Tender Value
₹85.3 L
EMD Value
₹6.3 L
Closing Date
30 Sept 2026, 12:00 pm7d left
SE ALIGARH CIRCLE PWD ALIGARH
OFFICE OF THE SE ALIGARH CIRCLE PWD ALIGARH
Construction of Box culvert work in place of damaged bridge on Muzaffara Bamba from Km-5 of Kasimpur Godha Road to Km-3 of Chhalesar Road in Aligarh district
2026_CEALG_1186479_2
5058-Cashier(P.D.A)-26-27 Dt- 09-09-2026
Open Tender
Civil Works - Bridges
Fixed-rate
180 days
OFFICE OF THE EE PD PWD ALIGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹6.3 L
Yes
16 Sept 2026
16 Sept 2026
30 Sept 2026
16 Sept 2026
30 Sept 2026
16 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres. (Cement Concrete grade M-15 & M-20). As per Morth Sl. 2.04(II-A) & including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. | 24.22 | Cum | 1,750 | ₹42,393.75 |
| 2 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres. (Dismantling Brick / Tile work) As per Morth Sl. 2.04(II-B) & including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. | 205.59 | Cum | 390 | ₹80,180.1 |
| 3 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. (As per MORTH specification No. 304.1.B.(i)) & including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. | 321 | Cum | 115 | ₹36,915 |
| 4 | Sand Filling in Foundation Trenches as per Drawing & Technical Specification (As per Morth Sl.N. 15.03) & including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. | 39 | Cum | 2,850 | ₹1,11,150 |
| 5 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. (PCC Grade M15) As per Morth Clause 15.11 & including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. | 67.36 | Cum | 8,040 | ₹5,41,574.4 |
| 6 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. (PCC Grade M20) As per Morth Clause 15.11 & including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. | 141.29 | Cum | 7,780 | ₹10,99,236.2 |
| 7 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. (RCC Grade M25) As per Clause 15.11 & including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. | 68.95 | Cum | 10,000 | ₹6,89,500 |
| 8 | Plain/Reinforced Cement Concrete for wall & slab etc. complete as per Drawing and Technical Specifications. (RCC Grade M25) As per Morth Sr.No. 15.12 & including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. | 122.73 | Cum | 10,500 | ₹12,88,665 |
| 9 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. (As Per Morth Sl. 9.07) & including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. | 81.19 | Qtl | 7,400 | ₹6,00,806 |
| 10 | Supplying, fitting and placing Mild steel reinforcement complete in sub-structure as per drawing and Technical Specification. (As per Clause 13.07) & including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. | 144.51 | Qtl | 7,300 | ₹10,54,923 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.87 MB
BOQ_2233218.xls
BOQ • 0.26 MB
T2.pdf
PDF • 3.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .