Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 CrAccepted-AOC AT WARD NO 30 PO DHANKAUDA P S SADAR DIST SAMBALPUR 768006 ODISHA | SAMBALPUR | SAMBALPUR | ODISHA | 768006 | L1 | Accepted-AOC AOC | |
| 2 | L1₹3.2 CrRejected-Finance AT MAHABIRPADIA PO PS BHAWANIPATNA DIST KALAHANDI | BHAWANIPATNA | KALAHANDI | ODISHA | L1 | Rejected-Finance NOT QUALIFIED IN LOTTERY SYSTEM | |
| 3 | L1₹3.2 CrRejected-Finance SAMBALPUR | ODISHA | L1 | Rejected-Finance NOT QUALIFIED IN LOTTERY SYSTEM | |
| 4 | L1₹3.2 CrRejected-Finance AT BUDHARAJA BIMAL HOTA GALI WARD NO 27 PO BUDHARAJA DIST SAMBALPUR ODISHA | SAMBALPUR | SAMBALPUR | ODISHA | L1 | Rejected-Finance NOT QUALIFIED IN LOTTERY SYSTEM | |
| 5 | L1₹3.2 CrRejected-Finance | L1 | Rejected-Finance NOT QUALIFIED IN LOTTERY SYSTEM |
Tender Value
₹3.2 Cr
EMD Value
₹3.2 L
Closing Date
7 Aug 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Circle Officer
RURAL WORKS CIRCLE , SAMBALPUR
Construction of H.L. bridge over Local Nallah on Kabribahal to Balijuri road
2026_CERWI_136626_1
Bridge Tender Online RWCSBP-14/2026-27
Open Tender
Civil Works - Bridges
Percentage
365 days
Kuchinda
2 documents required · 2 mandatory
₹10,000
₹3.2 L
Yes
13 Oct 2026
21 Jul 2026
10 Aug 2026
21 Jul 2026
7 Aug 2026
21 Jul 2026
21 Jul 2026 - 5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in cutting in hard soil within the initial lead and lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 mtr in depth etc complete as per the direction of the Enngineer in Charge. | 2,204.32 | cum | 235.74 | ₹5,19,646.4 |
| 2 | Earthwork in excavation in foundation in hard soil within the initial lead and lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 mtr in depth etc complete as per the direction of the Enngineer in Charge. | 1,385.69 | cum | 388.8 | ₹5,38,756.27 |
| 3 | Providing Plain Cement concrete (1:3:6) mix with crushed stone aggregate of 4cm nominal size mechanically mixed ,placed in foundation & below approach slab compacted by vibrator, providing groove & beads where necessary including curing, dewatering, shoring, shuttering if necessary at the time of laying concrete with cost, conveyance royality & taxes of all material required for the work including supplying & working pumps, T&P articles finishing the exposed surface smooth as per section 2100 of MoRT&H specifications for Road & Bridge works (5th Revision) and as per direction of the Engineer-in-Charge.
Foundation | 105.97 | cum | 6,862.88 | ₹7,27,259.39 |
| 4 | Providing and laying Plain cement concrete of grade M-15 in foundation , substructure of bridge works, drain & protection wall etc complete as per drawing and technical specification using High Strength approved quality Cement and coarse granite aggregate with formwork as per Section 900,1000,1500,1700, 2100 & 2200 of MORT&H specifications for Road and Bridge works of (5th Revision) as per direction of the Engineer-in-charge.
Foundation | 55.07 | cum | 6,448.43 | ₹3,55,115.04 |
| 5 | Upto Bed | 254.98 | cum | 6,590.46 | ₹16,80,435.49 |
| 6 | Providing RCC of grade M-30 in the following structures as per approved drawing and technical specifications as per Section 900, 1000, 1500, 1600, 1700, 2200, 2300 & 2700 of MoRT&H specifications for Road & Bridge works (5th Revision) and as per direction of the Engineer-in-Charge.
Abutment & Pier Shaft Foundation | 288.81 | cum | 9,850.18 | ₹28,44,830.49 |
| 7 | Abutment & Pier Shaft Above Bed | 308.17 | cum | 10,075.16 | ₹31,04,862.06 |
| 8 | Column / Wing Wall / Tie Beam | 4.88 | cum | 16,724.94 | ₹81,617.71 |
| 9 | Abutment & pier cap | 8.58 | cum | 9,772.9 | ₹83,851.48 |
| 10 | Dirt wall | 2.77 | cum | 13,097.79 | ₹36,280.88 |
stage.html
html • 0.12 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 4.47 MB
Tendernotice_1.pdf
PDF • 1.27 MB
BOQ_602552.xls
BOQ • 0.28 MB
3763.pdf
PDF • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .