Tender Value
Refer Docs
EMD Value
₹19.9 L
Closing Date
5 Jul 2022, 3:00 pmClosed
PR & CC
Evaluation Criteria: Overall lowest Cost (L1) basisAward Criteria: 100% to L-1 bidder
22000161-HD-10157
22000161-HD-10157
Open Tender
Unknown (Unspecified Location)
₹0
₹19.9 L
5 Jul 2022
14 Jun 2022
5 Jul 2022
5 Jul 2022
14 Jun 2022 - 22 Jun 2022
21 Jun 2022
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | Supply of LNG tanks | Supply of LNG tanks — SUPPLY OF LNG TANKS WITH ALL NECESSARY AUXILIARY UNITS AND ASSOCIATED INSTRUMENTS: SCOPE INCLUDES BUT NOT LIMITED TO DESIGN, DETAILED ENGINEERING, PROCUREMENT OF MATERIALS, MANUFACTURING AND INSPECTION, FABRICATION, PAINTING, SUPPLY, TRANSPORTATION AND UNLOADING OF 56.8 KL CAPACITY (DOUBLE-WALLED VACUUM INSULATED CRYOGENIC TANK) WITH NECESSARY VALVES, ASSOCIATED PIPING, ASSOCIATED INSTRUMENTS, SAFETY RELIEF VALVES, PBE AND VENT STACK AS PER P AND ID, DATA SHEET AND TECHNICAL SPECIFICATION AND AS PER OUTCOME OF DETAILED ENGINEERING CARRIED OUT BY BIDDER. BIDDER'S SCOPE ALSO INCLUDES BASIC DESIGN, DEVELOPMENT OF P AND ID, LAYOUT AS PER PESO RULES, DESIGN BASIS AND OTHER APPLICABLE GUIDELINES, LIAISONING AND OBTAINING APPROVAL FROM COMPETENT AUTHORITIES (PESO, CTE AND CTO) FOR ENTIRE LNG STORAGE AND REGASIFICATION FACILITIES INCLUDING FACILITIES OF CNG AREA (ALL INPUTS RELATED TO CNG AREA SHALL BE PROVIDED BY CLIENT) AS DEFINED IN TENDER AND SCOPE MATRIX. DETAIL SPECIFICATION AND TERMS AND CONDITION AS GIVEN IN TENDER DOCUMENT. | - | Each |
| 2 | Installation of 56.8 KL LNG st | Installation of 56.8 KL LNG st — INSTALLATION, TESTING AND COMMISSIONING OF 56.8 KL CAPACITY DOUBLE-WALLED VACUUM INSULATED CRYOGENIC LNG STORAGE TANKS WITH ALL NECESSARY AUXILIARY UNITS AND ASSOCIATED INSTRUMENTS AS DESCRIBED AT SOR. DETAIL SPECIFICATION AND TERMS AND CONDITION AS GIVEN IN TENDER DOCUMENT. | - | Each |
| 3 | Supply of LNG unloading centri | Supply of LNG unloading centri — SUPPLY OF LNG UNLOADING CENTRIFUGAL PUMPS SKID (350 LPM) FOR FILLING UP LNG STORAGE TANKS WITH ALL NECESSARY AUXILIARY UNITS AND ASSOCIATED INSTRUMENTS: SCOPE INCLUDES BUT NOT LIMITED TO DESIGN, DETAILED ENGINEERING, PROCUREMENT OF MATERIALS, MANUFACTURING AND INSPECTION, FABRICATION, PAINTING, SUPPLY, TRANSPORTATION AND UNLOADING OF LNG UNLOADING CENTRIFUGAL PUMPS (350 LPM) FOR FILLING UP LNG STORAGE TANKS INCLUDING COUPLING, DRIVE MOTOR, PIPING, VALVES, VFD AND ASSOCIATED INSTRUMENTS, JUNCTION BOX AND CABLE UPTO THE VFD, LOCAL PUSH BUTTON STATION AS PER P AND ID, DATA SHEET AND TECHNICAL SPECIFICATION AND AS PER OUTCOME OF DETAILED ENGINEERING CARRIED OUT BY BIDDER. DETAIL SPECIFICATION AND TERMS AND CONDITION AS GIVEN IN TENDER DOCUMENT. | - | Each |
| 4 | Installation of LNG unloadin | Installation of LNG unloadin — INSTALLATION, TESTING AND COMMISSIONING OF LNG UNLOADING CENTRIFUGAL PUMPS (350 LPM) WITH ALL NECESSARY AUXILIARY UNITS AND ASSOCIATED INSTRUMENTS AS DESCRIBED AT SOR. DETAIL SPECIFICATION AND TERMS AND CONDITION AS GIVEN IN TENDER DOCUMENT. | - | Each |
| 5 | Supply of High pressure recipr | Supply of High pressure recipr — SUPPLY OF HIGH PRESSURE RECIPROCATING PUMPS (18 LPM, DELIVERY PRESSURE 255 BARG) WITH ALL NECESSARY AUXILIARY UNITS AND ASSOCIATED INSTRUMENTS: SCOPE INCLUDES BUT NOT LIMITED TO DESIGN, DETAILED ENGINEERING, PROCUREMENT OF MATERIALS, MANUFACTURING AND INSPECTION, FABRICATION, PAINTING, SUPPLY, TRANSPORTATION AND UNLOADING OF HIGH PRESSURE RECIPROCATING PUMPS (18 LPM, DELIVERY PRESSURE 255 BARG) WITH ALL NECESSARY AUXILIARY UNITS, PIPING AND ASSOCIATED INSTRUMENTS INLINE WITH DATA SHEET AND TENDER REQUIREMENT AND AS PER OUTCOME OF DETAILED ENGINEERING CARRIED OUT BY BIDDER. DETAIL SPECIFICATION AND TERMS AND CONDITION AS GIVEN IN TENDER DOCUMENT. | - | Each |
| 6 | Installation of High pressure | Installation of High pressure — INSTALLATION, TESTING AND COMMISSIONING OF HIGH PRESSURE RECIPROCATING PUMPS (18 LPM, DELIVERY PRESSURE 255 BARG) WITH ALL NECESSARY AUXILIARY UNITS AND ASSOCIATED INSTRUMENTS AS DESCRIBED AT SOR. DETAIL SPECIFICATION AND TERMS AND CONDITION AS GIVEN IN TENDER DOCUMENT. | - | Each |
| 7 | Supply of high pressure vapori | Supply of high pressure vapori — SUPPLY OF HIGH PRESSURE VAPORIZER (650 SCMH, 8 HOUR DUTY) (1 WORKING + 1 STANDBY) WITH ALL NECESSARY AUXILIARY UNITS AND ASSOCIATED INSTRUMENTS: SCOPE INCLUDES BUT NOT LIMITED TO DESIGN, DETAILED ENGINEERING, PROCUREMENT OF MATERIALS, MANUFACTURING AND INSPECTION, FABRICATION, PAINTING, SUPPLY, TRANSPORTATION AND UNLOADING OF HIGH PRESSURE VAPORIZER (650 SCMH, 8 HOUR DUTY)WITH ALL NECESSARY AUXILIARY UNITS, PIPING AND ASSOCIATED INSTRUMENTS (1 WORKING + 1 STANDBY) INLINE WITH DATA SHEET AND TENDER REQUIREMENT AND AS PER OUTCOME OF DETAILED ENGINEERING CARRIED OUT BY BIDDER. DETAIL SPECIFICATION AND TERMS AND CONDITION AS GIVEN IN TENDER DOCUMENT. | - | Each |
| 8 | Installation of high pressur | Installation of high pressur — INSTALLATION, TESTING AND COMMISSIONING OF HIGH PRESSURE VAPORIZER (650 SCMH, 8 HOUR DUTY) WITH ALL NECESSARY AUXILIARY UNITS AND ASSOCIATED INSTRUMENTS AS DESCRIBED AT SOR. DETAIL SPECIFICATION AND TERMS AND CONDITION AS GIVEN IN TENDER DOCUMENT. | - | Each |
| 9 | Supply of Priority Panel | Supply of Priority Panel — SUPPLY OF PRIORITY PANEL ALONG CNG MOBILE CASCADE FILL POST, SS TUBE, SS VALVES AND SS FITTINGS WITH ALL NECESSARY AUXILIARY UNITS AND ASSOCIATED INSTRUMENTS: SCOPE INCLUDES BUT NOT LIMITED TO DESIGN, DETAILED ENGINEERING, PROCUREMENT OF MATERIALS, MANUFACTURING AND INSPECTION, FABRICATION, PAINTING, SUPPLY, TRANSPORTATION AND UNLOADING OF PRIORITY PANEL ALONG WITH CNG MOBILE CASCADE FILL POST, FLEXIBLE HOSE, SS TUBE, SS VALVES AND SS FITTINGS WITH ALL NECESSARY AUXILIARY UNITS REQUIRED TO CONNECT 1 NO. STATIONARY CASCADE (CASCADE IS FREE ISSUE MATERIAL) AND FOR 2 NOS. LCV FILLING POINTS (LCV FILLING POST IS IN BIDDER'S SCOPE) AND 2 NOS. CNG DISPENSER (DISPENSER IS FREE ISSUE MATERIAL) INLINE WITH DATA SHEET AND TENDER REQUIREMENT AND AS PER OUTCOME OF DETAILED ENGINEERING CARRIED OUT BY BIDDER. DETAIL SPECIFICATION AND TERMS AND CONDITION AS GIVEN IN TENDER DOCUMENT. | - | Lump Sum |
| 10 | Installation of Priority Pan | Installation of Priority Pan — INSTALLATION, TESTING AND COMMISSIONING OF PRIORITY PANEL ALONG WITH SS TUBING WORKS TO CONNECT 1 NO. STATIONARY CASCADE, 2 NOS. LCV FILLING POINTS AND 2 NOS. CNG DISPENSER (DISPENSER IS FREE ISSUE MATERIAL) INLINE WITH P AND ID, PLOT PLAN AND TENDER REQUIREMENT AS DESCRIBED AT SOR. DETAIL SPECIFICATION AND TERMS AND CONDITION AS GIVEN IN TENDER DOCUMENT. | - | Lump Sum |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
22000161-HD-10157.pdf
TENDER_DOCUMENT • 23.48 MB
Download all tender documents and submit your bid