| Sl No | Description | Qty | Unit | R.BABU L1 | DCB INFRA L2 |
|---|---|---|---|---|---|
| 1.00Improvements and maintenance of the Road MRL37-MCB Road to Singadivakkam Via Siruvedal Km 0/0 - 2/000 & 3/000 -4/260 Construction Cost Rs.194.82 lakhs Maintenance Cost Rs.13.04 lakhs | |||||
| 2.00Clearing and Grubing Road Land Clearing and grubbing road land including uprooting wild vegetation, ,bushes,shrubs,saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MORD Technical Specification Clause 201. | |||||
| 3.00 | KM 0/0 - 2/000 & 3/000 -4/260 | 5,868 | Sqm | 10.54 ₹61,848.72 Lowest | 12 ₹70,416 |
| 4.00Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | |||||
| 5.00 | KM 0/0 - 2/000 & 3/000 -4/260 | 4,052.74 | Sqm | 10.8 ₹43,769.59 Lowest | 12 ₹48,632.88 |
| 6.00Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 301.5 | |||||
| 7.00 | KM 0/0 - 2/000 & 3/000 -4/260 | 5,092.9 | Cum | 173.43 ₹8,83,261.65 Lowest | 175 ₹8,91,257.5 |
| 8.00Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structure graded and compacted to to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 301.5. (Gravel shoulder) | |||||
| 9.00 | KM 0/0 - 1/000 | 559.8 | Cum | 716.58 ₹4,01,141.48 Lowest | 720 ₹4,03,056 |
| 10.00 | KM 1/0 - 2/000 | 562.5 | Cum | 727.65 ₹4,09,303.12 Lowest | 730 ₹4,10,625 |
Tender Value
₹2.1 Cr
EMD Value
₹4.2 L
Closing Date
19 Jun 2024, 3:00 pmClosed
The Project Director, DRDA, Kancheepuram
O/o The Project Director, DRDA, Kancheepuram
Improvements and maintenance of the Road MRL37-MCB Road to Singadivakkam Via Siruvedal Km 0/0 - 2/000 and 3/000 -4/260 at Walajabad Panchayat Union Kanchipuram District (PKG No.TN01-150) Under PMGSY III Batch I - 2023-24
2024_RDTN_134022_1
TN1150
Open Tender
Civil Works - Roads
Item Rate
270 days
DRDA, Kancheepuram
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹4.2 L
O/o The Project Director, DRDA, Kancheepuram
3 Oct 2025
15 May 2024
19 Jun 2024
15 May 2024
19 Jun 2024
15 May 2024
29 May 2024
Amount
Improvements and maintenance of the Road MRL37-MCB Road to Singadivakkam Via Siruvedal Km 0/0 - 2/000 & 3/000 -4/260 Construction Cost Rs.194.82 lakhs Maintenance Cost Rs.13.04 lakhs
Clearing and Grubing Road Land Clearing and grubbing road land including uprooting wild vegetation, ,bushes,shrubs,saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MORD Technical Specification Clause 201.
Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 301.5
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structure graded and compacted to to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 301.5. (Gravel shoulder)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base course on a well prepared surface and compacting with vibratory roller to achieve the desired density
Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504.(BM with waste plastic)
Providing and applying Primer Coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85 kg/sqm using mechanical means as per MORD Technical Specification Clause 502
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.
Providing, laying and rolling of close-graded premix surfacing material of 25 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 (MSS with waste plastic)
Providing Rumble Strips covered with Premix Bituminous Caropet 20mm high at center,250mm vide placed at 1m center to center at approved locatioons to control speed marked with white strips of road marking paint.
Road Marking
Providing and fixing Name board
Providing and Fixing 'Logo' of PMGSY Project
Providing and Fixing 'Citizen information Board'
Providing and fixing of cautionary sign board 60 cm
Providing and fixing of Octogonal sign board curve
Providing and fixing of Circular sign board
Providing and fixing of Reflector near culvert and tree
Providing and fixing of Maintenance Board
KM Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703
(i) Ordinary Kilometer Stone (Precast) KM Stone
(ii) 200 m stone (precast) HM Stone
Construction of 1.50 m Span RCC Slab culvert. @ Ch.3/263, 4/240
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technica
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technica
Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202.
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Above Ch.3/263
Above Ch.4/240
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Below Ch.3/263
Below Ch.4/240
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kr
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Providing and fixing 6mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
DCB INFRA
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .