Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 CrAccepted-AOC | ₹6.6 Cr Quoted ₹7.0 Cr | L1 | Accepted-AOC Quoted less percentage |
| 2 | L2₹7.2 Cr+₹20.3 L (2.91%)Rejected-AOC | ₹7.2 Cr+₹20.3 L (2.91%) | L2 | Rejected-AOC Quoted above percentage |
Tender Value
₹6.6 Cr
EMD Value
₹3.4 L
Closing Date
30 Jun 2020, 3:00 pmClosed
SE H C and M Salem
O/o the Superintending Engineer (Highways), Construction and Maintenance, Salem Circle
Improvements to Riding Quality to Government Roads including Construction Works and Upkeeping for a period of 60 months in Attur (H) Sub Division (Package-10)
2020_HWAY_165558_1
TN.1/2020-21/HDO, Dt.22.05.2020-10
Open Tender
Civil Works - Roads
Percentage
180 days
Salem
Refer tender document
3 documents required · 3 mandatory
₹0
₹3.4 L
13 Oct 2020
30 May 2020
2 Jul 2020
30 May 2020
30 Jun 2020
10 Jun 2020
3 Jun 2020 - 9 Jun 2020
eProcurement System Government of Tamil Nadu Created By: Sumathy D Created Date/Time: 10-Jul-2020 03:18 PM Tender Title: Salem Package 10 Tender ID: 2020_HWAY_165558_1
Tender Inviting Authority: Superintending Engineer Highways Construction and Maintenance Salem Circle
Name of work : Improvements to Riding Quality to Government Roads including Construction Works and Upkeeping for a period of 60 months in Attur (H) C&M Sub Division (Package-10) The Following works are involved in this package 1.Improvements to Riding Quality at km 50/350 - 51/0 of Salem - Ulundurpet road (SH 55) including upkeeping for a period of 60 months -01-CRIDP-20-21-I- 5709 2.Improvements to Riding Quality at km 77/0 - 79/0 of Musiri - Thuraiyur - Athur Road (SH 30) including upkeeping for a period of 60 months -01-CRIDP-20-21-I-5713 3.Improvements to Riding Quality at km 79/0 - 81/0 of Musiri - Thuraiyur - Athur Road (SH 30) including upkeeping for a period of 60 months-01-CRIDP-20-21-I -5714 4. Improvements to Riding Quality at km 0/0 - 1/6 of Kallanatham - Settlement colony Road including upkeeping for a period of 60 months-01-CRIDP-20-21-I-5735 5. Construction of Retaining wall at km 5/2, 5/4 of Paithur - Kanavaikadu Road -01-CRIDP-20-21-O- 3448 6. Construction of Retaining wall at km 4/6, 6/6, 6/8 of Pothakattupudur - Rasinagar Road -01-CRIDP-20-21-O-3443 7. Construction of Retaining wall at km 1/10, 2/4, 2/6, 3/2, 3/4 of Palaniyapuri Road -01-CRIDP-20-21-O-3444 8. Construction of Retaining wall at km 5/8, 6/8 of Kalpaganur - Reddikuttai Road -01-CRIDP-20-21-O-3445 9. Construction of Retaining wall at km 7/2, 7/8 of Keeripatty - Seeliyampatty Road -01-CRIDP-20-21-O-3446 10.Construction of Retaining wall at Km 1/10 - 2/8 of Thidavorr - Thammamatty Road (M455)-01-CRIDP-20-21-M- 1695 11. Construction of Retaining wall at Km 7/8 of Thidavorr - Thammamatty Road (M455) -01-CRIDP-20-21-M-1696
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 SRI AMMAN ASSOCIATES 59319903.900 8.000 71753356.000 Seven Crore Seventeen Lakh Fifty Three Thousand Three Hundred and Fifty Six
2.00 VMI Constructions 59319903.900 4.950 69726988.000 Six Crore Ninty Seven Lakh Twenty Six Thousand Nine Hundred and Eighty Eight
Lowest Amount Quoted BY: VMI Constructions(69726988.000)
BOQ Summary Details Tender Title: Salem Package 10 Tender ID: 2020_HWAY_165558_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 VMI Constructions 69726988.000 L1
2 SRI AMMAN ASSOCIATES 71753356.000 L2
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .