Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹17.4 L+₹5,233.93 (0.30%)Rejected-AOC KOTTOOR UNION | KOTTAYAM | KERALA | 686001 | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | K.Murugaiyan L2 | S.Ranjithkumar L1 |
|---|---|---|---|---|---|
| 1.001.CONSTRUCTION OF ANGANWADI BUILDING @ THENPARAI MAIN ROAD IN THENPARAI PANCHAYAT | |||||
| 2.00 | Earth work Excavation and depositing on bank with initial lead and lift in all classes of soil except hard rock requiring blasting including all labour charges etc.,complete for for foundation upto | 48.21 | Cum | 263.78 ₹12,716.83 | 263.7 ₹12,712.98 Lowest |
| 3.00 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 16.67 | Cum | 2,605.74 ₹43,437.69 | 2,605.7 ₹43,437.02 Lowest |
| 4.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. | 14.63 | Cum | 6,570.37 ₹96,124.51 | 6,570.3 ₹96,123.49 Lowest |
| 5.00Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4" and conveyance of all materials to site and all labour charges etc complete | |||||
| 6.00 | I. Foundation and Basement | 14.67 | Cum | 6,340.47 ₹93,014.69 | 6,340.4 ₹93,013.67 Lowest |
| 7.00 | II. Superstructure- Ground floor | 22.8 | Cum | 6,433.34 ₹1,46,680.15 | 6,433.3 ₹1,46,679.24 Lowest |
| 8.00Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists(Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casurina props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for the following items.(RCC floor slab, roof slab, Rectangular/ square, Tee/ Ell beams, Lintels, staircase waist slabs, Landing slabs, Landing beam, Portico beam etc., ). | |||||
| 9.00 | II. Centering below basement | 42.45 | Sqm | 547.5 ₹23,241.38 Lowest | 547.5 ₹23,241.38 Lowest |
| 10.00 | IV. LINTELS, RCC SLABS, BEAMS, TEE or ELL BEAMS, | 117.46 | Sqm | 1,095 ₹1,28,618.7 Lowest | 1,095 ₹1,28,618.7 Lowest |
Tender Value
Refer Docs
EMD Value
₹17,610
Closing Date
23 Sept 2025, 3:00 pmClosed
Block Development Officer(B.pt),Kottur Block.
Block Development Officer(B.pt),Kottur Block.
1.CONSTRUCTION OF ANGANWADI BUILDING THENPARAI MAIN ROAD IN THENPARAI PANCHAYAT
2025_RDTN_604853_1
RC No276 2025a2 12 09 2025 FBDP FUND 2025 2026 Kottur block Thenparai pt 01
Open Tender
Civil Works - Buildings
Item Rate
180 days
Kottur Block
As Per Tender Document
3 documents required · 3 mandatory
₹0
₹17,610
Yes
13 Nov 2025
16 Sept 2025
23 Sept 2025
16 Sept 2025
23 Sept 2025
16 Sept 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .