| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAccepted-AOC AT BONGA ITKHORI CHATRA | CHATRA | JHARKHAND | 825103 | ₹2.4 L Quoted ₹2.0 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹2.1 L+₹7,573.22 (3.70%)Rejected-Finance SHANTINAGAR SHIVNANDANPUR BISHRAMPUR BISHRAMPUR SURGUJA CHHATTISGARH 497226 | SURAJPUR | CHHATTISGARH | 497226 | ₹2.1 L+₹7,573.22 (3.70%) | L2 | Rejected-Finance Not Being L1 |
| 3 | L3₹2.2 L+₹13,383.45 (6.54%)Rejected-Finance | ₹2.2 L+₹13,383.45 (6.54%) | L3 | Rejected-Finance Not Being L1 |
| 4 | L4₹2.3 L+₹24,141.34 (11.8%)Rejected-Finance GURUDWARA COMPLEX MAIN ROAD BISHRAMPUR PO BISHRAMPUR DISTT SURAJPUR C G | ₹2.3 L+₹24,141.34 (11.8%) | L4 | Rejected-Finance Not Being L1 |
| 5 | L5₹2.3 L+₹25,998.92 (12.7%)Rejected-Finance | ₹2.3 L+₹25,998.92 (12.7%) | L5 | Rejected-Finance Not Being L1 |
Tender Value
₹4.5 L
EMD Value
₹5,700
Closing Date
8 Nov 2023, 5:00 pmClosed
Staff Officer (C)
Staff Officer (C)SECL G.M. Office Bishrampur Area
Diversion of drain behind Air shaft of Gayatri UG Mine of RGK Sub Area.
2023_SECL_292203_1
GM/BSPR/Civil/e-tender/ 2023-24/25 Dt.28.10.2023
Open Tender
Civil Works - Others
Item Rate
30 days
RGK Sub Area
AS Per NIT
3 documents required · 3 mandatory
₹5,700
23 May 2024
30 Oct 2023
10 Nov 2023
30 Oct 2023
8 Nov 2023
31 Oct 2023
30 Oct 2023 - 4 Nov 2023
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III): 8 graded stone aggregate 40 mm nominal size)
Providing and laying in position reinforced cement concrete specified grade of , excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 5.2.2 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. Thermo-Mechanically Treated bars.
Centering and shuttering including strutting, propping etc. and removal of form for :Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
6 mm cement plaster of mix : 1:3 (1 cement: 3 fine sand).
Neat cement punning
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
Total impact of GST for the purpose of CTC
Tapan Kumar Biswas
ADITYA CONSTRUCTION
IRFAN HAIDER
RAKESH ASSOCIATES
SANTOSH KUMAR SINGH
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_302675.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .