Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.0 LAccepted-AOC R G BARUAH ROAD NEAR SHIV MANDIR GUWAHATI AIRPORT GUWAHATI 781015 | KAMRUP METRO | ASSAM | 781015 | ₹20.0 L Quoted ₹20.2 L | L1 | Accepted-AOC L1 BIDDER |
| 2 | L2₹25.9 L+₹5.7 L (28.2%)Rejected-Finance HOUSE NO 29 A SIJUBARI NIZARA PATH PO PS HATTIGAON GUWAHATI 38 | KAMRUP METRO | ASSAM | 781038 | ₹25.9 L+₹5.7 L (28.2%) | L2 | Rejected-Finance other than L1 bidder |
| 3 | Rejected-Technical GARH ROAD MEERUT UTTAR PRADESH 250002 INDIA | MEERUT | UTTAR PRADESH | 250002 | - | - | Rejected-Technical Firm is not enlisted in appropriate category |
| Sl No | Description | Qty | Unit | M/s Vishnu Enterprises L1 | M/S SEWAK SINGH L2 |
|---|---|---|---|---|---|
| 1.00 | M&L for servicing of the FRP cooling tower by taking down the choked FRP Fills, segments, rusted structural supports, bolts and nuts and replacement of FRP fills, repair to FRP segments, cold water sumps by applying the resin lining as per the standards by applying polyster resin, renewal of whole PVC FRP fills, rusted bolts and nuts, blocked nozzels, cleaning the cooling tower fan assembly. repairing of the grills of the cooling tower and also repair any kind of leakages from the cooling tower, replacement of bearings, complete painting of iron structure of cooling tower with resin matching colour, testing & commissioning the cooling tower of the central AC plant of capacity 60TR complete all as specified and directed. | 1 | EACH JOB | 3,000 ₹3,000 Lowest | 25,000 ₹25,000 |
| 2.00 | Taking down old UNSV Thermal electrical sensor from chiller/ condensor unit and replacment of thermoelectrical sensor of existing model , include testing and comissioning complete all as specified and directed. | 4 | EACH | 3,500 ₹14,000 Lowest | 25,000 ₹1,00,000 |
| 3.00 | S & F in repair cooling tower fan blade assembly FRP type of 60 TR capacity cooling tower as same as exiting complete all as specified and as directed. | 1 | EACH | 3,500 ₹3,500 Lowest | 4,500 ₹4,500 |
| 4.00 | S&F in repair Sprinkler with PVC arm with aluminium center movable distributor and fixing in cooling tower of 60 TR capacity complete all as existing, complete all as specified and directed. | 1 | EACH | 2,500 ₹2,500 Lowest | 5,000 ₹5,000 |
| 5.00 | Supply & fix in repairs flanged mounted electric motor confirming to IS:2223 for cooling tower of capacity 1.5HP complete all as specified and as directed.
NOTE : (a) Contractor shall provide the original purchase vouchers and test certificates.
(b) Electric motor shall be fixed in its new position and unit rate of this item includes disconnecting the fittings and fixing the same with new motor. | 1 | EACH | 9,800 ₹9,800 Lowest | 32,000 ₹32,000 |
| 6.00 | M&L for cleaning water sump of size 3 mtr x 3 mtr and 2.0 mtr deep, complete removing the all mud and tree leaves, drain out water by dewatering pump, cleaning all the algae formation indise the tank, removing all scalling and other formed prtiles inside walls by scrubbing, also including cleaning all vegetation growth all around the tank complete all as specified and directed. | 1 | EACH JOB | 3,500 ₹3,500 Lowest | 5,000 ₹5,000 |
| 7.00 | M&L for stiching of canvass canopy between AHU to duct by using additional canvass and two layer of stiching including fixing of zip complete all as specified and as directed. | 3 | SQM | 1,400 ₹4,200 Lowest | 6,500 ₹19,500 |
| 8.00 | M&L for complete flushing out the refrigerating system (chiller unit) of capacity 52 TR consist of condenser, Evaporator, cooling coil, refrigeration suction & discharge liquid line and testng with Nitrogen gas, removal of complete dirt, oil and carbon and cleaning of the whole system at ABOD AC Plant include replacement of drier gas filters complete all as specified and as directed.
Note:- Cleaning of 01 No of Refrigerator unit (chiller unit) shall be measured and paid as Each job. | 3 | EACH JOB | 12,000 ₹36,000 | 8,000 ₹24,000 Lowest |
| 9.00 | M&L for complete flushing out the refrigerating system (chiller unit) of capacity 25 TR consist of condenser, Evaporator, cooling coil, refrigeration suction & discharge liquid line and testng with Nitrogen gas, removal of complete dirt, oil and carbon and cleaning of the whole system at FAD AC Plant include replacement of drier gas filters complete all as specified and as directed.
Note:- Cleaning of 01 No of Refrigerator unit (chiller unit) shall be measured and paid as Each job. | 3 | EACH JOB | 12,000 ₹36,000 | 8,000 ₹24,000 Lowest |
| 10.00 | M&L for carryout the descaling of shell and tube condenser by circulating the dilutted RAC-III Organic compound at the appropriate ratio according to the scale deposite in side the copper tubes of the condenser, circulate the chemicals till removed the scale deposite, and opening the both and covers, and manually brushes the tubes by using nylon brushes, cleaning the end covers, degreasing the complete copper tubes end covers by circulating the caustic soda solution, and flushing through after boxing up the both end covers, the work including isolation the each condensers by dummy the inlet and outlet water pipes, renew all the end covers/inlet and outlet flanges rubber gaskets, rusted bolts nuts etc for chilled water type 52.0 TR capacity at ABOD AC Plant complete all as specified and as directed.
Note:- Cleaning of 01 No of Condeser unit shall be measured and paid as Each job. | 3 | EACH JOB | 11,200 ₹33,600 | 8,500 ₹25,500 Lowest |
Tender Value
₹26 L
EMD Value
₹52,000
Closing Date
20 Jun 2026, 6:00 pmClosed
CWE SHILLONG
HQ CWE SHILLONG , SE FALLS SHILLONG-793011
COMPREHENSIVE REPAIR/MAINT OF CENTRAL AC PLANT AND DEHUMIDIFIERS UNDER GE NARANGI
2026_MES_768671_1
8004/NAR/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
GE NARANGI
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GE NARANGI
₹52,000
Yes
11 Sept 2026
30 May 2026
22 Jun 2026
30 May 2026
20 Jun 2026
13 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M&L for servicing of the FRP cooling tower by taking down the choked FRP Fills, segments, rusted structural supports, bolts and nuts and replacement of FRP fills, repair to FRP segments, cold water sumps by applying the resin lining as per the standards by applying polyster resin, renewal of whole PVC FRP fills, rusted bolts and nuts, blocked nozzels, cleaning the cooling tower fan assembly. repairing of the grills of the cooling tower and also repair any kind of leakages from the cooling tower, replacement of bearings, complete painting of iron structure of cooling tower with resin matching colour, testing & commissioning the cooling tower of the central AC plant of capacity 60TR complete all as specified and directed. | 1 | EACH JOB | - | - |
| 2 | Taking down old UNSV Thermal electrical sensor from chiller/ condensor unit and replacment of thermoelectrical sensor of existing model , include testing and comissioning complete all as specified and directed. | 4 | EACH | - | - |
| 3 | S & F in repair cooling tower fan blade assembly FRP type of 60 TR capacity cooling tower as same as exiting complete all as specified and as directed. | 1 | EACH | - | - |
| 4 | S&F in repair Sprinkler with PVC arm with aluminium center movable distributor and fixing in cooling tower of 60 TR capacity complete all as existing, complete all as specified and directed. | 1 | EACH | - | - |
| 5 | Supply & fix in repairs flanged mounted electric motor confirming to IS:2223 for cooling tower of capacity 1.5HP complete all as specified and as directed.
NOTE : (a) Contractor shall provide the original purchase vouchers and test certificates.
(b) Electric motor shall be fixed in its new position and unit rate of this item includes disconnecting the fittings and fixing the same with new motor. | 1 | EACH | - | - |
| 6 | M&L for cleaning water sump of size 3 mtr x 3 mtr and 2.0 mtr deep, complete removing the all mud and tree leaves, drain out water by dewatering pump, cleaning all the algae formation indise the tank, removing all scalling and other formed prtiles inside walls by scrubbing, also including cleaning all vegetation growth all around the tank complete all as specified and directed. | 1 | EACH JOB | - | - |
| 7 | M&L for stiching of canvass canopy between AHU to duct by using additional canvass and two layer of stiching including fixing of zip complete all as specified and as directed. | 3 | SQM | - | - |
| 8 | M&L for complete flushing out the refrigerating system (chiller unit) of capacity 52 TR consist of condenser, Evaporator, cooling coil, refrigeration suction & discharge liquid line and testng with Nitrogen gas, removal of complete dirt, oil and carbon and cleaning of the whole system at ABOD AC Plant include replacement of drier gas filters complete all as specified and as directed.
Note:- Cleaning of 01 No of Refrigerator unit (chiller unit) shall be measured and paid as Each job. | 3 | EACH JOB | - | - |
| 9 | M&L for complete flushing out the refrigerating system (chiller unit) of capacity 25 TR consist of condenser, Evaporator, cooling coil, refrigeration suction & discharge liquid line and testng with Nitrogen gas, removal of complete dirt, oil and carbon and cleaning of the whole system at FAD AC Plant include replacement of drier gas filters complete all as specified and as directed.
Note:- Cleaning of 01 No of Refrigerator unit (chiller unit) shall be measured and paid as Each job. | 3 | EACH JOB | - | - |
| 10 | M&L for carryout the descaling of shell and tube condenser by circulating the dilutted RAC-III Organic compound at the appropriate ratio according to the scale deposite in side the copper tubes of the condenser, circulate the chemicals till removed the scale deposite, and opening the both and covers, and manually brushes the tubes by using nylon brushes, cleaning the end covers, degreasing the complete copper tubes end covers by circulating the caustic soda solution, and flushing through after boxing up the both end covers, the work including isolation the each condensers by dummy the inlet and outlet water pipes, renew all the end covers/inlet and outlet flanges rubber gaskets, rusted bolts nuts etc for chilled water type 52.0 TR capacity at ABOD AC Plant complete all as specified and as directed.
Note:- Cleaning of 01 No of Condeser unit shall be measured and paid as Each job. | 3 | EACH JOB | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
8004tender.pdf
Tender Documents • 0.76 MB
BOQ_860810.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .