Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹67.3 LAccepted-AOC | ₹67.3 L | L1 | Accepted-AOC lower rates |
| 2 | L2₹68.4 L+₹1.1 L (1.69%)Rejected-Finance | ₹68.4 L+₹1.1 L (1.69%) | L2 | Rejected-Finance higher rates |
| 3 | L3₹70.1 L+₹2.8 L (4.16%)Rejected-Finance HO NEAR PRIMARY SCHOOL VILL KAKARWAL DHURI SANGRUR | DHURI | SANGRUR | ₹70.1 L+₹2.8 L (4.16%) | L3 | Rejected-Finance higher rates |
| Sl No | Description | Qty | Unit | MALWA BUILDERS L2 | The Mahavir Co Op L and C Society Ltd. L3 | THE G.D. CONSTRUCTIONS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation by mechanical means(JCB or Hydraulic excavator) in trenches for pipe lines with straight or open cutting in streets or open area including and dressing sides levelling of beds of trenches to correct grade, cutting joint holes, refilling consolidation, diversion for traffic, crossing over trenches for access to the houses, watching, fencing, etc. and removal of surplus soil out side/inside the town involving lead upto 15 meter complete in all respect. | 24,529.07 | cum | 103 ₹25,26,494.21 | 105 ₹25,75,552.35 | 102 ₹25,01,965.14 Lowest |
| 2.00 | Lowering, jointing of RCC NP-2 plain end pipes 700 mm dia laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect. | 4,910.51 | Mtr | 385 ₹18,90,546.35 | 388 ₹19,05,277.88 | 380 ₹18,65,993.8 Lowest |
| 3.00 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of renches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres | 414.36 | cum | 191 ₹79,142.76 Lowest | 195 ₹80,800.2 | 191 ₹79,142.76 Lowest |
| 4.00 | Cement concrete 1:4:8 | 36.15 | cum | 3,856 ₹1,39,394.4 | 4,284 ₹1,54,866.6 | 3,213 ₹1,16,149.95 Lowest |
| 5.00 | Cement concrete 1:2:4 | 75.78 | cum | 4,903 ₹3,71,549.34 | 5,447 ₹4,12,773.66 | 4,085 ₹3,09,561.3 Lowest |
| 6.00 | Shuttering for concrete faces | 379.04 | sqm | 221 ₹83,767.84 Lowest | 221 ₹83,767.84 Lowest | 221 ₹83,767.84 Lowest |
| 7.00 | First class burnt brick work laid in cement sand mortar 1:6 | 170.38 | cum | 6,239 ₹10,63,000.82 Lowest | 6,481 ₹11,04,232.78 | 6,360 ₹10,83,616.8 |
| 8.00 | 10 mm thick Cement Plaster 1:4 on Side Walls | 409.12 | sqm | 172 ₹70,368.64 Lowest | 176 ₹72,005.12 | 172 ₹70,368.64 Lowest |
| 9.00 | 10 mm thick Cement Plaster 1:4on Floors | 195.06 | sqm | 132 ₹25,747.92 Lowest | 135 ₹26,333.1 | 132 ₹25,747.92 Lowest |
| 10.00 | RCC slab 1:2:4 with 60 kg steel per cum | 3.73 | cum | 9,186 ₹34,263.78 Lowest | 9,186 ₹34,263.78 Lowest | 9,186 ₹34,263.78 Lowest |
Tender Value
₹65.5 L
EMD Value
₹1.3 L
Closing Date
17 Feb 2026, 6:55 pmClosed
Xen Fatehgarh Sahib Sirhind Division
Executive Engineer Fatehgarh Sahib Canal and Ground Water Division WRD Punjab Sirhind
Estimate for Lining of W/C by laying UGPL of O/L RD 92500/TR of 1-R Disty
2026_WR_159235_5
03/2025-26
Open Tender
Civil Works
Item Rate
60 days
Near Fatehgarh Sahib
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
₹1.3 L
Yes
17 Sept 2026
3 Feb 2026
18 Feb 2026
3 Feb 2026
17 Feb 2026
3 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation by mechanical means(JCB or Hydraulic excavator) in trenches for pipe lines with straight or open cutting in streets or open area including and dressing sides levelling of beds of trenches to correct grade, cutting joint holes, refilling consolidation, diversion for traffic, crossing over trenches for access to the houses, watching, fencing, etc. and removal of surplus soil out side/inside the town involving lead upto 15 meter complete in all respect. | 24,529.07 | cum | - | - |
| 2 | Lowering, jointing of RCC NP-2 plain end pipes 700 mm dia laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect. | 4,910.51 | Mtr | - | - |
| 3 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of renches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres | 414.36 | cum | - | - |
| 4 | Cement concrete 1:4:8 | 36.15 | cum | - | - |
| 5 | Cement concrete 1:2:4 | 75.78 | cum | - | - |
| 6 | Shuttering for concrete faces | 379.04 | sqm | - | - |
| 7 | First class burnt brick work laid in cement sand mortar 1:6 | 170.38 | cum | - | - |
| 8 | 10 mm thick Cement Plaster 1:4 on Side Walls | 409.12 | sqm | - | - |
| 9 | 10 mm thick Cement Plaster 1:4on Floors | 195.06 | sqm | - | - |
| 10 | RCC slab 1:2:4 with 60 kg steel per cum | 3.73 | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
BOQ_322890.xls
BOQ • 0.26 MB
corrigendum5.pdf
PDF • 0.54 MB
corrigendum3.pdf
PDF • 0.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .