Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹83.2 L
EMD Value
₹1.7 L
Closing Date
3 Sept 2024, 10:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Minor Irrigation Department
T N Ramachandra
Package-4-SCP-Providing electrification to the borewells drilled in the lands of 1)Kenchamma W/O Bhairaiah in Bellavara village 2)Manjunatha S/O Bhadraiah in Chikkahasade village 3)Raja S/O Hucchaiah in Chikkahasade village 4)Eeragamma W/O Eeragaiah in Doddasalavara village 5)Lokesha S/O Eeraiah in Nalike village 6)Jayanna S/O Annappa in Nandagodanahalli village 7)Chandrashekhara S/O Sannakumaraiah in Murehalli village 8)1) Suresha S/O Kumara joint 2) Naagesha S/O Kumara in Nalike village 9)Julaiah S/O Channaiah in Sulagalale village 10)Huvamma W/O siddaiah in Sulagalale village 11)Rangappa S/O Gojagondaiah in Sulagalale village 12)Mallikarjuna S/O Nirvanaiah in Arehalli village 13)Huvamma W/O Bhairaiah in Arehalli village 14)Angadibhairappa S/O Siddhaiah in Arehalli village 15)Hucchamma W/O Laali Hucchaiah in Arehalli village 16)Kumara S/O Veerabhadraiah in Arehalli village 17)Doddaiah S/O Dyavaiah in Baalaguli village 18)Eeraiah S/O Late Basavaiah in Ankihalli village 19)Naagamma W/O Late Javaraiah in Ankihalli village 20)Eeraiah S/O Eeraiah in Mallapura village 21)Rudraiah S/O Bhairaiah in Mallapura village 22)Chikkamma W/O Shivappa in Mallapura village, Belur Taluk , Hassan District
MI/2024-25/EL/WORK_INDENT2425
MI/2024-25/EL/WORK_INDENT2425
Open
Electrical
Two Tender Document System(Two Cover)
Minor Irrigation Division Hassan
8 documents required · 8 mandatory
Satisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
List of Financial Resources with Certificates
ITT 3.2(c) To qualify for award of this contract each tenderer in its name should Execute in any one year (for a continuous period of 12 months) the minimum quantities of work (usually 80% of annual requirement) for works costing up to Rs.100.00lakhs. 1) 11kv line using Rabbit ACSR Conductor: 59.00 km 2) Errection of 25 kVA, 11kv Transformer : 23 Nos 3) Erection of 9/8 Mts Long RCC/PSCC Poles : 503 Nos 4) Providing Guy Sets: 240 set
ITT (3.2(b) To qualify for award of this contract , Mandating satisfactory completion as a prime contractor, at least one similar nature of work as providing Electrification of 11kv line using Rabbit ACSR conductor AND Errection of 25 kVA, 11kv Transformer (in the last five years periodi.e.,2019-20, 2020-21, 2021-22, 2022-23 and 2023-24) to an extent of 50% of the costof the work for all works costing up toRs.41.70 Lakhs.
IIT 3.2(a) To qualify for award of this contracteach tenderer in his name should have in thelast five years period (i.e., 2019-20,2020-21, 2021-22, 2022-23 and 2023-24) achieved inat least two financial years an average annual financial turnover of Rs.83.30 Lakhs(in all classes of civil engineeringconstruction works only)
IIT 3.3(b)liquid assets and /or availability ofcredit facilities of not less than Rs.25.00 Lakhs (Credit lines/ letter of credit/ certifcates from banks for meeting the fundrequirement etc. (usually 30% of the amount of contract) for works costing up toRs.100.00 lakhs
Class 1 & Above Electrical Registration Certifcate
Valid GST, ESI & EPF certifcate
List of existing commitments and ongoing works
List of works for which tenders already submitted
Contractor shall have one Graduate Engineer with 5 years Experience for work Supervision
₹2,090
₹1.7 L
26 Aug 2024
26 Aug 2024
4 Sept 2024
2 Sept 2024
Package-4-SCP-Providing electrification to the borewells drilled in the lands of 22 Benificiaries of Belur Taluk , Hassan District
RCC Pole 9 mtr long 145 KG WL-Material cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work.
RCC Pole 9 mtr long 145 KG WL-Labour Charge ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work.
Loading and unloading of Pole (loading of Pole to vehicles at stores and unloading at workspot) NOTE:- Consolidated amount for both loading and unloading.-9 Mtr RCC/PSCC Pole ---- etc., complete with ...
Transporation by Head Load where ever there is no accessability for transporation by vechicle-25 to 105 Mtr ---- etc., complete with all leads and lifts as per standard specifications and directions o...
PSCC Pole 9 mtr long 200 Kg WL-Material cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work.
PSCC Pole 9 mtr long 200 Kg WL -Labour Charge ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work.
Loading and unloading of Pole (loading of Pole to vehicles at stores and unloading at workspot) NOTE:- Consolidated amount for both loading and unloading.-9 Mtr RCC/PSCC Pole ---- etc., complete with ...
Transporation by Head Load where ever there is no accessability for transporation by vechicle-25 to 105 Mtr ---- etc., complete with all leads and lifts as per standard specifications and directions o...
Spiral earth electrode-Material cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work.
Providing Spiral Earth Electrode type earthing (without charcoal, salt etc.,)-Labour cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-...
11 kV, Horizontal Cross Arm with HT Single Top supports, clamps, bolts, nuts & washers - MS-For RCC Pole -Material cost ---- etc., complete with all leads and lifts as per standard specifications and ...
11 kV, Horizontal Cross Arm with HT Single Top supports, clamps, bolts, nuts & washers - MS-For RCC Pole-Labour charges ---- etc., complete with all leads and lifts as per standard specifications and ...
11 kV, 45 kN Polymeric Insulator-Material cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work.
11 kV, 5 kN Composite/Polymeric Pin Insulator (24 mm dia FRP Rod) -Material cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of...
Guy set with No. 15 Strain Insulator & Concreting materials as per Dwg No. BESCOM/GM/CP/7 Dt: 24.10.07-
Material cost ---- etc., complete with all leads and lifts as per standard specifications and di...
Guy set with No. 15 Strain Insulator & Concreting materials as per Dwg No. BESCOM/GM/CP/7 Dt: 24.10.07-Labour charges ---- etc., complete with all leads and lifts as per standard specifications and di...
ACSR Conductor as per IS-398 (Part - 2/1996) -Rabbit ACSR(6/3.35 mm Al + 1/3.35 mm St), Std Wt: 214 Kg/KM -Material cost ---- etc., complete with all leads and lifts as per standard specifications and...
Stringing of conductor Rabbit ACSR binding of conductor on each insulator and dead ending on strain or disc/strain insulator by means of clamps.-Labour Charges (Per Km Per Wire) ---- etc., complete wi...
PG Clamp - Rabbit to Rabbit-Material cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work.
Erection of 3 Phase, 11kV/433V,25 kVA BEE-4/5 Star Rated Distribution Transformer Centre using 9 mtr RCC Pole DPTC-i) Using 4 star Rated Transformer-Material Charges ---- etc., complete with all leads...
Erection of 3 Phase, 11kV/433V,25 kVA BEE-4/5 Star Rated Distribution Transformer Centre using 9 mtr RCC Pole DPTC-i) Using 4 star Rated Transformer-Labour charges ---- etc., complete with all leads a...
Loading & Unloading of Transformer - 25 kVA- Loading ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work.
Loading & Unloading of Transformer - 25 kVA- Un loading ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work.
Transporation by Head Load where ever there is no accessability for transporation by vechicle -Distribution Transformer 25 kVA-25 to 105 Mtr (Per Transformer) ---- etc., complete with all leads and li...
RCC Pole - 8 M Long, 115 Kg WL -Material cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work.
RCC Pole 8 mtr long,115 kg WL -Labour cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work.
Loading and unloading of Pole (loading of Pole to vehicles at stores and unloading at workspot) NOTE:- Consolidated amount for both loading and unloading.-8 Mtr RCC/PSCC Pole ---- etc., complete with ...
Transporation by Head Load where ever there is no accessability for transporation by vechicle-25 to 105 Mtr ---- etc., complete with all leads and lifts as per standard specifications and directions o...
PSCC Pole - 8 M Long 200 Kg WL -Material cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work.
PSCC Pole 8 mtr long 200 KG WL -Labour cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work.
Loading and unloading of Pole (loading of Pole to vehicles at stores and unloading at workspot) NOTE:- Consolidated amount for both loading and unloading.-8 Mtr RCC/PSCC Pole ---- etc., complete with ...
Transporation by Head Load where ever there is no accessability for transporation by vechicle-25 to 105 Mtr ---- etc., complete with all leads and lifts as per standard specifications and directions o...
LT 4 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MS-For RCC Pole- Material cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Eng...
LT 4 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MS-For RCC Pole- Labour cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engine...
1.1 kV Ceramic Pin Insulator With GI pin -Material cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work.
No. 8 Strain insulator-Material cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work.
Guy set with No. 8 Strain Insulator & Concreting materials as per Dwg No. BESCOM/GM/CP/7 Dt: 24.10.07-
Material cost ---- etc., complete with all leads and lifts as per standard specifications and dir...
Guy set with No. 8 Strain Insulator & Concreting materials as per Dwg No. BESCOM/GM/CP/7 Dt: 24.10.07-Labour charges ---- etc., complete with all leads and lifts as per standard specifications and dir...
ACSR Conductor as per IS-398 (Part - 2/1996)-Rabbit ACSR(6/3.35 mm Al + 1/3.35 mm St), Std Wt: 214 Kg/KM -Material cost ---- etc., complete with all leads and lifts as per standard specifications and ...
Stringing of conductor Rabbit ACSR binding of conductor on each insulator and dead ending on strain or disc/strain insulator by means of clamps.-Labour Charges (Per Km Per Wire) ---- etc., complete wi...
Supervision Charges over the Estimated Cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work.
Estimate Supervision Charges ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work.
Transformer Inspection Charges ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work.
D11- LT AC 3 Phase 4 Wire, 5-30 Amps DLMS Complaint Energy Meter, 1.0 Accuracy Class (Used for LT-2, LT-3 & LT-5 Installations up to 25HP/18KW) ---- etc., complete with all leads and lifts as per stan...
Security Deposit-LT-4(a)-Applicable to IP-Sets upto and inclusive of 10HP-Rs.1480.00/HP (Per HP) ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engin...
Electrical Inspectrate Charges Scale of Inspection Fees of Electrical Inspector Rate Schedules: Fees for Initial inspections. ---- etc., complete with all leads and lifts as per standard specification...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bar charteLE-4 2425.xls
Tender Document • 0.31 MB
FD 611 exp 12 2023.pdf
Others - FD 611 exp 12 2023 • 1.26 MB
royalty (1).pdf
Others - royalty • 12.37 MB
labour.docx
Others - labour • 0.98 MB
government notification bc loc letter to be issued by the bank (1).pdf
Others - government notification bc • 1.72 MB
_kw-3_bid document 2424.doc
Tender Document • 1.99 MB
e_payment.doc
Others - e payment • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .