Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-Finance | ₹3.0 L | L1 | Accepted-Finance Lowest |
| 2 | L2₹3.0 L+₹5,684.94 (1.92%)Rejected-Finance R O SHARMA NIWAS BHATTA KUFFER SANJAULI TEHSIL DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | ₹3.0 L+₹5,684.94 (1.92%) | L2 | Rejected-Finance 2nd Lowest |
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
10 Aug 2026, 10:00 amClosed
Executive Engineer kasumpti Division HPPWD Shimla3
Executive Engineer kasumpti Division HPPWD Shimla3
Construction dismantalling and Retaining Wall at RD 3/725 to 3/732 ).Balance work.
2026_PWD_140337_6
SD-I-CTR-Tender-26- 13401 dt 30-07-2026
Open Tender
Civil Works
Percentage
30 days
Shimla
AS per SBD
13 documents required · 13 mandatory
₹350
₹6,000
13 Aug 2026
1 Aug 2026
10 Aug 2026
1 Aug 2026
10 Aug 2026
1 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (i) Nominal concrete 1:4:8 or richer mix (i/c equivalent design mix). | - | Per Cubic Metre | 1,250 | - |
| 2 | Providing and laying concrete for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802,803,1202 and 1203 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.(a) Cement Mortar 1:4:8(One cement:Four sand:Eight graded stone aggregate20 mm(Twenty milimetre) nominal size). | - | Per Cubic Metre | 4,800 | - |
| 3 | Backfilling behind abutment, wing wall and return wall complete as per drawings and technical specification clause 1204.3.8 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (a) Granular material. | - | Per Cubic Metre | 1,250 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
SBD299194.pdf
Tender Documents • 6.90 MB
BOQ_208162.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .