Tender Value
₹16 L
EMD Value
₹32,000
Closing Date
19 Jun 2025, 11:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Director
IWAI, Pandu Port Complex, Pandu, Guwahati-12
Annual Afloat repair of HSD Jiabhorali at Guwahati (NW-2) for the year 2025-26
2025_IWAI_863376_1
IWAI/GHY/JIABHORALI/4(88)/25
Open Tender
Marine Works
Works
45 days
Guwahati (NW-2)
As per tender document
2 documents required · 2 mandatory
₹5,900
Yes
IWAI FUND PLAN
₹32,000
Yes
21 Jun 2025
5 Jun 2025
20 Jun 2025
6 Jun 2025
19 Jun 2025
6 Jun 2025
Amount
(i) Wheel house forward HRP unit indicator found non functional. (ii) Complete servicing of 3 nos. HRP unit (Type 210-50 DU, 96 KW, 1800 rpm) with foundation nut-bolt, stern tube, vibration and sound check. (iii) Entire line from HRP unit to wheel house be check. (iv) Related gauge, sensor, indicator and meter to be inspect and repaired/renewed in wheel house and HRP unit, as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
(i) Port side's HRP engine(Make:Daewoo, HP:130); fuel pump and governor found non functional.(ii)Down/top overhauling/B-C-D check as per running hour on attending time of both HRP's engine.(iii)Related gauge, sensor, indicator and meter to be inspect and repaired/renewed with complete line check, in wheel house and engine(iv)Cooling system and safety system to be check, as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
Main deck plating observed rusting, hole and plate found thin down; same and other plate like side fender and railing has to be renewed by cropping and welding etc as required as per direction of IWT Surveyor/ EIC.
Cleaning and painting of all bilges with one coat primer and 2 coats of marine quality paints as required as per direction of EIC/Surveyor.
(i) Wheel house battery charger panel found nonfunctional (ii) Main switch board diesel generator voltmeter found non functional (iii) PA system to be installed. (iv) Communication system between engine room and wheel house to be set (v) Engine room/wheel house all electrical line panel AC/DC, Distribution boxes, Navigational light, Navigation light distribution board (light indication), general light, blowers and electric horn to be checked, serviced / repaired; all have to be rectified/renewed as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
Watertight integrity of WT hatches, manholes and ventilation flaps mesh, engine room scuttles, doors found defective. The same to be replace with all Watertight & Gastight fittings along with hose testing/ chalk test as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material(Actual +10%)
(i) Main deck anchor windlass control(S) found non functional, the same has to be rectified. (ii) Both anchor windlass to be serviced with renewal of accessories like wire rope etc. as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
(i) Diesel generator (P&S) observed leakage of oil from various joints and hose connection to be repair/service (ii) Both Generator's (Make:Mico,50 KVA); Down/top overhauling/B-C-D check as per running hour on attending time (iii) Related gauge, sensor, indicator and meter to be inspect and repaired/renewed with complete line check, in wheel house and engine (iv) Cooling system and safety system to be check, as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
(i)Main deck fire box glass (04 nos.) found broken the same has to be rectified/renewed. (ii) Ply works to be check (iii) sun mica works to be check (iv)All kind of carpentry works to be inspect and same has to be repaired as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
Sewage pump and fresh water pump to be rectified/renewed as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
All tanks; 2 no. fuel reserve tank (Capacity : Approx. 23,668 Litre each), 1 no. fresh water tank (Capacity : Approx. 10,090 Litre each), 1 no. sewage tank, 2 no. fuel service tank (Capacity : Approx. 1774 Ltr. each), 2 no. store tank and 3 no. HRP engine's fuel service tank (Capacity : Approx. 570 Litre each) etc. to be cleaned properly as required as per direction of EIC/Surveyor.
Dredge Pump (P&S) observed leakage of water from impeller shaft connection (Aft side) and coupling found rusted the same has to be rectified in all respect (ii) Dredge pump to be dismantled along with impeller, inspection cover, related pipeline, thrust bearing block; inspect and to be serviced. Checking of seal and bearing, if damaged then replaced with new one, as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
Installation of 300 W solar power unit with solar panel, batteries and other applicable accessories with output to vessel's apparatus as required as per direction of EIC.
Labour Charges
Cost of spares/material (Actual +10%)
(i) Port side attach bathroom's tiles damaged, the same has to be restored (ii) The galley's basin/sink, strainer and other fitting to be checked then repaired/renewed. Two no. attach bathroom's all accessories i.e showers, commode & cover, flush tank, door & locks, valves, mirror, jet, exhaust fan, soap stand, overhead tank with cover, towel rod, tiles, cloth hanger etc and fitments to be checked and rectified/renewed as required. Ensure leakage proof and free flow of water from over head tank as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
Installation of truck tyre fender with wire rope and bull dog clamp as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
Installation of echosounder and transducer with all accessories as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
Installation of painted 15 feet salwoood ladder with steps for embarkment etc. as required as per direction of EIC/Surveyor.
Installation of curtain-magnet type mosquito nets in all windows(1), porthole(6) and doors(3) with all type of gluing and adhesive works; as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
Provision and supply of Grapnel anchor (weight 35 Kg) with 50 Mtrs 20 MM rope as required as per direction of surveyor/ EIC
Floor mat in wheel house the same was renewed. Any other floor mat, flooring, tiles damage found the same has to be repaired as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
Das Consultancy And Agency Services (BID ID -3234853)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .