| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹63.9 LAccepted-AOC FLAT NO G 406 HANSA COURTYARD THIRUVOTTIYUR CHENNAI 600 019 | CHENNAI | TAMIL NADU | 600019 | ₹63.9 L Quoted ₹74.4 L | L1 | Accepted-AOC L1 Bidder AOC issued |
| 2 | L2₹75.6 LRejected-AOC | ₹75.6 L | L2 | Rejected-AOC L2 Bidder Rejected |
| Sl No | Description | Qty | Unit | Mani Engineering Works L2 | Gold Engineering Works L1 |
|---|---|---|---|---|---|
| 1.00 | I. Material Portion: ISMC 150x75 | 9.78 | MT | 69,000 ₹7,96,287.6 | 67,960 ₹7,84,285.58 |
| 2.00 | IM.S Plate 10 mm TK | 2.28 | MT | 91,800 ₹2,46,978.72 | 90,530 ₹2,43,561.91 |
| 3.00 | M.S Plate 5 mm TK | 6.93 | MT | 90,200 ₹7,37,601.48 | 88,850 ₹7,26,561.99 |
| 4.00 | ISA 50 x 50 x 6 | 1.59 | MT | 67,600 ₹1,26,831.12 | 66,560 ₹1,24,879.87 |
| 5.00 | II. Labour Portion: Dismantling of existing severely damaged / corroded technological structure for Conveyor-7, which involves cutting, leading and removal of damaged portion including crane, winch hire charges, T&P charges and consumables etc. | 10.29 | MT | 11,855 ₹1,43,945.78 | 11,700 ₹1,42,063.74 |
| 6.00 | Utilizing iron & steel structural materials lifting, loading, transporting and unloading in the work spot including all hire charges. | 20.58 | MT | 6,244 ₹1,51,631.79 | 6,160 ₹1,49,591.9 |
| 7.00 | Fabrication of technological structure for Conveyor-7 by marking, cutting & fabrication of column and supporting structures by utilizing iron & steel structural including crane, winch hire charges, consumables and T&P hire charges. | 20.58 | MT | 86,819 ₹21,08,347.32 | 85,550 ₹20,77,530.42 |
| 8.00 | Erection of technological structure for Conveyor-7 by leading, lifting, fixing, providing necessary scaffolding arrangement, including crane, winch hire charges consumables and T&P hire charges. | 20.58 | MT | 96,347 ₹23,39,729.09 | 94,930 ₹23,05,318.09 |
| 9.00 | Cleaning the surface with shot basting the structures of channel and plates including cost of shots, hire charges for compressor, scaffolding arrangements including consumables and T&P hire charges. | 830 | M² | 327 ₹3,20,263.8 | 323 ₹3,16,346.2 |
| 10.00 | Painting charges for three coats of paint with a total dry film thickness (DFT) of 190 to 225 Microns ie. Painting with one coat of zinc phosphate epoxy primer (60-70 microns), one coat of MIO epoxy undercoating (100-120 microns DFT) & one coat of aromatic poly urethane (30-35 microns DFT) including cost of Thinner, T&P’s and consumables | 830 | M² | 429 ₹4,20,162.6 | 424 ₹4,15,265.6 |
Tender Value
Refer Docs
EMD Value
₹61,000
Closing Date
4 Jul 2025, 2:00 pmClosed
CE/NCTPS-I
CE/NCTPS-I
TNPGCL NCTPS I SE M II Circle ICHS Dn Replacement of existing severely damaged corroded Technological Structure in conveyor 7 of ICHS
2025_EB_571553_1
CE/NCTPSI/SE/MII/SpNo43/25-26
Open Tender
Power/Energy Projects/Products
45 days
NCTPS-I Chennai
Refer the tender documents
3 documents required · 3 mandatory
₹0
₹61,000
Yes
17 Mar 2026
20 Jun 2025
5 Jul 2025
20 Jun 2025
4 Jul 2025
20 Jun 2025
Amount
I. Material Portion: ISMC 150x75
IM.S Plate 10 mm TK
M.S Plate 5 mm TK
ISA 50 x 50 x 6
II. Labour Portion: Dismantling of existing severely damaged / corroded technological structure for Conveyor-7, which involves cutting, leading and removal of damaged portion including crane, winch hire charges, T&P charges and consumables etc.
Utilizing iron & steel structural materials lifting, loading, transporting and unloading in the work spot including all hire charges.
Fabrication of technological structure for Conveyor-7 by marking, cutting & fabrication of column and supporting structures by utilizing iron & steel structural including crane, winch hire charges, consumables and T&P hire charges.
Erection of technological structure for Conveyor-7 by leading, lifting, fixing, providing necessary scaffolding arrangement, including crane, winch hire charges consumables and T&P hire charges.
Cleaning the surface with shot basting the structures of channel and plates including cost of shots, hire charges for compressor, scaffolding arrangements including consumables and T&P hire charges.
Painting charges for three coats of paint with a total dry film thickness (DFT) of 190 to 225 Microns ie. Painting with one coat of zinc phosphate epoxy primer (60-70 microns), one coat of MIO epoxy undercoating (100-120 microns DFT) & one coat of aromatic poly urethane (30-35 microns DFT) including cost of Thinner, T&P’s and consumables
Cost of paint for one coat of Zinc phosphate epoxy primer (60-70 microns DFT) in the structures of angle and plates.
Cost of paint for one coat of MIO epoxy (100-120 microns DFT) in the structures of angle and plates.
Cost of paint for one coat of aromatic poly urethane (30-35 microns DFT) with total DFT of 190 to 225 microns in the structures of angle and plates.
Mani Engineering Works (BID ID -1389713)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid