₹80,192.26Admitted-Finance | -18.11% | ₹80,192.26 | L2 | Admitted-Finance |
| 3 | L3₹82,748.15Admitted-Finance | -15.50% | ₹82,748.15 | L3 | Admitted-Finance |
| 4 | L4₹88,907.75Admitted-Finance | -9.21% | ₹88,907.75 | L4 | Admitted-Finance |
Tender Value
₹1 L
EMD Value
₹2,000
Closing Date
1 Apr 2026, 6:00 pmClosed
XEN REW RAMBAN
EXECUTIVE ENGINEER OFFICE REW RAMBAN
AS PER NIT
2026_RDPR_306820_2
NIT NO 110 OF REW RAMBAN 2025 26 FRESH OF NIT 108 UNDER HEAD CDF
Open Tender
Civil Works
30 days
RAMBAN
AS PER NIT
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹2,000
3 Apr 2026
27 Mar 2026
2 Apr 2026
27 Mar 2026
1 Apr 2026
27 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Earh work in excavation by manual means over areas ( exceeding 30 cm and up to 1.5 mtr in width and 1.5 mtr in depth as well as 10 sqm on plan ) incl. disposal of excavated earth up to 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in AKS | - | cum | - | - | |
Dry random rubble masonry with hard stone in foundations and plinth without bond stone nullah. | 1 | cum | - | - | |
Providing and laying in position cement concrete 1:3:6 mix in foundation and plinth using aggregates 20mm size. | - | cum | - | - | |
Boulders | - | cum | - | - | |
Centring and shuttering including strutting, propping etc and removal of the formwork . | - | cum | - | - | |
Providing and laying in position cement concrete 1:5:10 mix in foundation and plinth using aggregates 20mm size. | - | cum | - | - | |
Carriage of Cement from source to site by mechanical transport or animal transport or by head load | 1 | MT | - | - | |
Carriage of Sand from source to site by mechanical transport or animal transport or by head load | - | cum | - | - | |
Carriage of Stone Aggregates from source to site by mechanical transport or animal transport or by head load | 1 | cum | - | - | |
Carriage of stones from source to site by mechanical transport or animal transport or by head load | 1 | cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.75 MB
BOQ_995976.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid