Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAdmitted-Finance | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | RAMALAKSHMANAN TNEB CONTRACT L1 |
|---|---|---|---|---|
| 1.00 | Loading, Transporting and unloading of poles and associated materials from substore/vellore to Sathumadurai section work spot upto 5 kms | 37 | Per Pole | 600 ₹22,200 Lowest |
| 2.00 | Excavation and erection of 8.0m pole | 22 | Per Pole | 1,050 ₹23,100 Lowest |
| 3.00 | Excavation and erection of 9.0m pole | 15 | Per Pole | 1,250 ₹18,750 Lowest |
| 4.00 | Excavation, erection of stay set complete for HT/LT pole | 18 | each | 1,000 ₹18,000 Lowest |
| 5.00 | Stringing of 7/4.09 AAAC size of conductor (circuit length as mentioned in sanction copy) | 1.13 | Per Km | 3,300 ₹3,722.4 Lowest |
| 6.00 | Stringing of 7/2.50 AAAC size of conductor (circuit length as mentioned in sanction copy) | 8.33 | Per Km | 2,300 ₹19,149.8 Lowest |
| 7.00 | Stringing of 7/3.35 AAAC size of conductor (circuit length as mentioned in sanction copy) | 0.41 | Per Km | 2,800 ₹1,145.2 Lowest |
| 8.00 | Fixing of Tapping and Guarding x arm | 8 | each | 210 ₹1,680 Lowest |
| 9.00 | Loading Unloading of line materials from section to works spot up to 5 KM | 2 | pe Ton | 1,650 ₹3,300 Lowest |
| 10.00 | Fixing of LT Three Phase x arm | 11 | each | 120 ₹1,320 Lowest |
Tender Value
Refer Docs
Closing Date
8 Dec 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE Vellore
Gandhi Nagar Katpadi
Works Contract for Extension of supply works in HT LT feeders for erection poles ,transporting of poles, paving HTLT Line in various work orders in respect of Assistant Engineer O M Sathumadurai section
2025_EB_625947_1
EE VLR 028
Limited
Electrical and Maintenance Works
Works
180 days
Sathumadurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
31 Dec 2025
24 Nov 2025
9 Dec 2025
24 Nov 2025
8 Dec 2025
24 Nov 2025
Amount
Loading, Transporting and unloading of poles and associated materials from substore/vellore to Sathumadurai section work spot upto 5 kms
Excavation and erection of 8.0m pole
Excavation and erection of 9.0m pole
Excavation, erection of stay set complete for HT/LT pole
Stringing of 7/4.09 AAAC size of conductor (circuit length as mentioned in sanction copy)
Stringing of 7/2.50 AAAC size of conductor (circuit length as mentioned in sanction copy)
Stringing of 7/3.35 AAAC size of conductor (circuit length as mentioned in sanction copy)
Fixing of Tapping and Guarding x arm
Loading Unloading of line materials from section to works spot up to 5 KM
Fixing of LT Three Phase x arm
Fixing of LT Shackle with aliminum knob
Dismantling of all line materials
Dismantling of RCC, REC, PSC pole including closing of the pit
Fixing of LT Pin Insulator
Dismantling up to of 7/3.35 AAAC size of conductor (circuit length as mentioned in sanction copy)
Dismantling above of 7/3.35 AAAC size of conductor (circuit length as mentioned in sanction copy)
pole earthing for various size of pole
Concreting of various size of pole
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BOQ_748502.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .