Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-AOC | ₹5.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹6.4 LRejected-AOC | ₹6.4 L | L2 | Rejected-AOC L2 |
| 3 | L3₹6.4 LRejected-AOC | ₹6.4 L | L3 | Rejected-AOC L3 |
| 4 | L4₹6.4 LRejected-AOC | ₹6.4 L | L4 | Rejected-AOC L4 |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
15 May 2026, 3:00 pmClosed
G.M (Jal), Nagar Nigam Saharanpur
G.M (Jal), Nagar Nigam Saharanpur
Unit Rate For Installation of water misting system various sites in the Nagar Nigam Area
2026_NNSAH_1146560_1
WW/797/BF/2026-27
Open Tender
Civil Works - Water Works
365 days
Nagar Nigam Area
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,596
₹1 L
21 May 2026
8 May 2026
15 May 2026
8 May 2026
15 May 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Installation of Solar Smart Heat wave Controller and Misting System, Water Consumption & Efficiency: Calibrated to utilize 3000 liters of water efficiently over a 8-hour operational period. Pipeline Coverage: Includes a 100-meter heavy-duty pipeline network for optimal distribution. Fogging Units: 5 to 7 strategically placed fogger groups, with 5 high-pressure fogging nozzles in each group (Total 25 to 35 nozzles) to ensure maximum coverage.Smart Automation: Equipped with a Smart Controller for automated on/off scheduling and misting intervals. Monitoring: Integrated Water Level Indicator to monitor the 3000-liter storage in real-time.(Current/1st year) Including O&M work for 3 to 4 Month with all T&P and Labour also including dismentling of system & keep in JalKal store. | - | Job | 4,20,000 | - | 1 |
| 2 | 2nd Year, (Taking all Material from JalKal Store & Installation on same place with replacement of rejected parts like some Nozzles/High pressure nylone pipes/filter media/service of high pressure pump motor).Including O&M work for 3 to 4 month. | - | Job | 1,05,000 | - | - |
| 3 | 3rd Year (Taking all Material from JalKal Store & Installation on same place with replacement of rejected parts like some Nozzles/High pressure nylone pipes/filter media/service of high pressure pump motor) | - | Job | 1,26,000 | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.39 MB
BOQ_2144290.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid