Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹73.7 LAccepted-AOC H N 9 12 CHIRANJEEV VIHAR GHAZIABAD | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | L1 | Accepted-AOC Tender Cost Including 18 percent GST | |
| 2 | L2₹69.5 L+₹7.1 L (11.3%)Rejected-AOC A 51 SHALIMAR GARDEN EX 2 SAHIBABAD DISTRICT GHAZIABAD UTTAR PRADESH | SAHIBABAD | GHAZIABAD | UTTAR PRADESH | L2 | Rejected-AOC L2 | |
| 3 | L3₹70.8 L+₹8.3 L (13.3%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹82.8 L+₹20.3 L (32.5%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹87.2 L+₹24.7 L (39.6%)Rejected-AOC | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | SUBHASH SINGH RANA L3 | Durga Engineers and Earth Movers L7 | ARTIST BRO L2 | Mukut Bihari Lal Contractor L5 | JAI LAXMI CONTRACTOR L4 | AJAY SHARMA L1 | M/S S K BUILDERS L6 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | SUPPLYING OF DRY SPLIT STONE (20 KG. TO 40 KG. WT.) AT WORKSITE INCLUDING LOADING, UNLOADING, STACKING, COST OF STONE, COST OF LABOUR, T&P, ROYALTY AND ALL OTHER TAXES BUT EXCLUDING G.S.T. , ETC. COMPLETE. | 4,494.14 | M3 | 1,395 ₹62,69,325.3 | 1,699 ₹76,35,543.86 | 1,350 ₹60,67,089 | 1,710 ₹76,84,979.4 | 1,650 ₹74,15,331 | 1,200 ₹53,92,968 Lowest | 1,850 ₹83,14,159 |
| 2.00 | LAYING AND PLACING OF SPLIT STONE IN LAUNCHING APRON OF STUD I/C COST OF LABOUR, T&P, AND ALL OTHER TAXES BUT EXCLUDING COST OF SPLIT STONE, ETC. COMPLETE. | 4,017.82 | M3 | 100 ₹4,01,782 Lowest | 345 ₹13,86,147.9 | 130 ₹5,22,316.6 | 140 ₹5,62,494.8 | 122 ₹4,90,174.04 | 100 ₹4,01,782 Lowest | 100 ₹4,01,782 Lowest |
| 3.00 | Laying Dry Split Stone Pitching in Stud i/c Labour, T&P and all other Taxes etc. complete but excluding cost of split stone etc complete. | 134.32 | M3 | 300 ₹40,296 Lowest | 450 ₹60,444 | 300 ₹40,296 Lowest | 350 ₹47,012 | 340 ₹45,668.8 | 396 ₹53,190.72 | 300 ₹40,296 Lowest |
| 4.00 | Supplying GI wire crate 8 SWG GI wire of size 3.00x1.50x1.00 M and 15cmx15cm mesh double knotted i/c all cost of material, labour and T&P complete. | 76 | Nos | 2,700 ₹2,05,200 | 2,295 ₹1,74,420 | 2,000 ₹1,52,000 Lowest | 2,900 ₹2,20,400 | 2,700 ₹2,05,200 | 3,000 ₹2,28,000 | 2,670 ₹2,02,920 |
| 5.00 | Laying and placing split stone in GI wire crate 8 SWG GI wire of size 3.00x1.50x1.00 M and 15cmx15cm mesh double knotted filled with boulder i/c all cost of material, labour and T&P complete. | 342 | M3 | 470 ₹1,60,740 | 315 ₹1,07,730 Lowest | 500 ₹1,71,000 | 600 ₹2,05,200 | 350 ₹1,19,700 | 500 ₹1,71,000 | 475 ₹1,62,450 |
Tender Value
₹1.2 Cr
EMD Value
₹2.4 L
Closing Date
16 Mar 2026, 5:00 pmClosed
Superintending Engineer Drainage Circle Gzb
near victoria park colony Meerut
Damaged anti-erosion work constructed earlier between Km. 21.800 and Km. 22.300 of Hindon-Yamuna Doab bund on the left bank of Yamuna River in Gautam Buddha Nagar district.
2026_UPIDC_1122007_7
07/SE/2025-26
Open Tender
Civil Works
Item Rate
90 days
Ghaziabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹2.4 L
Office of S.E.Drainage Circle gzb Meerut
30 Mar 2026
11 Mar 2026
17 Mar 2026
11 Mar 2026
16 Mar 2026
11 Mar 2026
12 Mar 2026
SUPPLYING OF DRY SPLIT STONE (20 KG. TO 40 KG. WT.) AT WORKSITE INCLUDING LOADING, UNLOADING, STACKING, COST OF STONE, COST OF LABOUR, T&P, ROYALTY AND ALL OTHER TAXES BUT EXCLUDING G.S.T. , ETC. COMPLETE.
LAYING AND PLACING OF SPLIT STONE IN LAUNCHING APRON OF STUD I/C COST OF LABOUR, T&P, AND ALL OTHER TAXES BUT EXCLUDING COST OF SPLIT STONE, ETC. COMPLETE.
Laying Dry Split Stone Pitching in Stud i/c Labour, T&P and all other Taxes etc. complete but excluding cost of split stone etc complete.
Supplying GI wire crate 8 SWG GI wire of size 3.00x1.50x1.00 M and 15cmx15cm mesh double knotted i/c all cost of material, labour and T&P complete.
Laying and placing split stone in GI wire crate 8 SWG GI wire of size 3.00x1.50x1.00 M and 15cmx15cm mesh double knotted filled with boulder i/c all cost of material, labour and T&P complete.
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
BookletalldivWork.pdf
Tender Documents • 2.48 MB
BOQ_2093188.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .