Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.8 CrAccepted-AOC | ₹2.8 Cr | 1 | Accepted-AOC highest bidder |
Tender Value
₹2.9 Cr
EMD Value
₹1.4 L
Closing Date
12 Dec 2019, 3:00 pmClosed
EXECUTIVE ENGINEER KURLA MUMBAI BOARD
EXECUTIVE ENGINEER KURLA MUMBAI BOARD MHADA
PROPOSED REDEVELOPMENT OF EXISTING TILAK NAGAR SAMAJ MANDIR AND OBTAINING ALL RELEVENT PERMISSIONS AND REREQUIRED COMPLETION CERTIFICATE FROM CONCERNED LOCAL AUTHORITY ON LUMP SUM TURNKEY BASIS ON PLOT BEARING C.T.S.NO.18 (PT) VILLAGE CHEMBUR CHEMBUR
2019_MHADA_514664_1
EE/KURLA/MB/E-TENDER/4/2019-20
Open Tender
Civil Works
Turn-key
547 days
TILAK NAGAR CHEMBUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,240
Online Payment
₹1.4 L
Yes
28 Aug 2020
30 Nov 2019
16 Dec 2019
2 Dec 2019
12 Dec 2019
3 Dec 2019
Amount
Proposed Redevelopment of Existing Tilak Nagar Samaj Mandir and Obtaining all relevent permission & required completion certificated from concered local authority on lump sum turnkey basis on plot bearing c.t.s. No. 18(pt) village chembur mumbai Total Amount of Work Rs. 285.00 Lack
I// WE HEREBY QUOTE RATE IN (IN FIGURE) RS. __________________ PER SQ. MTR. (IN WORDS) RUPEES ______________ _____ _______ ________ PER SQ. MTR. OF BUILT UP AREA FOR THE CONSTRUCTION OF BUILDING COMPRISING RESIDENTIAL TENEMENTS, UNDER LIG / MIG / HIG AND N.R. TENEMENTS. I/WE ALSO AGREE TO EXECUTE THE WORK AS PER THE SCOPE OF WORK,SPECIFICATIONS, TERMS AND CONDITIONS OF TENDER. Note: - 1) The Built-up Area of building shall be actual construction area of building along with lift and staircase, balcony, lift room, pump and meter room, common passages, society office, watchman cabin and Non-Residential tenements. As regards the stilt portion, the actual area under staircase, lift well, society office and servant’s toilet will be considered at 100% of the construction area. The remaining stilt area will be counted at 50% of the construction area. As regards the stilt portion, the actual area under , lift well, society office and servant’s toilet will be considered at 100% of the construction area. Any other component shall not be included in built up area calculations. The area calculations for payment shall be got certified / approved from Chief Architect & Planner MHADA. In case of any dispute regarding Built Up Area Calculation, the decision of Dy. Chief Engineer (East) / M.B. shall be final and binding on Construction Agency. 2) The housing schemes LIG, MIG, HIG and NR means Lower Income Group, Middle Income Group, Higher Income Group and Non-Residential tenements respectively. 3) ''The rate to be quoted shall be inclusive of all taxes, Labour cess and dues other levies that are imposed by Government from time to time and increase in any of the taxes, excise, octroi, duties, royalties, any other non reimbursable charges Excluding GST Charges towards MCGM and local authorities paid seperetely at the submission of demand. Signature of Construction Agency
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .