Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-AOC | ₹5.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹6.4 L+₹1.3 L (26.3%)Rejected-AOC | ₹6.4 L+₹1.3 L (26.3%) | L2 | Rejected-AOC L2 |
| 3 | L3₹6.4 L+₹1.3 L (26.6%)Rejected-AOC | ₹6.4 L+₹1.3 L (26.6%) | L3 | Rejected-AOC L3 |
| 4 | L4₹6.4 L+₹1.4 L (27.2%)Rejected-AOC | ₹6.4 L+₹1.4 L (27.2%) | L4 | Rejected-AOC L4 |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
15 May 2026, 3:00 pmClosed
G.M (Jal), Nagar Nigam Saharanpur
G.M (Jal), Nagar Nigam Saharanpur
Unit Rate For Installation of water misting system various sites in the Nagar Nigam Area
2026_NNSAH_1146560_1
WW/797/BF/2026-27
Open Tender
Civil Works - Water Works
Percentage
365 days
Nagar Nigam Area
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,596
₹1 L
21 May 2026
8 May 2026
15 May 2026
8 May 2026
15 May 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Installation of Solar Smart Heat wave Controller and Misting System, Water Consumption & Efficiency: Calibrated to utilize 3000 liters of water efficiently over a 8-hour operational period. Pipeline Coverage: Includes a 100-meter heavy-duty pipeline network for optimal distribution. Fogging Units: 5 to 7 strategically placed fogger groups, with 5 high-pressure fogging nozzles in each group (Total 25 to 35 nozzles) to ensure maximum coverage.Smart Automation: Equipped with a Smart Controller for automated on/off scheduling and misting intervals. Monitoring: Integrated Water Level Indicator to monitor the 3000-liter storage in real-time.(Current/1st year) Including O&M work for 3 to 4 Month with all T&P and Labour also including dismentling of system & keep in JalKal store. | - | Job | 4,20,000 | - |
| 2 | 2nd Year, (Taking all Material from JalKal Store & Installation on same place with replacement of rejected parts like some Nozzles/High pressure nylone pipes/filter media/service of high pressure pump motor).Including O&M work for 3 to 4 month. | - | Job | 1,05,000 | - |
| 3 | 3rd Year (Taking all Material from JalKal Store & Installation on same place with replacement of rejected parts like some Nozzles/High pressure nylone pipes/filter media/service of high pressure pump motor) | - | Job | 1,26,000 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.39 MB
BOQ_2144290.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .