| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 CrAccepted-AOC | ₹3.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.7 Cr+₹52.0 L (16.6%)Rejected-AOC | ₹3.7 Cr+₹52.0 L (16.6%) | L2 | Rejected-AOC L2 |
| 3 | L3₹4.8 Cr+₹1.7 Cr (54.1%)Rejected-AOC 114 115 FIRST FLOOR AURORA TOWER EAST WING MG ROAD PUNE 411001 | PUNE | PUNE | MAHARASHTRA | 411001 | ₹4.8 Cr+₹1.7 Cr (54.1%) | L3 | Rejected-AOC L3 |
| 4 | L4₹5.1 Cr+₹2.0 Cr (63.5%)Rejected-AOC PO BIRLA VIKAS PO BIRLA VIKAS SATNA MADHYA PRADESH 485005 | SATNA | MADHYA PRADESH | 485005 | ₹5.1 Cr+₹2.0 Cr (63.5%) | L4 | Rejected-AOC L4 |
Tender Value
₹3.1 Cr
EMD Value
₹6.1 L
Closing Date
17 Mar 2023, 4:00 pmClosed
SE (AUTOMATION, N/M, SP)
VIDYUT BHAWAN, JYOTI NAGAR, JAIPUR
Modification work of 132 KV S/C Chambal Heerapura Line from overhead to Underground Cable (3 Phase and 1 spare) with 630 Sq mm, 132 KV XLPE insulated cable for proposed Jaipur Metro Phase 1D from Mansarovar to Ajmer Road Choraha/200 ft for approx.
2023_RRVPN_317329_1
RVPN/EHV/ASP/TN-103
Open Tender
Electrical Works
Turn-key
270 days
JAIPUR
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,900
SR AO (EA AND CASH) RVPN
₹6.1 L
JAIPUR
11 Mar 2024
4 Feb 2023
17 Mar 2023
5 Feb 2023
17 Mar 2023
22 Feb 2023
13 Feb 2023
MAIN MATERIAL/ ITEMS
Overhead Line
Super structure of 220 kV D/C Narrow Base type tower with stub and Cleat for termination of XLPE cable
(i) Stub 220KV D/C NB TTC (250Mtr SPAN)
(ii) S/S 220KV D/C NB TTC (250Mtr SPAN)
(iii) Stub 220KV D/C NB TTD (350Mtr SPAN)
(iv) S/S 220KV D/C NB TTD (350Mtr SPAN)
Conductor
ACSR Panther conductor
Panther conductor hardware
a) Double tension hardware
b)Armour Rod
c)M.S Joint
d)Al. Repair sleeve
e)Vibration damper
Disc insulator
G.I. Nut-Bolt, Step bolt & spring washer assorted size as per requirement & technical specification [For 220 KV D/C NB TTD Type tower(350 mtr. Span)]
G.I. Nut-Bolt, Step bolt & spring washer assorted size as per requirement & technical specification [For 220 KV D/C NB TTC Type tower(250 mtr. Span)]
Earthing material
a) Pipe type
Others
a) Number plate
b) Phase plate
c) Danger plate (132 KV)
Underground cable
132 kV, Single Core, 630Sq. mm XLPE Copper Cable as per foregoing specification requirements
145 kV rated voltage pre-moulded outdoor end termination kit complete with accessories suitable for the above underground cable
Solid bonding Link box with Link plates, bonding & grounding cable complete with other associated accessories for 1-phase
Galvanized Steel Supporting Structures/arrangement, gantry structure, ladders etc along-with clamps, connectors, nut-bolts, washers, foundation bolts etc. for suitable and safe termination of XLPE cable from terminal towers maintaining statutory clearances and safety as per IE rules including fencing arrangement
Terminal connector suitable for ACSR Panther on the Outdoor cable termination to connect cable end termination to ACSR panther Line.
Earthing material including cast iron pipes with suitable clamps, charcol, common salt etc complete set for each cable circuit (each having 3 core)
Warning Tapes as per Specification
Joint Box for (24 Fibre) OPGW Cable
Optical Fibre Cable and associated accessories/items as per specification
132 kV class of 120 kV rating LA with grading ring, discharge counter with Milli meter
OFAC/OFC and hardware fittings/ accessories alongwith associated FODP & accessories
Add: Any other item bidder may require to complete the Cable System as per specification requirements
Description of Work / Item(s)
Over head line
Detail Survey as per tentative route:- Which includes the following major activities- Pegging of line rute ,providing of survey pillar at an interval of 3-4 KM in the line route with required jungle clearance for survey,profile preoaration of approved route on graph sheet and making of offset on either side of line,marking of side clearance for hills,sand dunes etc,as per specification and tower scheduling.
Check survey as per approved route of line which inclused: re-checking of line route as per approved profile, chainage, tower centre marking, pit marking, bisection of angle towers as required at site.
Excavation:- Excavation excluding backfilling including shoring shuttering dewatering etc up to the required depth as per foundation Specification Drawing
(i) Any soil soft rock other than hard rock
Setting of template & stub/anchor or bolts;- Setting of template &Stub/Anchor Bolt & Removal after concreting excluding cost of excavation and concreting but including backfilling with excavated/ borrowed earth (with lead & lift) in layers with ramming and watering as per specification.
(i) Tower Including extension up to 9 meter
Concreting:- Providing and laying cement concrete for all types of foundation as per latest ISS:456 including cement sand, stone aggregate 20 mm nominal size, water etc. Preparing surface, shuttering, mixing, placing, ramming, curing, finishing s per specification and drawings
(ii) 1:3:6 Mix [M-10]
(iv) 1:1.5:3 Mix [M-20]
Steel Reinforcement:
Cutting, bending, welding of joints if required, fixing and placing of steel reinforcement as per specification and drawings including material.
Earthing:
(A) Earthing of towers with pipe type earthing excluding the supply of pipes, wires, flats & connectors, but including coke/charcoal, etc. excavation, auguring and back filling in all types of soil.
Erection of Tower.- Erection of super structure including D-shackle ACD, Hangers ,Also including tac welding of bolts and nuts up to bottom cross arm/beam level including application of zinc rich paints.
i) Erection of towers (with extension up to 9 meters)
OPGW Cable & Accessories
Joint Box (24 Fibers)
Dismantling of towers for shifting/Modification of 132 KV S/C Chambal-Heerapura line for proposed Jaipur Metro phase 1D ( Masarover to Ajmer road Chouraha/ 200 ft Bypass) (Dismantling of super structures along-with extensions, having tack welded Bolts & Nuts, including removing of D shackles, hangers, U BoIts, step bolts, ACD, Danger plate, number plate, Phase plate of tower including transportation from site to our store and stacking of all material)
(a) 132 KV S/C Towers (all types)
De-stringing of ACSR panther conductor: Dismantling of vibration dampers and armour rods, removal of conductor from clamps and fitting in rollers, de-tensioning, de-hoisting of insulator string as required and collecting the material & depositing the same in our store and stacking& depositing the same in our store and stacking.
Single Conductor
Dismantling of earth bonds, vibration dampers, de-clipping & fitting in rollers, de-tensioning and collecting the material & depositing Ihe same in our store and stacking.
One no. 7/3.15 mm Galvanized wire/OPGW
RESTRINGING OF CONDUCTOR/EARTH WIRE
(A) Restringing of ACSR Panther conductor: Dismantling of vibration dampers and armour rods, fitting in rollers, de-tensioning, holding & lowering of conductor, de-hoisting of insulator string as required, adding/ removing and jointing of conductor, hoisting of insulator string, lifting of conductor into rollers and re-tensioning, jointing, fitting of armour rods and and vibration dampers and clamping per route KM of the line section to be restrung dismantled material not re-used to be deposited in our stores & stacked
(i) Single Conductor
(C) Restringing of earth-wire/ OPGW: De-stringing of earth bond, vibration dampers, de-clipping and fitting in rollers, de-tensioning, holding & lowering of earth-wire/ OPGW, adding/ removing and jointing of earth-wire/ OPGW, lifting into rollers and re-tensioning, jointing, clipping & fitting of vibration dampers & earth-bond per route km of the line section to be restrung. Dismantled material not re-used to be deposited in our stores & stacked
(i) One No. 7/3.15 mm Galvanized Wire/ OPGW
Underground Cable
CABLE INSTALLATION
Surveying of cable route, excavation of trial holes as per field requirement, preparation of cable route profile, drawing of cable laying, final route alignment marking lines and grades/ preparation of final cable route drawing after approval and preparing bill of materials for complete route shown in drawing i.e. between terminal towers
Evaluation of thermal resistivity of soil along cable route (as per technical specification)
Handling, Transportation to site and laying of 132 kV, Single Core, 630 Sq. mm XLPE Copper Cable as per foregoing specification requirements
Establishing of 3-phase single circuit having (3 Phase +1 spare) 132kV single core, 630 sq. mm copper cable in trefoil/ approved formation along-with pilot fiber cable, providing of Warning tape tagging fixing, pipes for drain & gate crossing as per drawings and specifications in trench by pulling, drawing, etc. including cables, using standard cable installation equipments and as per directions of the engineer in charge and returning of unused items in Store.
Handling and making of outdoor type cable end terminations for 132 kV single core power cable as per specification
Erection of Galvanized Steel Supporting Structures/ arrangement, gentry structure, ladders etc along-with clamps, connectors, nut-bolts, washers, foundation bolts etc. for suitable and safe termination of XLPE cable from terminal towers maintaining statutory clearances and safety as per IE rules for each phase including fencing arrangement. (Structure to mount link boxes, cable end termination and surge arrester for each phase)
Erection of solid bonding Link box with Link plates, bonding & grounding cable complete with other associated accessories for 1-phase.
Earthing Material including cast iron pipes with suitable clamps, charcoal, common salt etc. complete set for Cable Circuit(each having 3 core )
Installation of Terminal connector suitable for ACSR Panther to connect cable end termination to ACSR panther Line.
Installation of 132 kV class of 120 kV rating Surge Arrestor with grading ring, discharge counter with Milli meter
Installation of of underground Optical fiber cable and associated accessories/ items as per specification along-with XLPE cable and termination at the both ends
Installation of OFAC/OFC and hardware fittings/ accessories alongwith associated FODP & accessories as per specification requirement
Charges for conducting pre-commissioning tests as per specification and successful commissioning of circuits
CIVIL WORKS
Cutting Black Bitumen surface up-to any depth including all layers of crust for laying Power Cables etc, staking of useful material and disposal of surplus debris including all leads including barricading, providing danger board/diversion board, lighting, reflectors etc.
Horizontal Direct Drilling (Trenchless Digging) method (with 250mm dia HDPE Pipe of minimum 6 PN and strength complying ISS) wherever open cut method cannot be adopted. (for single circuit with 3 cable core in each circuit+1 spare) (If required)
Earth work in excavation for buried cable trenches/foundations including dressing of sides and ramming of bottoms, lift up to 2.5 mtr. including taking out the excavated soil & backfilling of jhiri with watering & ramming , timbering & shoring ( wherever required ) disposal of surplus excavated soil as directed with all lead and lift including barricading, providing danger board/diversion board, lighting, reflectors etc.
Providing and laying of Cement concrete including curing, etc using stone aggregate 40 mm nominal size (crusher broken) in foundation plinth, excluding the cost of shuttering using 1 cement: 4 sand: 8 stone aggregate (For equipment foundation, junction box etc.)
P&L cement concrete in R.C.C. work in foundation ,rafts, footings, strap beams ,bases of columns etc., including curing ,compaction, finishing with rendering in cement sand mortar 1:3 (1cement :3 sand) and making good the joints , excl., the cost of centring and shuttering and reinforcement :M-20 grade mix 1:1.5:3 (1cement:1.5coarse sand : 3 graded stone aggregate 20 mm nominal size (For equipment foundation, junction box , culvert etc.)
Brick wall works, if required
Providing and fabricating steel reinforcement for R.C.C. work bending ,placing in position and binding complete including cost of binding wire in foundation ,raft footing ,strap beams base of column etc., up to plinth level hot rolled deformed (I.S.1139) cold twisted (I.S.1786)bars (For equipment foundation, junction box \ etc.)
Centring and shuttering with plywood or steel plates including strutting, propping bracing both ways with wooden members and removal of formwork for superstructure up to 4.5m height above plinth level for (For equipment foundation, junction box etc.)
Providing & Fixing of steel fabrication made of angles, tees, square bars or other flats black pipe with hold fast and fittings complete as per design and drawing including cutting welding and fabrication with priming coat of red oxide.
Providing & Laying HDPE pipe heavy duty of approved make jointed with solvent cement
(i) 250 mm dia.(for single circuit each circuit with 3 cable +1 spare)
(ii) HDPE PLB Duct for Optical Fiber Cable
Supply and laying inter locking RCC cable covers as per approved drawing
Supply, spreading of clean river sand in the cable trench and cable joint pit as per specification.
Providing & Fixing Cable Route Marker along the route of cable at the spacing of 50 meter etc. as per drawing and site requirement.
RR stone masonary in F/P CSM 1:4
Plastering 20 mm thickness CSM 1:6
Providing & laying plane cement concrete M20 Grade
Add: Any other item bidder may require to complete the Cable System as per specification requirements
SVPOWER LINKS PRIVATE LIMITED
Rahul Cables Pvt Ltd
Universal Cables Limited
SVPOWER LINKS PRIVATE LIMITED
Universal Cables Limited
Rahul Cables Pvt Ltd
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .