Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.3 LAccepted-AOC | ₹11.3 L | L1 | Accepted-AOC due to l1 |
| 2 | L2₹11.4 LRejected-Finance | ₹11.4 L | L2 | Rejected-Finance due to l2 |
Tender Value
₹10.7 L
EMD Value
₹10,720
Closing Date
31 Dec 2025, 5:00 pmClosed
EXECUTIVE OFFICER
EXECUTIVE OFFICER CHAMBER VYASANAGAR MUNICIPALITY
Completion of community Centre in ward No- 18
2025_ORULB_123345_8
03/VNM/2025-26
Open Tender
Civil Works - Roads
Percentage
60 days
VYASANAGAR MUNICIPALITY
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹10,720
Yes
29 Jun 2026
18 Dec 2025
2 Jan 2026
18 Dec 2025
31 Dec 2025
18 Dec 2025
Supplying all labour, T&P and earth work in excavation in all kinds of soil within initial lead of 50m lead & initial lift of 1.50m, including rouck dressing breaking clods & laying in layers not exceeding 0.30m. In depth, loveling the bed, using pans, vessels for slushy soll & including sundries supervision charges & labour cess etc, as per the direction of Engineer-in-charge
Supplying all materials, labour, T&P and filling in foundation and plinth with sand well watered and rammed including conveyance of all materials to work site, payment of royalty. taxes contractor profit & labour cess etc all complete as per specification and direction of Engineer-in-charge.
Supplying all materials, labour, T&P and providing cement concrete (1:3:6) with 4cm size crusher broken black hard granile metal including watering, curing, conveyance of all materials to work site, payment of royalty taxes, contractor profit & labour cess etc all complete as per specification and direction of Engineer-in-charge
Supplying all material, labour, T&P and R.C.C. Work of M-25 Grade with 20mm and down grade black Crusher broken granite stone chips including hoisting and laying and including cost of all materials, taxes, conveyance of all materials to worksite, royalties of materials, contractor profit & labour cess etc all complete as per direction of Engineer-in-charge (Excluding cost of reinforcement But including cost of contering & shuttering)COLUMN BASE/FOOTING Pinth Band
Staircase
Landing
Column Superstructure/Beam
Lintel
Chhaja
Supplying all materials, labour, T&P and providing M.S. reinforcement for Reinforced cement concrete work including cutting, bending, binding and placing in position Including cost of binding wire 18 to 20 gauge, conveyance of all materials to worksite, payment of royalty, taxes, contractor profit & labour cess etc all complete as per specification and direction of the Engineer-in-charge. (Ref AR-2006,Item RCC work SI No.09,P-52)
Supplying all materials, labour, T&P and Providing Brick work with Fly Ash Bricks 25cm x 12cm x 8cm size having crushing strength not Less than 75kg/cm³ with dimensional tolerance ± 8 percent in Cement mortar in Cement Mortar (1:6) after immersing the bricks for hours in water before use including splays, cutting, circular moulding corbelling champhering and similar such type of works, scaffolding, watering curing the work including cost of conveyance & royalty, sundries & watering for curing & supervision charges, contractor profit & labour cess etc, all complete as per the direction of Engineer-in-charge.
Supplying all materials, labour, T&P and making 12mm thick cement plaster in cement mortar (1:6) for brick work including watering, curing, conveyance of all materials to worksite, payment of royalty, taxes contractor profit & labour cess as per the direction of engineer-in-charge.
Supplying all materials, labour, T&P and making 12mm thick cement plaster in cement mortar (1:6) for brick work including watering, curing, conveyance of all materials to worksite, payment of royalty, taxes contractor profit & labour cess as per the direction of engineer-in-charge.
Supplying all materials, Jabour, T&P and making 16mm thick cement plaster in cement mortar(1:6) for brick or stone masonry work for brick work including watering, curing, conveyance of all materials to worksite, payment of royalty, tases, contractor proflt & labour cess as per the direction of engineer in-charge.
Supplying all materials, labour, T&P and providing 6 mm thick cement plaster (1:4) to RCC surfaces finished smooth including closed deep chiping and slury treatment including watering, curing conveyance of all materials to work site, payment of royalty, taxes, contractor profit & labour cess etc all complete as per specification and direction of Engineer-in-charge
Supplying all materials, labour, T&P and fixing Ceramic Glazed tiles in dados, skirtting and risers of steps on 12mm thick bed of cement plaster (1:3) jointed with cement slurry mixed pigment to match the shades of the tiles including rubbing and polishing etc. Complete after providing a base plaster of 12mm thick in cement mortar (1:4) using tiles of size 20cmx20cm or 20cmx30cm including cost of tiles, conveyance, taxes, contractor profit Room Dado For First Floor
Supplying all materials, labour, T&P and fixing Ceramic floor tiles using tile 30cm x 30cm or 40cm x 40cm in floor treads or steps and landing on 25mm thick bed of cement mortar (1:1) jointed with neat cement slurry mixed with pigment to matching shades of the tiles including rubbing and polishing contractor profit & labour cess all complete as per direction of Engineer-in-Charge.
Supplying all material labour and T&P and fixing of MS door and windows including cost conveyance royalty and taxes etc complete.
Add Photo Graphy & Display Board
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
Tendernotice_2.pdf
PDF • 1.42 MB
BOQ_572019.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].