Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
13 Dec 2021, 2:00 pmClosed
SE ETC Gonda
Jail Road Gonda
Work
2021_UPTCL_653067_1
54/ETC(GD)/2021-22
Open Tender
Electrical Works
Fixed-rate
90 days
Nanpara
Please refer Tender documents.
3 documents required · 3 mandatory
₹236
EE ETD
₹2,000
15 Dec 2021
8 Dec 2021
13 Dec 2021
8 Dec 2021
13 Dec 2021
8 Dec 2021
Safe Loading, unloading & carriage of old & used 33 KV C&R Panel from 132 KV Sub-Station, Nawabganj under ETD Gonda to 132 KV Sub-Station, Nanpara distance approx. 120 KM
Following dismantling & shifting work has to be carried out at 132 KV Sub-Station, Nanpara.
Dismantling of defective 33 KV VCB of 33 KV Capacitor Bank-II including opening of cable termination, opening of jumpers, cutting of earthing etc. & shifting to store of 132 KV Sub-Station, Nanpara as per instruction of supervising engineer.
Dismantling of 33 KV 03 No. CT of 33 KV Capacitor Bank-II including opening of cable termination, opening of jumpers etc. & shifting to store of 132 KV Sub-Station, Nanpara as per instruction of supervising engineer.
Dismantling of damaged C&R Panel of of 33 KV Capacitor Bank-II including opening of cable termination, cutting of earthing etc. & shifting of dismantled panel to store of 132 KV Sub-Station, Nanpara as per instruction of supervising engineer.
Following shifting & erection work has to be carried out at 132 KV Sub-Station, Nanpara.
Shifting & erection of 33 KV VCB of 33 KV Capacitor Bank-II including cable termination, both side jumpering, modification of structure of new VCB, earthing of equipment, structure etc.
Shifting & erection of 33 KV 03 No. CT of 33 KV Capacitor Bank-II including cable termination, both side jumpering, earthing etc.
Shifting & erection of 33 KV Control Relay Panel of capacitor Bank-II including cable termination, both side jumpering, earthing etc.
Replacement of cell, post insulator required if any. Work should be completed after checking of protection of capacitor bank-II unit from remote as well as local in front of T&C team till satisfaction.
M/s ANMOL CATTERS
M/S G.K.TRADERS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .