Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.9 LAdmitted-Finance | -0.50% | ₹4.9 L | L1 | Admitted-Finance |
| 2 | L2₹4.9 L+₹1,471.20 (0.30%)Admitted-Finance NA | -0.20% | ₹4.9 L+₹1,471.20 (0.30%) | L2 | Admitted-Finance |
| 3 | L3₹4.9 L+₹2,452 (0.50%)Admitted-Finance | +0.00% | ₹4.9 L+₹2,452 (0.50%) | L3 | Admitted-Finance |
Tender Value
₹4.9 L
EMD Value
₹49,100
Closing Date
16 Jul 2026, 2:00 pmClosed
Executive Officer
Nagar Palika Parishad Modinagar
WARD NO. 15 ME KANHA GAUSHALA KI DEEWAR KI MARAMMAT VA PUTAI KA KARYA.
2026_DOLBU_1167998_18
670/NPPModinagar/ETender/2026
Open Tender
Civil Works
Percentage
60 days
Modinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Executive Officer
₹49,100
25 Aug 2026
10 Jul 2026
16 Jul 2026
10 Jul 2026
16 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil including lift upto 1.5m | 31.12 | Cum | 110 | ₹3,423.2 |
| 2 | C.Concrete work in 1:6:12 Cement, c/ sand, and 40 mm brick ballast including supply of all materials, labour , T & P etc. As per S.I.No 273 | 4.44 | Cum | 4,000 | ₹17,760 |
| 3 | M-150 Class B/W in 1:4 cement, coarse sand 1.25 F.M motar in foundation and plinth including supply of all materials, labour , T & P etc. As per P.W.D. S.I. No. 305(a) | 20.87 | Cum | 6,713.4 | ₹1,40,108.66 |
| 4 | M-150 Class B/W in 1:4 cement, coarse sand 1.25 F.M motar in superstructure above plinth to V level including supply of all materials, labour , T & P etc. As per P.W.D. S.I. No. 305(a) | 12.08 | Cum | 6,713.4 | ₹81,097.87 |
| 5 | R.C.C Work 1:1.5:3 in cement,c.sand and 20 mm stone grit in door sills, chaukhat, boundry post etc as per si no 282(a) for Road xing | 7.88 | Cum | 7,528.5 | ₹59,324.58 |
| 6 | M.s or tor steel in plain such as RCC work i/c its cutting, bending & binding complete As Per DSR 5.22 | 7.73 | Qtl | 7,099 | ₹54,875.27 |
| 7 | 12 mm thick plaster in 1:4 cement and coarse sand mortar on brick work minimum thickness not to be less than 1 cm. including supply of all materials, labour,T & P etc. As per SI No 584(a) | 203.12 | Sqm | 188.5 | ₹38,288.12 |
| 8 | Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete | 515.12 | Sqm | 90 | ₹46,360.8 |
| 9 | Finishing walls with Acrylic Smooth exterior paint of required shade New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) | 515.12 | Sqm | 95 | ₹48,936.4 |
| 10 | recovery of old brick | 12,125.6 | Nos | 6 | ₹72,753.6 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.37 MB
BOQ_2191133.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .