Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance R O BAGHJOGI LANKER RAINAWARI SRINAGAR | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4 L
Closing Date
10 Sept 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
OFFICE OF THE EXECUTIVE ENGINEER REW ANANTNAG
OFFICE OF THE EXECUTIVE ENGINEER REW ANANTNAG
C/O XING NEAR MASJID SHAREEF HERMULSOO BLOCK KHOVERIPORA
2022_RDPR_185892_1
ENIT279of2022-23
Open Tender
Civil Works
Item Rate
30 days
anantnag
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
OFFICE OF THE EXECUTIVE ENGINEER REW ANANTNAG
Exempted
12 Sept 2022
29 Aug 2022
12 Sept 2022
29 Aug 2022
10 Sept 2022
29 Aug 2022
Amount
Demolishing Cement Concrete manually/Mechanical means incl disposal of material
Earth work in excavation by manual means in trenches, drains, pipes, cables etc (Not exceeding 1.5mtr in width) and for shafts, wells, cesspits and the like not exceeding 10 Sq.M in plan, depth up to 1.5 mtr including disposal of excavated earth up to 1mtr from cutting edge, disposed earth is to be levelled and neatly dressed in all kinds of soil. with all leads , lifts carriages complete.
Providing, supplying laying and filling including hand packing in foundation and plinth dry stone soling with all leads , lifts carriages complete.
Provifding and laying of cement concrete of specified grade excluding the cost of centering and shuttering using mix M10 (1:3:6) with 40mm NSA A) Abutments
Placing and laying of plums (20% Qty.)
Provifding and laying of RCC in (1:1.5:3) mix M20 grade with aggregate size as 20mm NSA.
Centring and shuttering including strutting propping etc. and removal of form for:-Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. ABUTS
Sides
Lining Wall
P/fixing of reinforcement i/c cutting , bending, straightening etc complete job
Laying of nallah much/quarry for levelling of surface i.c carriage lead upto 5Km by MT
Suppy and stacking of stone aggregates(65-45mm size), with an average leda of 25 Km by MT
Suppy and Spreading of stone aggregate11.2 mm thick nominal size i/c carriage lead upto 30 kms
Supply and stacking of crusher dust at an average lead of 20Km lead by MT
Laying of WBM to specific lines, grades and cross sections with binding material i/c consolidation with PRR 8-10 ton capacity
Carriage of materials Sand/Bajri @25 Kms
Add provision for carriage of cement ar site i/c loading and unloading of same including H/L
Add provision for site c;earance by way of cutting down of shrubs, silt clearance, dewatering, Approach filling, Wheel Guard Concreteing, Railing and other unforceen items
Provision for signboard, photographs and other unforeseen items(STA)
JALAL U DIN ITOO
FAROOQ AHMAD TANTRAY
ISHRAT GULZAR
M/S FAYAZ AHMAD GANIE
SHAKEEL AHMAD DAR
ABDUL HAMID MAGRAY
MOHD AYUB WANI
ZAHID AZIZ GANIE
GH RASOOL BHAT
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .