Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.5 LAdmitted-Finance SANTINEKATAN ROAD BOLPUR | BOLPUR | ₹17.5 L | L1 | Admitted-Finance |
| 2 | L2₹18.0 L+₹50,287.50 (2.87%)Admitted-Finance 00 DEY ENTERPRISE SODEPUR 9 10 PITS COLLIERY ASANSOL BARDHAMAN WEST BENGAL 713372 | PASCHIM BARDHAMAN | WEST BENGAL | 713372 | ₹18.0 L+₹50,287.50 (2.87%) | L2 | Admitted-Finance |
| 3 | L3₹18.1 L+₹51,260 (2.92%)Admitted-Finance ALAMPUR NODAKHALI | ₹18.1 L+₹51,260 (2.92%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SINHA ELECTRICALS L1 | DEY ENTERPRISE L2 | S. P. CONSTRUCTION L3 |
|---|---|---|---|---|---|---|
| 1.00Labour charges for 1 [one] No operating personnel for operation and guarding of Pump / Valve / Disinfection arrangement with all accessories. W.E.F 01.10.2026 to 30.09.2027 | ||||||
| 1.01 | Krishnarampur, PH-2 | 365 | Days | 684 ₹2,49,660 Lowest | 703.5 ₹2,56,777.5 | 704 ₹2,56,960 |
| 1.02 | Bakeswar PH-1 | 365 | Days | 684 ₹2,49,660 Lowest | 703.5 ₹2,56,777.5 | 704 ₹2,56,960 |
| 1.03 | Bhandaria PH-2 | 365 | Days | 684 ₹2,49,660 Lowest | 703.5 ₹2,56,777.5 | 704 ₹2,56,960 |
| 1.04 | Julpia PH-1 | 365 | Days | 684 ₹2,49,660 Lowest | 703.5 ₹2,56,777.5 | 704 ₹2,56,960 |
| 1.05 | Alipore PH-1 | 365 | Days | 684 ₹2,49,660 Lowest | 703.5 ₹2,56,777.5 | 704 ₹2,56,960 |
| 2.00PART-B Supervision charges for whole electrical installation by licensed electrician as per IE Rules 1956 read with latest amendments overhead expenditures. | ||||||
| 2.01 | Krishnarampur, PH-2 | 12 | Months | 8,435 ₹1,01,220 Lowest | 8,680 ₹1,04,160 | 8,681 ₹1,04,172 |
| 2.02 | Bakeswar PH-1 | 12 | Months | 8,435 ₹1,01,220 Lowest | 8,680 ₹1,04,160 | 8,681 ₹1,04,172 |
| 2.03 | Bhandaria PH-2 | 12 | Months | 8,435 ₹1,01,220 Lowest | 8,680 ₹1,04,160 | 8,681 ₹1,04,172 |
Tender Value
Refer Docs
EMD Value
₹37,000
Closing Date
21 Aug 2026, 2:00 pmClosed
Executive Engineer SMD PHE Dte
Chetla
Operation and guarding of the electric operated auto/ manual control pumping machinery at Krishnarampur, Bakeswar, Bhandaria, Julpia and Alipore water supply scheme of Bishnupur-I Block under South 24pgs Mechanical Division, PHE Dte.
2026_PHED_1034654_2
WBPHE/EE/SMD/NIeT-14 of 2026-27
Open Tender
Electrical Work/ Equipment
Item Rate
365 days
Bishnupur-I Block
Please refer Tender documents.
6 documents required · 6 mandatory
₹37,000
31 Aug 2026
28 Jul 2026
24 Aug 2026
28 Jul 2026
21 Aug 2026
28 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Labour charges for 1 [one] No operating personnel for operation and guarding of Pump / Valve / Disinfection arrangement with all accessories. W.E.F 01.10.2026 to 30.09.2027 | |||||
| 1.01 | Krishnarampur, PH-2 | - | Days | - | - |
| 1.02 | Bakeswar PH-1 | - | Days | - | - |
| 1.03 | Bhandaria PH-2 | - | Days | - | - |
| 1.04 | Julpia PH-1 | - | Days | - | - |
| 1.05 | Alipore PH-1 | - | Days | - | - |
| 2PART-B Supervision charges for whole electrical installation by licensed electrician as per IE Rules 1956 read with latest amendments overhead expenditures. | |||||
| 2.01 | Krishnarampur, PH-2 | - | Months | - | - |
| 2.02 | Bakeswar PH-1 | - | Months | - | - |
| 2.03 | Bhandaria PH-2 | - | Months | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
Tendernotice_2.pdf
PDF • 0.23 MB
Tendernotice_3.pdf
PDF • 0.25 MB
BOQ_2541380.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .