Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.5 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹11.3 L+₹85,519.22 (8.18%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹11.4 L+₹89,354.51 (8.54%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹11.4 L+₹94,208.88 (9.01%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹11.5 L+₹1.0 L (9.71%)Admitted-Finance 9 187 KATTURKOTTAI UTHIRAKIDIKAVAL KALAPPPANAYAKKENPATTY NAMAKKAL 637404 | NAMAKKAL | NAMAKKAL | TAMIL NADU | 637404 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M.Arumugam L7 | Bluecontinent L10 | SSM CONSTRUCTION L9 | APPA ASSOCIATES L13 | SRI AGS & CO L12 | VENGAIYAR AND CO L3 | ALAGURAJ L4 | Sri Annamar Construction L5 | VS CONSTRUCTION L8 | PNT TRADERS L1 | KSP Construction L2 | AJS Contractors L6 | M/s.J.G Construction L11 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00construction of Retaining Wall and culvert at srilangan Tamils Refugees camp at Murungapatti H/O Murungapatti | ||||||||||||||||
| 2.00 | Earth work excavation including all labourcharges including all cost etc | 131.5 | cum | 120.2 ₹15,806.3 | 192.11 ₹25,262.47 | 100 ₹13,150 | 112.5 ₹14,793.75 | 150 ₹19,725 | 187 ₹24,590.5 | 193 ₹25,379.5 | 50 ₹6,575 Lowest | 150 ₹19,725 | 129 ₹16,963.5 | 94 ₹12,361 | 285 ₹37,477.5 | 250 ₹32,875 |
| 3.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications | 19.28 | cum | 3,800.5 ₹73,273.64 | 4,496.25 ₹86,687.7 | 2,800 ₹53,984 Lowest | 4,704 ₹90,693.12 | 4,850 ₹93,508 | 4,154 ₹80,089.12 | 3,999 ₹77,100.72 | 4,500 ₹86,760 | 4,500 ₹86,760 | 3,500 ₹67,480 | 4,184 ₹80,667.52 | 4,200 ₹80,976 | 4,800 ₹92,544 |
| 4.00 | Supplying and erecting centering shuttering including necessary supports for planesurface including all cost etc | 433.34 | sqm | 390.5 ₹1,69,219.27 | 515.03 ₹2,23,183.1 | 550 ₹2,38,337 | 467 ₹2,02,369.78 | 330 ₹1,43,002.2 | 449 ₹1,94,569.66 | 399 ₹1,72,902.66 | 400 ₹1,73,336 | 350 ₹1,51,669 | 350 ₹1,51,669 | 420 ₹1,82,002.8 | 350 ₹1,51,669 | 300 ₹1,30,002 Lowest |
| 5.00 | Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3 | 136.86 | cum | 4,770.25 ₹6,52,856.42 | 4,578 ₹6,26,545.08 | 4,700 ₹6,43,242 | 4,940 ₹6,76,088.4 | 5,350 ₹7,32,201 | 4,026 ₹5,50,998.36 | 4,380 ₹5,99,446.8 | 4,500 ₹6,15,870 | 4,900 ₹6,70,614 | 4,000 ₹5,47,440 Lowest | 4,382 ₹5,99,720.52 | 4,500 ₹6,15,870 | 5,188 ₹7,10,029.68 |
| 6.00 | Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3 | 12.15 | cum | 5,100.2 ₹61,967.43 | 5,313.75 ₹64,562.06 | 5,000 ₹60,750 | 5,824 ₹70,761.6 | 5,600 ₹68,040 | 5,988 ₹72,754.2 | 4,700 ₹57,105 | 4,600 ₹55,890 | 6,000 ₹72,900 | 4,300 ₹52,245 Lowest | 5,491 ₹66,715.65 | 4,800 ₹58,320 | 5,700 ₹69,255 |
| 7.00 | Plastering with CM 1:5, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2. | 3.6 | sqm | 250.1 ₹900.36 | 232.99 ₹838.76 | 550 ₹1,980 | 488 ₹1,756.8 | 400 ₹1,440 | 336 ₹1,209.6 | 201 ₹723.6 Lowest | 750 ₹2,700 | 250 ₹900 | 4,400 ₹15,840 | 484 ₹1,742.4 | 450 ₹1,620 | 400 ₹1,440 |
| 8.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.32 | mt | 68,000 ₹21,760 | 81,750 ₹26,160 | 71,000 ₹22,720 | 78,471 ₹25,110.72 | 72,000 ₹23,040 | 69,610 ₹22,275.2 | 64,000 ₹20,480 | 74,000 ₹23,680 | 71,000 ₹22,720 | 70,000 ₹22,400 | 7,182 ₹2,298.24 Lowest | 70,000 ₹22,400 | 1,00,000 ₹32,000 |
| 9.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 1.89 | cum | 7,250.15 ₹13,702.78 | 6,131.25 ₹11,588.06 | 4,500 ₹8,505 | 7,909.99 ₹14,949.88 | 7,500 ₹14,175 | 8,233 ₹15,560.37 | 6,890 ₹13,022.1 | 4,000 ₹7,560 Lowest | 7,600 ₹14,364 | 6,500 ₹12,285 | 7,031 ₹13,288.59 | 5,000 ₹9,450 | 6,000 ₹11,340 |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 1,81,708 ₹1,81,708 | 1,91,669 ₹1,91,669 | 1,87,680 ₹1,87,680 | 1,97,374 ₹1,97,374 | 1,97,124 ₹1,97,124 | 1,73,168 ₹1,73,168 | 1,73,909 ₹1,73,909 | 1,75,027 ₹1,75,027 | 1,87,137 ₹1,87,137 | 1,59,538 ₹1,59,538 Lowest | 1,72,583 ₹1,72,583 | 1,76,001 ₹1,76,001 | 1,94,307 ₹1,94,307 |
Tender Value
₹15.4 L
EMD Value
₹15,380
Closing Date
17 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Commissioner cum Block development officer (BP)
panchayat union veerapandy
contruction of Retaining Wall and culvert at sri Lankan Tamils Refugees camp at Murungapatti H/O Murungapatti under PU GF/2026-2027
2026_RDTN_720973_1
2397/2026/A2 dt 02.11.2026
Open Tender
Civil Works
Item Wise
90 days
Panchayat union office, veerapandy, Salem District
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹15,380
Panchayat union office veerapandy
24 Nov 2026
2 Nov 2026
17 Nov 2026
2 Nov 2026
17 Nov 2026
2 Nov 2026
6 Nov 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | construction of Retaining Wall and culvert at srilangan Tamils Refugees camp at Murungapatti H/O Murungapatti | - | - | - | - |
| 2 | Earth work excavation including all labourcharges including all cost etc | 131.5 | cum | - | - |
| 3 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications | 19.28 | cum | - | - |
| 4 | Supplying and erecting centering shuttering including necessary supports for planesurface including all cost etc | 433.34 | sqm | - | - |
| 5 | Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3 | 136.86 | cum | - | - |
| 6 | Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3 | 12.15 | cum | - | - |
| 7 | Plastering with CM 1:5, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2. | 3.6 | sqm | - | - |
| 8 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.32 | mt | - | - |
| 9 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 1.89 | cum | - | - |
| 10 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.44 MB
BOQ_865756.xls
BOQ • 0.24 MB
1.pdf
Tender Documents • 14.87 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .