Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.7 LAccepted-AOC | L-1 | Accepted-AOC Agreement made and supply order placed. | |
| 2 | L-2₹5.0 L+₹26,600 (5.65%)Rejected-Finance | L-2 | Rejected-Finance Agreement made with L-1 Agency |
Tender Value
Refer Docs
EMD Value
₹9,300
Closing Date
10 Sept 2020, 3:00 pmClosed
Executive Engineer, W.S. Mech. Division, Rewari
Executive Engineer, W.S. Mech. Division, Rewari
Repair of 2 No. 150 Cs. Axial Flow VT Pump at Pump House JC-1
2020_HRY_142682_1
3949/6-A dated 02.09.2020
Open Tender
Pumps/Motors
Works
90 days
Executive Engineer, W.S. Mech. Division
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
Executive Engineer, W.S. Mech. Division, Rewari
₹9,300
Yes
24 Nov 2020
4 Sept 2020
11 Sept 2020
4 Sept 2020
10 Sept 2020
4 Sept 2020
Amount
Providing of New rubber bearing housing 2 Nos. with rubber bush of 150 Cs Pump.
New SS Sleeve of 150 Cs Pump
Repairing of propeller petals and balancing of 150 Cs Pump.
SS Coupler as per sample with complete fastener & cups of 150 Cs. Pump
Rubber bush (As per existing) of 150 Cs. Pump.
Terms & Conditions:- 1. The tender rate will be inclusive all taxes including GST as applicable. 2. The tender rate will be for F.O.R. destination and inclusive of all incidental charges, enroute & at destination. Nothing extra shall be paid separately. 3. WWC@1% will be deducted from the each bill of the agency. 4. The rate should be inclusive carriage, fitting and allied parts complete in all respect with left over items (if any) as per site requirement. 5. Goods which to be used should be as per sample and conforming to the site condition & also conforming to I.S. Specification. 6. Warranty must be 18 Months or 2500 Operation hours, whichever is earlier from the date of acceptance. 7. Department will not be responsible for non submission of BOQ / Bid Document online by due date, due to any fault of internet/ E-tendering. 8. Old scrap will be property of the department, if any. 9. Completion period – completion period is 3 Months.
GKS ENGINEERS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .