| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.5 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹53.4 L+₹6.9 L (14.8%)Rejected-Finance | L2 | Rejected-Finance Not being L1 | |
| 3 | L3₹62.9 L+₹16.4 L (35.4%)Rejected-Finance | L3 | Rejected-Finance Not being L1 | |
| 4 | L4₹69.0 L+₹22.5 L (48.5%)Rejected-Finance | L4 | Rejected-Finance Not being L1 | |
| 5 | L5₹74.0 L+₹27.5 L (59.2%)Rejected-Finance | L5 | Rejected-Finance Not being L1 |
Tender Value
₹70.7 L
EMD Value
₹1.4 L
Closing Date
2 Jan 2020, 6:00 pmClosed
AGM (E-C), Amritsar Airport
BCAS Building, Engineering wing, AAI, Amritsar.
Construction of Boundary Wall at AAI Land Near Bibiwala Chowk at Bathinda Airport.
2019_AAI_38253_1
AAI/BATHINDA/CMD/2019-20/W-111
Open Tender
Civil Works
Item Rate
270 days
Bathinda Airport
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,120
Airports Authority of India
₹1.4 L
4 Jan 2021
18 Dec 2019
8 Jan 2020
19 Dec 2019
2 Jan 2020
19 Dec 2019
19 Dec 2019 - 27 Dec 2019
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m inwidth or 10 sqm on plan),including dressing of sides and ramming ofbottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All Kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level a)1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 40 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : a)1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stoneaggregate 20 mm nominal size).
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : a)1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stoneaggregate 20 mm nominal size).
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level a)Thermo-Mechanically Treated bars of grade Fe-500D or more.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. a)Thermo-Mechanically Treated bars of grade Fe-500D or more.
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: a)Cement mortar 1:4 (1 cement : 4 coarse sand)
6 mm cement plaster of mix : 1:3 (1 cement : 3 fine sand)
12 mm cement plaster of mix: a)1:4 (1 cement: 4 fine sand).
15 mm cement plaster on the rough side of single or half brick wall of mix : a)1:4 (1 cement: 4 fine sand).
Centering and shuttering including strutting, propping etc. and removal of form for all heights: For Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for all heights: Columns, Pillars, Piers, Abutments, Posts and Struts
Centering and shuttering including strutting, propping etc. and removal of form for all heights: Lintels, beams, plinth beams, girders, bressumers and cantilevers
Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
Painting with synthetic enamel paint of approved brand and manufacture to give even shade : a)Two or more coats on new work
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire
Providing and fixing 110 mm dia., upto 300 mm long Upvc (Working pressure 4Kg/Sqm) pipe confirming to IS:4985 in brick masonary biundary wall at the time of construction, As per the direction of Engineer in Charge.
Preparation and submission of detailed structural design of proposed boundary wall i/c layout, service drawings and design and drawing for RCC structure all complete as per scope of work including vetting through IIT/govt. institute as per direction of Engineer -in -charge. NOTE : a) Detailed structural design drawings to make all good for execution duly vetted by authority specified above shall be submitted within 20 days from issue of award letter. b) Six set of detailed working and structural drawing after vetting IIT/Govt. institute are to be submitted along with design calculation original tracings etc. complete as per direction of Engineer- in- charge. c) Nothing extra shall be paid on account of any modification / change suggested by AAI. d) Nothing extra shall be paid for Soil testing.
M/s Shree Builders SGNR
A.G. CONSTRUCTION CO.
M/S VIJAY LAXMI INFRATACH
Naagar Infrastructure Pvt Ltd
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .