| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 LAccepted-Finance 146 4 NEW PRABHAT NAGAR JAIL CHUNGI MEERUT | L1 | Accepted-Finance Qualified | |
| 2 | L2₹1.5 L+₹48,320 (48.2%)Accepted-Finance | L2 | Accepted-Finance Qualified | |
| 3 | Rejected-Technical | - | Rejected-Technical Due to proper document not uploaded |
Tender Value
₹1.9 L
EMD Value
₹2,000
Closing Date
20 Dec 2021, 12:00 pmClosed
SE EUDC-3 GZB
SE EUDC 3 GANDHI NAGAR GZB
work of Shifting of 11 kv Line over the house of Sikrod village in the Area of EE, EUDD-VII, GZB. Under the jurisdiction of SE, EUDC-III, GZB.
2021_PVVNL_656023_1
18/W/2021-22/EUDD-7/EUDC-3 GZB
Open Tender
Electrical Works
Item Rate
90 days
SE EUDC 3 GANDHI NAGAR GZB
plz refer Tender doc
2 documents required · 2 mandatory
₹1,180
SE EUDC-3 GZB
₹2,000
23 Dec 2021
13 Dec 2021
20 Dec 2021
13 Dec 2021
20 Dec 2021
13 Dec 2021
Amount
Carriage of ST Pole 11 Mtr long from store center to Work site/JE Store gzb. Loading and unloading both side.
Carriage of XLPE Cable for 11 kv 1x70 Sq mm line from store center to Work site/JE store gzb. Loading and unloading both side.
Carriage of ACSR Weasel Conductor from store center to Work site/JE Store gzb. Loading and unloading both side.
Carriage of Line Material and other Accessories. from store center to Work site/JE Store gzb. Loading and unloading both side.
Dismantling of old 11 kv Line from Work site and Safely carriage to JE Store/Store Center gzb. Loading and unloading both side.
Erection of ST pole 11 mtr long.
Concreating of ST pole 11 Mtr long.
Providing and Earthing of ST Pole 11 Mtr long. Complete in all respect as per RESPO norms.
Laying Lifting and sagging of ACSR Weasel conductor complete in all respect as per respo.
Fixing of 11 kv Cross Arms.
Fixing of 11 kv Pin Insulator with Pin.
Fixing of Disc Insulator with Fitting.
Laying Lifting and sagging of 11kv XLPE Cable complete in all respect as per respo.
Fixing and Filling of Cable Jointing kit for 1x70 sq mm cable.
Providing and Fixing of Stay Complete.
Concreating of Stay.
Making of all HT/LT connections of 11kv line and restore the supply complete in all respect as per RESPO norms.
B. K. ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .