Loading…
Loading…
Tender Value
₹24.1 L
EMD Value
₹48,300
Closing Date
20 Jun 2026, 3:00 pm
Exe. Eng. Minor Irrigation Division, Latehar
Exe. Eng. Minor Irrigation Division, Latehar
Renovation of Kena MI Scheme Block Latehar , Distt- Latehar
2026_WRD_114679_1
WRD/MID/Latehar/F2-02/2026-27 (3rd Call) DT 29-05-26
Open Tender
Civil Works
335 days
Block Latehar Distt. Lathear
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹48,300
3 Jun 2026
3 Jun 2026
22 Jun 2026
3 Jun 2026
20 Jun 2026
3 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Jungle clearance in borrow area , building premises,flanks and slopes of the roads,canals and embankments by removing the grass and the jungle bushes from top including weeding out shrubs,roots and levelling etc. complete as per direction of E/I.(Part - B-5.1.3.1,Patr - A-2.02) | - | Ha | 19,760.3 | - |
| 2 | E/w in stripping by hydraulic M/C in grade A & B type of soil including morroum soil, soil mixed with kankar, pebbles,boulders upto 300 mm size and disposal of the same along with all organic materials in the country side beyond 150 M upto 500 M in all by tipper including construction & maintenance of haul road etc. complete as per specification and direction of E/I.(5.1.6.1) | 288.19 | M3 | 88.35 | ₹25,461.41 |
| 3 | Earthwork in excavation and filling of canal by the hydraulic excavator as per designed section in all kinds of soil, soil mixed with kankar, pebbles and boulders upto 300 mm size and disposal of spoil upto 10 m with all lifts all complete as per s[ecification and direction of E/I. ( 7.1.43.1) | 1,471.5 | M3 | 50.53 | ₹74,354.9 |
| 4 | E/W in excavation in canal by the hydraulic excavator as per designed section in all kinds of soil, soil mixed with kankar, pebbles and boulders upto 300 mm size and disposal of spoil upto 500 m with all lifts by tipper including construction and maintenance of haul road all complete as per specification and direction of E/I. ( 7.1.43.2) | 2,207.25 | M3 | 105.09 | ₹2,31,959.9 |
| 5 | Extra for earth work in marshy, slushy and daldal soil (vide classification of soil item - F) all complete as per specification and direction of E/I. ( 7.1.11) | 367.88 | M3 | 28.64 | ₹10,536.08 |
| 6 | Use rate of 10 H.P. Diesel Pumpset including diesel, mobil, Operator etc all complete.(PM-29) | 100 | Hrs. | 344.85 | ₹34,485 |
| 7 | Supplying and laying sand filter on slope of the dam as per design, drawing, with watering and compaction including the cost of materials, royalty and all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I. (5.6.5) | 132 | M3 | 1,415.17 | ₹1,86,802.44 |
| 8 | Supplying and laying Stone metal (20mm to 63mm) on the slope of dam -do- as per specification and direction of E/I. (WRD 5.6.7 ) | 125.4 | M3 | 2,103.59 | ₹2,63,790.19 |
| 9 | Supplying and laying (properly as per design and drawing) rip -rap with good quality of boulder duly packed including the cost of materials, royalty all taxes etc. but excluding the cost of carriage as per specification and direction of E/I. (5.6.8) | 1 | M3 | 1,756.4 | ₹1,754.64 |
| 10 | Supplying and laying boulders in rock toe, heel trenches of the dam as per design, drawing including the cost of materials, royalty and all taxes etc. but excluding the cost of carriage all complete as per specificatins and direction of E/I.(Item No.5.6.4) | 36.48 | M3 | 1,491.06 | ₹54,393.87 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
BOQ_155060.xls
BOQ • 0.32 MB
tenderdocuments.pdf
Tender Documents • 1.25 MB
Download all tender documents and submit your bid