Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹5.0 L+₹5,389.22 (1.10%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹5.0 L
EMD Value
₹5,000
Closing Date
21 Jul 2023, 3:00 pmClosed
Block Development officer
BDO Office Uthangarai
Krishnagiri District Uthangarai Block Under AGAMT II - 2023 - 2024 Providing New bore well and Hand Pump set at Keelmathur Burial ground ,Construction of Compound Wall at Keelmathur Burial Ground ( 48M ) at Keelmathur Panchayat Package No UTG 04
2023_RDTN_339989_1
ROCNO8254_2022_R10_28_06_2023
Open Tender
Civil Works
Item Rate
180 days
Uthangarai
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,000
BDO Office Uthangarai
8 Aug 2023
10 Jul 2023
21 Jul 2023
10 Jul 2023
21 Jul 2023
10 Jul 2023
15 Jul 2023
Amount
1.Providing New Bore well and Hand Pump Set at Keelmathur Burial Ground H/o Keelmathur Estimate Amount : 1.390 Lakhs
Geophysical investigation charges including preparation of Geo physical survery report etc, completed.
Drilling of 150mm Dia Borewell in Hardrock area including development charges and labour chargesetc complete.
From 0 upto 150m
From 151m upto 180m
From 181m upto 210m
From 211m upto 240m
Supply and delivery of ISI marked 150mm OD PVC 6KSC casing pipes
Supply and fixing of 180mm Bore cover
Supply and delivery of India mark II deep well hand pump set with 30m (10nos x 3m) connecting rods with telescopic stand and cylinder assembly etc,. Completed
Raiser pipe B class 32mm GI pipe (3m long) with out coupling
32mm GI Heavy coupling
Conveyance of Hand pump set to the site including loading and unloading charges.
Hand pump erection charges
Construction of platform allround the hand pump including EW for installation of deep well hand pumps with lead off drain in PCC 1:2:4 s per type design.
Construction of soak pit as per type design
Provision for writing Name board
2.Construction of Compound Wall at Keelmathur Burial Ground H/o Keelmathur Estimate Amount : 3.570 Lakhs
Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete
Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
Column upto GL
Column
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. .
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Provision for writing Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Indira Construction
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .