Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Finance | -38.11% | ₹5.0 L | L1 | Admitted-Finance |
| 2 | L2₹5.0 LAdmitted-Finance | -37.57% | ₹5.0 L | L2 | Admitted-Finance |
| 3 | L3₹5.0 LAdmitted-Finance | -37.35% | ₹5.0 L | L3 | Admitted-Finance |
| 4 | L4₹5.1 LAdmitted-Finance | -36.37% | ₹5.1 L | L4 | Admitted-Finance |
| 5 | L5₹5.1 LAdmitted-Finance | -36.25% | ₹5.1 L | L5 | Admitted-Finance |
Tender Value
₹8 L
EMD Value
₹16,000
Closing Date
5 Mar 2026, 6:55 pmClosed
Executive Engineer REW Division Poonch
Executive Engineer REW Division Poonch
Please refer to Boq
2026_RDPR_304736_2
e-NIT 266 of REW Poonch 2025-26 Date 27-02-2026
Open Tender
Civil Works
30 days
Poonch
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Executive Engineer REW Division Poonch
₹16,000
11 Mar 2026
27 Feb 2026
6 Mar 2026
27 Feb 2026
5 Mar 2026
27 Feb 2026
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : 80% Ordinary Rock 20%
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases of columns etc. for mass concrete.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level
Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
Centering and shuttering including strutting, propping etc. and removal of form for: Columns, pillars, piers, abutments, posts and struts.
Carriage of Sand/Agg. 10 Kmt. By MT
Add the Cost of CIB
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
BOQ_989914.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid