Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAccepted-Finance | L1 | Accepted-Finance Rates of Bidder are below estimated rates and also 1st lowest among two. | |
| 2 | L2₹8.3 L+₹2.4 L (41.5%)Rejected-Finance | L2 | Rejected-Finance Rates of Bidder are below estimated rates and also higher among three. | |
| 3 | L3₹8.9 L+₹3.1 L (52.0%)Rejected-Finance | L3 | Rejected-Finance Rates of Bidder are below estimated rates and also higher among three. |
| Sl No | Description | Qty | Unit | m/s sharam singh contractors L2 | MS SHAMIM CONTRACTOR L3 | NANDINI ENTERPRISES L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in foundation in wet soil including lift up to 1.50 m and lead up to 30 m and including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the side of foundation trenches. | 103.75 | cum | 109 ₹11,308.2 | 117 ₹12,138.17 | 80 ₹8,299.6 Lowest |
| 2.00 | Centering and shuttering (steel shuttering) for C.C. work up to 3.0 m height including cost of all labour, material and T&P etc. required for proper completion of work. | 22.46 | sqm | 412 ₹9,255.58 | 441 ₹9,907.06 | 295 ₹6,627.17 Lowest |
| 3.00 | Providing and Laying M-10 (C.C.1:3:6) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 17.94 | cum | 4,727 ₹84,821.29 | 5,082.4 ₹91,198.59 | 3,970 ₹71,237.68 Lowest |
| 4.00 | Laying R.C.C. 1:1.5:3 Mix (M-20) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering. | 16.98 | cum | 5,743 ₹97,527.63 | 6,175 ₹1,04,863.85 | 4,380 ₹74,381.16 Lowest |
| 5.00 | Brick work in 1:4 cement mortar in Abutment, Wing wall & Parapet etc.up to 3 m lift and 60 M lead including cost of all material, labour and T&P required for proper completion of work. | 35.41 | cum | 4,333 ₹1,53,448.86 | 4,658.6 ₹1,64,979.66 | 2,600 ₹92,076.4 Lowest |
| 6.00 | Cement pointing in 1:2 cement mortar (struck deep) on brick masonary including cost of all material, labour and T&P etc. required for proper completion of work. | 43.48 | sqm | 96 ₹4,173.7 Lowest | 102.4 ₹4,451.94 | 490 ₹21,303.24 |
| 7.00 | Centering and shuttering (steel shuttering) for R.C.C. work up to 3.0 m height including cost of all labour, material and T&P etc. required for proper completion of work. | 43.87 | sqm | 677 ₹29,699.99 | 726 ₹31,849.62 | 490 ₹21,496.3 Lowest |
| 8.00 | Providing Steel Reinforcement including cutting, bending & binding in position including cost of bindingwire and also including all cost of labour, material and T&P etc. required for proper completion of work. | 1.57 | M.T | 59,919 ₹94,202.91 | 64,432.2 ₹1,01,298.44 | 45,000 ₹70,747.69 Lowest |
| 9.00 | Laying R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 20 mm down graded stone grit in wearing coat including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement. | 4.3 | cum | 6,423 ₹27,625.32 | 6,906.1 ₹29,703.14 | 4,950 ₹21,289.95 Lowest |
| 10.00 | Providing and fixing Drainage Spouts (100 mm dia) complete including cost of all material, labour and T&P etc. required for proper completion of work. | 1.98 | R.M | 127 ₹250.95 Lowest | 136 ₹268.74 | 600 ₹1,185.6 |
Tender Value
₹10.1 L
EMD Value
₹20,180
Closing Date
29 Aug 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
RAJEEV KUMAR EXECUTIVE ENGINER
EXECUTIVE ENGINEER, MADHYA GANGA CANAL CONSTRUCTION DIVISION-9, SAMBHAL
CONSTRUCTION OF V.R.B AT KM 4.740 OF MUBARAKPUR MINOR.
2026_UPIDC_1178273_1
03/EE/2026-27
Open Tender
Civil Works - Canal
Item Rate
45 days
MUBARAKPUR
PLEASE REFER TENDER DOCUMENT
3 documents required · 3 mandatory
₹516
₹20,180
Yes
SAMBHAL
19 Sept 2026
21 Aug 2026
29 Aug 2026
21 Aug 2026
29 Aug 2026
21 Aug 2026
25 Aug 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in foundation in wet soil including lift up to 1.50 m and lead up to 30 m and including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the side of foundation trenches. | - | cum | - | - |
| - | Centering and shuttering (steel shuttering) for C.C. work up to 3.0 m height including cost of all labour, material and T&P etc. required for proper completion of work. | 1 | sqm | - | - |
| - | Providing and Laying M-10 (C.C.1:3:6) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 1 | cum | - | - |
| - | Laying R.C.C. 1:1.5:3 Mix (M-20) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering. | 1 | cum | - | - |
| - | Brick work in 1:4 cement mortar in Abutment, Wing wall & Parapet etc.up to 3 m lift and 60 M lead including cost of all material, labour and T&P required for proper completion of work. | - | cum | - | - |
| - | Cement pointing in 1:2 cement mortar (struck deep) on brick masonary including cost of all material, labour and T&P etc. required for proper completion of work. | - | sqm | - | - |
| - | Centering and shuttering (steel shuttering) for R.C.C. work up to 3.0 m height including cost of all labour, material and T&P etc. required for proper completion of work. | 1 | sqm | - | - |
| - | Providing Steel Reinforcement including cutting, bending & binding in position including cost of bindingwire and also including all cost of labour, material and T&P etc. required for proper completion of work. | 0.46 | M.T | - | - |
| - | Laying R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 20 mm down graded stone grit in wearing coat including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement. | - | cum | - | - |
| - | Providing and fixing Drainage Spouts (100 mm dia) complete including cost of all material, labour and T&P etc. required for proper completion of work. | - | R.M | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.20 MB
Tendernotice_2.pdf
PDF • 4.01 MB
BOQ_2214122.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .