Loading…
Loading…
Tender Value
₹18.9 L
EMD Value
₹37,740
Closing Date
16 Jul 2026, 5:00 pm
Executive Engineer
Charisharief
Development of Chowkidar Quarters at Yousmarg, Furniture and furnishing along with Sinages for various assets at Yousmarg
2026_PWDJK_314706_2
E_NIT_NO.09 OF 2026-27 DATED.04.07.2026
Open Tender
Civil Works
90 days
Yousmarg
As per NIT
3 documents required · 3 mandatory
₹800
Executive Engineer RNB Division
₹37,740
6 Jul 2026
6 Jul 2026
17 Jul 2026
6 Jul 2026
16 Jul 2026
6 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Chowkidar Quarter for Hut No. 02 & 04 at Yousmarg | |||||
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : 50 meter beyond 1 m from cutting edge | 16.02 | cum | 673.3 | ₹10,786.27 |
| 3 | Providing and laying of stone soling in trenches hand packed all inclusive leads, lifts, loading, unloading, head load, ramming/ dressing and carriage of materials from approved nearest sources to site of work . Complete job. | 13.91 | cum | 1,000 | ₹13,910 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 3.35 | cum | 5,202.9 | ₹17,429.72 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 2.14 | Cum | 7,788.4 | ₹16,667.18 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 3.07 | Cum | 9,821.85 | ₹30,153.08 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 391 | Kg | 123.2 | ₹48,171.2 |
| 8Centering and shuttering including strutting, propping etc. and removal of form work for: | |||||
| 8.01 | Foundations, footings, bases for columns etc for mass concrete | 77.15 | Sqm | 286.35 | ₹22,091.9 |
| 8.02 | Suspended floors, roofs, landings, balconies and access platforms. | 24.58 | Sqm | 718.2 | ₹17,653.36 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_1019331.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid