| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.0 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹25.3 L+₹25,823.12 (1.03%)Admitted-Finance 0 0 RAMNAGAR FATEHPUR ROAD KADIRABAD GRAM BUDHWAL PARGANA AND TEHSIL RAMNAGAR BARABANKI UTTAR PRADESH 225202 | BARABANKI | UTTAR PRADESH | 225202 | L2 | Admitted-Finance | |
| 3 | L3₹25.5 L+₹46,328.17 (1.85%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | KRISHNA ENTERPRISES L3 | SHRI SIDDH VINAYAK CONTRACTOR L1 | M/s Shiva Enterprises L2 |
|---|---|---|---|---|---|---|
| 2.00Earth Work | ||||||
| 2.10 | DEWATERING BEFORE AND DURING DIGGING | 327 | Hrs | 206.47 ₹67,515.69 | 202.73 ₹66,292.71 Lowest | 204.82 ₹66,976.14 |
| 2.20 | Earth work in Excavation in , Ordinary Soil andSlush (Lahel) with Poclain Machine including disposal at near pond suitiable place for Slush by tractor trolly | 21,825.85 | Cum | 86.94 ₹18,97,539.4 | 85.36 ₹18,63,054.56 Lowest | 86.24 ₹18,82,261.3 |
| 3.00Construction of Inlet (2Nos.) | ||||||
| 3.10 | Earth work in excavation in ordinary soil Lift upto 1.5 m & lead upto 30 m & including filling, watering and ramming of excavated earth | 48.02 | m3 | 88.91 ₹4,269.28 | 87.3 ₹4,191.97 Lowest | 88.2 ₹4,235.19 |
| 3.20 | Supply and Laying of Cement Concrete in 1:4:8 With Cement, Fine Sand and 40mm Brick Ballast in foundation Complete in All Respect . | 7.19 | m3 | 2,845.15 ₹20,450.94 | 2,793.6 ₹20,080.4 Lowest | 2,822.4 ₹20,287.41 |
| 3.30 | M-150 Brick Work in Foundation in 1:4 With Cement and Fine Sand Mortar Complete in all Respect. | 18.07 | m3 | 4,099.79 ₹74,075.01 | 4,025.5 ₹72,732.73 Lowest | 4,067 ₹73,482.56 |
| 3.40 | Cement concrete work in 1:2:4 with cement coarse sand and 20 mm Grit Stone Ballast | 2.86 | m3 | 5,216.11 ₹14,907.64 | 5,121.6 ₹14,637.53 Lowest | 5,174.4 ₹14,788.44 |
| 3.50 | 12 mm Thick Plaster Work in 1:4 Cement and Fine Sand Mortar Complete in all Respect. | 29.01 | M2 | 148.19 ₹4,298.7 | 145.5 ₹4,220.66 Lowest | 147 ₹4,264.18 |
| 3.60 | Supply of 900mm Dia R.C.C. Hume Pipe NP-3 (S&S Type) | 20 | RM | 4,719.2 ₹94,384 | 4,633.69 ₹92,673.8 Lowest | 4,681.46 ₹93,629.2 |
Tender Value
Refer Docs
EMD Value
₹2.5 L
Closing Date
20 Feb 2021, 10:00 amClosed
EE MI Saharanpur
EE MI Saharanpur
2.Pond Renovation in Fugana (khera mastan ) talab at Budhana district Muzaffarnagar
2021_UPMID_555103_2
TN No.908/MI/E-Tender date 06-02-2021
Open Tender
Civil Works - Water Works
Item Rate
30 days
muzaffarnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
EE MI Saharanpur
₹2.5 L
Yes
20 Feb 2021
15 Feb 2021
20 Feb 2021
15 Feb 2021
20 Feb 2021
15 Feb 2021
Amount
Earth Work
DEWATERING BEFORE AND DURING DIGGING
Earth work in Excavation in , Ordinary Soil andSlush (Lahel) with Poclain Machine including disposal at near pond suitiable place for Slush by tractor trolly
Construction of Inlet (2Nos.)
Earth work in excavation in ordinary soil Lift upto 1.5 m & lead upto 30 m & including filling, watering and ramming of excavated earth
Supply and Laying of Cement Concrete in 1:4:8 With Cement, Fine Sand and 40mm Brick Ballast in foundation Complete in All Respect .
M-150 Brick Work in Foundation in 1:4 With Cement and Fine Sand Mortar Complete in all Respect.
Cement concrete work in 1:2:4 with cement coarse sand and 20 mm Grit Stone Ballast
12 mm Thick Plaster Work in 1:4 Cement and Fine Sand Mortar Complete in all Respect.
Supply of 900mm Dia R.C.C. Hume Pipe NP-3 (S&S Type)
Fixing of joints in 900mm Dia R.C.C. Hume Pipe with Jute and cement etc. Including cost of labour material and T&P Complete in All Respect .
Laying of 900mm Dia R.C.C. Hume Pipe in position including labour and T&P Complete in All Respect .
Construction of Outlet
Earth work in excavation in ordinary soil Lift upto 1.5 m & lead upto 30 m & including filling, watering and ramming of excavated earth
Supply and Laying of Cement Concrete in 1:4:8 With Cement, Fine Sand and 40mm Brick Ballast in foundation Complete in All Respect .
M-150 Brick Work in Foundation in 1:4 With Cement and Fine Sand Mortar Complete in all Respect.
Cement concrete work in 1:2:4 with cement coarse sand and 20 mm Grit Stone Ballast
12 mm Thick Plaster Work in 1:4 Cement and Fine Sand Mortar Complete in all Respect.
Supply of 450mm Dia R.C.C. Hume Pipe NP-3 (S&S Type)
Fixing of joints in 450mm Dia R.C.C. Hume Pipe with Jute and cement etc. Including cost of labour material and T&P Complete in All Respect .
Laying of 450mm Dia R.C.C. Hume Pipe in position including labour and T&P Complete in All Respect .
Construction of Animal Ramp
Earth work in excavation complete with all labour T&P
Supply and Laying of Cement Concrete in 1:4:8 With Cement, Fine Sand and 40mm Brick Ballast in foundation Complete in All Respect .
M-150 Brick Work in Foundation in 1:4 With Cement and Fine Sand Mortar Complete in all Respect.
Cement concrete work in 1:2:4 with cement coarse sand and 20 mm Grit Stone Ballast
12 mm Thick Plaster Work in 1:4 Cement and Fine Sand Mortar Complete in all Respect.
Iron sign board Granite marble
M/s Shiva Enterprises
KRISHNA ENTERPRISES
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .