Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.5 LAccepted-AOC TULSI ASTHA FLAT NO 1 PLOT NO 54 SECTOR 12 VASHI NAVI MUMBAI THANE 400 703 | THANE | MAHARASHTRA | 400703 | L1 | Accepted-AOC AOC | |
| 2 | L2₹33.0 L+₹2.2 L (7.12%)Rejected-Finance SHOP NO 4 SUN STAR CHS LTD PLOT NO 309 SECTOR 21 NERUL EAST NAVI MUMBAI 400 706 | THANE | MAHARASHTRA | 400706 | L2 | Rejected-Finance Not L1 | |
| 3 | L3₹33.6 L+₹2.8 L (9.07%)Rejected-Finance ATLANTIS A2 1501 PLOT NO 05 SECTOR 11 NEAR CLOUD 36 GHANSOLI NAVI MUMBAI 400 701 E 97 CWE SUBS BHANDUP | THANE | MAHARASHTRA | 400701 | L3 | Rejected-Finance Not L1 | |
| 4 | L4₹33.9 L+₹3.0 L (9.86%)Rejected-Finance | L4 | Rejected-Finance Not L1 | |
| 5 | L5₹34.3 L+₹3.5 L (11.4%)Rejected-Finance 64 A JASRAJ MANSION 1ST FLOOR OLD HANUMAN LANE KALBADEVI ROAD MUMBAI 400 002 | MUMBAI | MAHARASHTRA | 400002 | L5 | Rejected-Finance Not L1 |
| Sl No | Description | Qty | Unit | M/s Shree Construction Co L7 | PRIME ENGINEERS L3 | RAJU ENTERPRISES L4 | Parmatma Enterprises L2 | sahajanand const co. L1 | HINDUSTAN BUILDERS L6 | AISHWARYA ENTERPRISES L8 | M/s Mukesh Engineers L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Petty work as in repairs for plumbing/internal water supply works such as repair to leaking bib taps, pillar taps, CP mixers, stop cocks, waste pipe for WHB, Urinal and sink by tightening and providing spindle, washer repairs to float valves, low levelled cistern, PVC connection, hot or cold pipe line, flushing cistern, coupling to waste pipe to the satisfaction of user as assigned by the engineer in charge
Note for item No 1: (a) Rep of contractor will collect detilas of complaint from department. The contractor will be allotted complaint on daily basis and sufficent resources will be deployed by him/ her for completion of day to day complaint within 24 hrs from the time of reporting. Any delay beyond above mentioned time limit suitable penalites as mentioned in relevant clause of contract.
(b) A detailed log of complaints with completion/ non-completion remarks from users/ MES will be maintained by the contractor and same will be updated on daily basis in consultation with Engr-in-charge or JE detailed by him.
(c) The contractor will make suitable arrangement for emergent complaints and will notify auth rep/ Engr-in-charge about extraordinary cicumstances for probable non-completion or delay in rectification of complaints beyond state time limit set for disposal of complaint. In case of any dispute the decision of accepting officer will be final and binding in this regard.
(d) The quoted rated deems to be inclusive of transportation and other expenses required for the reqource deployment at the complaint site around scattered Naval Depot.
(e) The contractor will maintain suitable inventories and range of spares required to meet the complaints as same will be reviewed periodically by Engr-in-charge to streamline complaints disposal system.
(f) Requisite skilled manpower more than two will be provided by the contractor based on site requirements in one day. No extra payment will be provided on this account. | 650 | Each | 400 ₹2,60,000 | 191 ₹1,24,150 | 200 ₹1,30,000 | 110 ₹71,500 Lowest | 200 ₹1,30,000 | 900 ₹5,85,000 | 325 ₹2,11,250 | 200 ₹1,30,000 |
| 2.00 | Petty works as in repairs for wooden joinery/PVC doors/aluminium windows, WPC doors works such as Resecuring or easing and adjusting of doors, windows kitchen cabinets in any size, refixing hinges etc by providing glue nails and screws to the satisfaction of user and rectifying other misc minor carpentary works assigned by the Engineer In charge. (Note : Replacement of builders hardware if required shall be measured and paid separately under relevant item)
Note for item No 1, 2 and 3 : (a) Rep of contractor will collect details of complint from departmant. The contractor will be alloted complaint on daily basis and sufficient resources will be deployed by him/her for completion of day to day comaplaint within 24 Hrs from the time of reporting. Any delay beyond above mentioned time limit suitable penalties as mentioned in relavant clause of Contract.
(b) A detailed log of complaints with completion/ non-completion remarks from users/MES will be maintained by the contractor and same will be updated on daily basis in consulatation with Engr-in-Charge or JE detailed by him.
(c) The contractor will make suitable arrangment for emergent complaints and will notify auth rep/Engr-in-Charge about extraordinary circumstances for probable non-completion or delay in rectification of complaints beyond state time limit set for disposal of complaint. In case of any dispute the decision of accepting officer will be final and binding in this regard.
(d) The quoted rated deems to be inclusive of transportation and other expenses required for the resource deployment at the complaint site around scattered Naval Depo.
(e) The contractor will maintain suitable inventories and range of spares required to meet the complaints as same will be reviewed peridically by Engr-in-charge to streamline complaints disposal system.
(f) Requisite skilled manpower more than two will be provided by the contractor based on site requirements in one day. No extra payment will be provided on this account. | 450 | Each | 550 ₹2,47,500 | 191 ₹85,950 | 200 ₹90,000 | 110 ₹49,500 Lowest | 200 ₹90,000 | 900 ₹4,05,000 | 292 ₹1,31,400 | 200 ₹90,000 |
| 3.00 | Taking down cement plaster of any description from brick or stone walls including raking out joints, hacking for key , scrubbing down with water etc and removing debris outside MD land upto requisite lead complete all as specified and M&L for rendering 15mm thick in two coats (10+5mm) polymer modified ready mix cement based plaster on the wall surfaces including finishing the surface of top layer even and smooth complete all as specified and directed make: easyplast from wall plast/readiplast from ultratech including material and labour for preparation of new plastered surfaces on walls, preparation for Acrylic emulsion and applying applying two coats of 100% premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resisitance as per IS 15489:2004, alkali & fungal rsistance, dirt resistance exterior paint of required shades(Company Depot Tinted) with silicon additives @ 1.43 litre/10sqm over & including priming coat of extreior primer applied @ 0.90 litre/10 sqm over new surfaces complete all as specified
Note : Necessary scaffolding/formwork/shuttering are deemed to be included in the quoted rate. | 50 | Sqm | 450 ₹22,500 | 291 ₹14,550 | 520 ₹26,000 | 350 ₹17,500 | 250 ₹12,500 | 300 ₹15,000 | 325 ₹16,250 | 200 ₹10,000 Lowest |
| 4.00 | Taking down cement plaster of any description from brick or stone walls including raking out joints, hacking for key , scrubbing down with water etc and removing debris outside MD land upto requisite lead complete all as specified and M&L for rendering 10mm thick polymer modified ready mix cement based plaster on the wall surfaces including finishing the surface of top layer even and smooth complete all as specified and directed make: easyplast from wall plast/readiplast from ultratech including material and labour for preparation of new plastered surfaces on walls, preparation for distempering and applying two coat of oilbound distemper over a coat of primer including stopping of nails holes,cracks etc and 1 mm thick (minimum) white cement based wall care putty on old surfaces of walls etc, finished even and smooth, complete all as specified and directed.
Note : Necessary scaffolding/formwork/shuttering are deemed to be included in the quoted rate. | 60 | Sqm | 400 ₹24,000 | 291 ₹17,460 | 500 ₹30,000 | 400 ₹24,000 | 200 ₹12,000 Lowest | 250 ₹15,000 | 375 ₹22,500 | 200 ₹12,000 Lowest |
| 5.00 | Taking down cement plaster of any description from brick or stone walls including raking out joints, hacking for key , scrubbing down with water etc and removing debris outside MD land upto requisite lead complete all as specified and M&L for rendering 5mm thick polymer modified ready mix cement based plaster on the wall surfaces including finishing the surface of top layer even and smooth complete all as specified and directed make: easyplast from wall plast/readiplast from ultratech including material and labour for preparation of new plastered surfaces and applying three coats of white wash complete all as specified and directed.
Note : Necessary scaffolding/formwork/shuttering are deemed to be included in the quoted rate. | 40 | Sqm | 350 ₹14,000 | 291 ₹11,640 | 480 ₹19,200 | 450 ₹18,000 | 200 ₹8,000 | 200 ₹8,000 | 300 ₹12,000 | 160 ₹6,400 Lowest |
| 6.00 | M&L for Complete removal of existing treatment and preparation of plastered surfaces on walls, preparation for Acrylic emulsion and applying two coats of 100% premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resisitance as per IS 15489:2004, alkali & fungal rsistance, dirt resistance exterior paint of required shades(Company Depot Tinted) with silicon additives @ 1.43 litre/10sqm over & including priming coat of extreior primer applied @ 0.90 litre/10 sqm over new surfaces | 2,600 | Sqm | 100 ₹2,60,000 | 61 ₹1,58,600 Lowest | 80 ₹2,08,000 | 90 ₹2,34,000 | 70 ₹1,82,000 | 75 ₹1,95,000 | 98 ₹2,54,800 | 110 ₹2,86,000 |
| 7.00 | M&L for preparation of old plastered surfaces on walls, preparation for Acrylic emulsion and applying one coat of 100% premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resisitance as per IS 15489:2004, alkali & fungal rsistance, dirt resistance exterior paint of required shades(Company Depot Tinted) with silicon additives @ 1.43 litre/10sqm over & including priming coat of extreior primer applied @ 0.90 litre/10 sqm over new surfaces | 2,900 | Sqm | 60 ₹1,74,000 | 61 ₹1,76,900 | 55 ₹1,59,500 | 50 ₹1,45,000 Lowest | 50 ₹1,45,000 Lowest | 75 ₹2,17,500 | 68 ₹1,97,200 | 85 ₹2,46,500 |
| 8.00 | M&L for complete removal of existing treatment by washing, rubbing down and stopping of old decorated surfaces on walls, preparation for wall surface and applying 3mm thick wall care putty on wall and making the wall surface plain by rubbing surface with sand paper to obtain plain surface and applying one coat of alkali resistant priming paint followed by two coat of oilbound distemper complete all as specified and directed by EIC. | 3,900 | Sqm | 70 ₹2,73,000 | 61 ₹2,37,900 | 55 ₹2,14,500 | 70 ₹2,73,000 | 50 ₹1,95,000 Lowest | 60 ₹2,34,000 | 75 ₹2,92,500 | 100 ₹3,90,000 |
| 9.00 | M & L for preparation of old distempering surfaces including stopping of nails holes,cracks etc. and applying one coat of oil bound distemper on wall complete all as specified. | 1,500 | Sqm | 40 ₹60,000 | 61 ₹91,500 | 38 ₹57,000 | 40 ₹60,000 | 30 ₹45,000 Lowest | 50 ₹75,000 | 38 ₹57,000 | 65 ₹97,500 |
| 10.00 | M&L for complete removal of existing treatment by washing, rubbing down and stopping of old decorated surfaces on ceiling, preparation for ceiling and applying 3mm thick wall care putty on ceiling and making the surface plain by rubbing surface with sand paper to obtain plain surface and applying three coats of white wash complete all as specified and directed by EIC. | 350 | Sqm | 45 ₹15,750 Lowest | 61 ₹21,350 | 50 ₹17,500 | 80 ₹28,000 | 60 ₹21,000 | 100 ₹35,000 | 75 ₹26,250 | 60 ₹21,000 |
Tender Value
Refer Docs
EMD Value
₹94,000
Closing Date
29 May 2026, 6:00 pmClosed
GE (NW) Mankhurd
GE (NW) Mankhurd
WELCOME MAINT TO RESIDENTIAL BLDGS INCLUDING MISC CIVIL WORKS AND OTHER MAINT WORKS AT TS MAHUL NSD SEWRI UNDER GE (NW) MANKHURD.
2026_MES_764269_1
8547/E8
Open Tender
Civil Works
Item Rate
270 days
GE (NW) Mankhurd
As per tender document
8 documents required · 8 mandatory
₹500
GE (NW) Mankhurd
₹94,000
Yes
23 Jul 2026
8 May 2026
1 Jun 2026
8 May 2026
29 May 2026
22 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Petty work as in repairs for plumbing/internal water supply works such as repair to leaking bib taps, pillar taps, CP mixers, stop cocks, waste pipe for WHB, Urinal and sink by tightening and providing spindle, washer repairs to float valves, low levelled cistern, PVC connection, hot or cold pipe line, flushing cistern, coupling to waste pipe to the satisfaction of user as assigned by the engineer in charge | 650 | Each | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
8547TENDERPAGES.pdf
Tender Documents • 0.72 MB
BOQ_856028.xls
BOQ • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .