Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.6 LAdmitted-Fee/PreQual/Technical/Finance | -20.95% | ₹2.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.7 L+₹14,323.51 (5.50%)Admitted-Fee/PreQual/Technical/Finance | -16.60% | ₹2.7 L+₹14,323.51 (5.50%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.3 L
EMD Value
₹6,580
Closing Date
4 Jul 2026, 4:00 pmClosed
Ex. Engineer SND Div IIND
Darish Kadal
Construction of Laterial Storm water drain at Usman Abad Lane No. 3 near Masjid Usman at Maloora
2026_HAUDD_313084_6
E-NIT NO 04 SNDII OF 2026-27
Open Tender
Civil Works
Percentage
15 days
Maloora
Please refer Tender documents.
6 documents required · 6 mandatory
₹100
Ex Engineer SND Division IIND
₹6,580
6 Jul 2026
20 Jun 2026
6 Jul 2026
20 Jun 2026
4 Jul 2026
20 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/by mechanically means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix). | 0.06 | Cum | 1,725.2 | ₹103.51 |
| 2 | Earth work in Bulk excavation by manually means over areas (not exceeding 1.5 m in width) including disposal of excavated earth lead upto 1 meters and lift upto 1.5 m,as directed by Engieer-in-charge | 12.96 | Cum | 592.9 | ₹7,683.98 |
| 2.01 | Earth work in Bulk excavation by mechanically means over areas (not exceeding 1.5 m in width) including disposal of excavated earth lead upto 1 meters and lift upto 1.5 m,as directed by Engieer-in-charge | 30.24 | Cum | 187.3 | ₹5,663.95 |
| 3 | Providing & laying stone soling duly hand packed on horizontal floor on horizontal floor including hand ramming watering and levelling to the surfave. | 6.12 | Cum | 937.4 | ₹5,736.89 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 4.8 | Cum | 5,202.9 | ₹24,973.92 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 11.4 | Cum | 6,591.25 | ₹75,140.25 |
| 6 | Providing and laying in position reinforced cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 9.81 | Cum | 7,104.35 | ₹69,693.67 |
| 7 | Thermo-mechanically Treated bars of grade Fe-500D or more as Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinh level | 583.73 | Kg | 123.2 | ₹71,915.54 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for: A. Manwhole Walls Internal | 36 | Sqm | 286.35 | ₹10,308.6 |
| 8.01 | B. Suspend floors, roofs, landings, balconics and access platforms. | 24 | Sqm | 718.2 | ₹17,236.8 |
stage.html
html • 0.02 MB
finance_1013196.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_1013196.xls
BOQ • 0.27 MB
Corrigendum1.pdf
PDF • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .