Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical NEWADA PATHARA PRAYAGRAJ | PRAYAGRAJ | PRAYAGRAJ | Accepted-Technical ok |
| 2 | Accepted-Technical | Accepted-Technical ok |
| 3 | Accepted-Technical | Accepted-Technical ok |
Tender Value
₹74.1 L
EMD Value
₹6.3 L
Closing Date
29 May 2026, 12:00 pmClosed
Executive Officer
Nagar Panchayat Bidhuna
Bhoomi No. 798 and 799 m Mohalla Kishorgangj mai Feedar Road pr Commercial Complex work
2026_DOLBU_1148235_2
Letter 173/NPB/2026 Dated 11.05.2026
Open Tender
Civil Works
Lump-sum
BIDHUNA
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,406
Executive Officer
₹6.3 L
30 May 2026
15 May 2026
29 May 2026
15 May 2026
29 May 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil loam clay or sand including lift upto 1.5 m. (5fts) and lead upto 30 m. (100 fts)& including filling, watering and ramming of excavated earth into the trenches or into the space between the building & sides of foundation trenches | 1,459.5 | Cum | 145 | ₹2,11,627.5 |
| 2 | Earthwork in embankment mechanially compacted upto 95% proctor density including cartage of earth upto 3.0 Km. (PWD Sch No. 253b+Cartage) | 1,459.5 | Cum | 316.2 | ₹4,61,493.9 |
| 3 | Providing & Laying in Cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded stone ballast with 40 mm. (nominal size) including supply of all materials, labour and T&P etc. required for proper completion of the work. And curing complete also including cost of formwork in foundation and floor. | 41.81 | Cum | 6,000 | ₹2,50,860 |
| 4 | R.C.C. work with cement approved coarse sand and 2 cm. guage approved stone grit in the proportion of 1:1.5:3 in Foundation/Column excluding its fixing and binding wire and including neccesary centaring and shuttering Including supply of all material, labour, T&P etc. Required for proper completion of the work | 54.93 | Cum | 8,800 | ₹4,83,384 |
| 5 | R.C.C. work with cement approved coarse sand and 2 cm. guage approved stone grit in the proportion of 1:1.5:3 in PLINTH /SLAB BEAM excluding its fixing and binding wire and including neccesary centaring and shuttering Including supply of all material, labour, T&P etc. Required for proper completion of the work | 18.73 | Cum | 8,400 | ₹1,57,332 |
| 6 | R.C.C. work with cement approved coarse sand and 2 cm. guage approved stone grit in the proportion of 1:2:4 in Slab excluding its fixing and binding wire and including neccesary centaring and shuttering Including supply of all material, labour, T&P etc. Required for proper completion of the work | 15.47 | Sqm | 8,100 | ₹1,25,307 |
| 7 | Mild steel or iron - Fe-500D or more in plain work such as reinforced concrete or reinforced brick work as neccesary including bending for proper completion of the work and including supply of steel | 111.72 | QTLS | 7,050 | ₹7,87,626 |
| 8 | Brick work with 1:4 cement and coarse sand mortor in Super structure (PWD Sch No. 305a+309) | 190.47 | sqm | 6,670 | ₹12,70,434.9 |
| 9 | 12mm thk plaster with 1:4 cement & coarse sand mortor. | 1,410.66 | Cum | 200 | ₹2,82,132 |
| 10 | Finishing walls with two coat of acrylic smooth exterior paints of best quality including supply of all materials, labours, T&P etc all complete. | 1,410.66 | SQM | 69 | ₹97,335.54 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.72 MB
BOQ_2150251.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .